Infrastructure and Energy Sector

rone

Regular Member
Joined
Dec 23, 2016
Messages
933
Likes
3,025
Country flag
Ya'll Nibbiars The the current status of Coach B9 in 12424 Rajdhani express entire coach is fully packed with people that can't even go to for the bathroom as peoples lying on floor.

View attachment 232504
Where is the railway police, why non reserved traveler's in ac compartments? It's ok it was a non sleeper coach but also in ac ? Wtf
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
29,636
Likes
113,926
Country flag
Where is the railway police, why non reserved traveler's in ac compartments? It's ok it was a non sleeper coach but also in ac ? Wtf
Ya'll Nibbiars when I posted about the se thing few months ago in the the First Class, some members said Aisa hei hota hai. It become a normal for few nibbas here.
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
29,636
Likes
113,926
Country flag
Ya'll Nibbiars


Ya'll Nibbiars The MTHL is probably the First Big Project ever tk be completed before the deadline. The work started on 23 April, 2018, and is set to be opened by 25 December 2023. In record 68 Months.
 

SKC

Senior Member
Joined
Aug 16, 2014
Messages
9,043
Likes
31,063
Country flag
Ya'll Nibbiars when I posted about the se thing few months ago in the the First Class, some members said Aisa hei hota hai. It become a normal for few nibbas here.
It was common scene in unreserved and reserved Sleeper coaches in trains going towards Bihar and then to Bengal and East.
Now it is becoming common scene in 3rd AC and 2nd AC too!
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
29,636
Likes
113,926
Country flag
Ya'll Nibbiars The The Under construction tunnels of Chennai Metro Phase II which in few years will have driverless trains pass through them.

GBW5TzbacAANtqF.jpeg
GBW5TzYaYAAV7ED.jpeg
GBW5TzbaoAAfkwO.jpeg
GBW5TzYaIAAKyqR.jpeg
 

ezsasa

Designated Cynic
Mod
Joined
Jul 12, 2014
Messages
32,187
Likes
149,284
Country flag
Ayodhya is getting a infra boost, in a short period of time, they are getting new/redeveloped railway stations, airport, 100 ft roads with foot paths, under ground sewer, under ground electric cabling, redevelopment of old land marks etc . all of this at the same time.


any idea how much is planned to be spent? to get an idea on how much money does it take for govt to do this kind of massive public infra makeover.
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
29,636
Likes
113,926
Country flag
Ayodhya is getting a infra boost, in a short period of time, they are getting new/redeveloped railway stations, airport, 100 ft roads with foot paths, under ground sewer, under ground electric cabling, redevelopment of old land marks etc . all of this at the same time.


any idea how much is planned to be spent? to get an idea on how much money does it take for govt to do this kind of massive public infra makeover.
Ya'll Nibbiars 30,923 Crore Rupees over a decade on 20 projects. Will be Vatican, Macca, Bodhgaya of Hindus soon.

 
Last edited:

ezsasa

Designated Cynic
Mod
Joined
Jul 12, 2014
Messages
32,187
Likes
149,284
Country flag
Ya'll Nibbiars 30,923 Crore Rupees over a decade on 20 projects. Will be Vatican, Macca, Bodhgaya of Hindus soon.

to get an flavour on what all is happening right now, some projects might have already been completed last few years.

air port

Ayodhya janmabhoomi path

ayodhya junction | ayodhya junction railway station | ayodhya railway station

Ayodhya RamPath Road Widening Project update

Ayodhya Dharmpath Marg new update

Ayodhya bhakti path marg
https://youtu.be/YGieYlwwGqY

Ayodhya surya kund
https://youtu.be/ScI-8Ib4kFA

Ayodhya railway station latest update
https://youtu.be/T1xvBIk4VqM
 

Varoon2

Senior Member
Joined
Mar 22, 2021
Messages
1,283
Likes
4,469
Country flag
I am positive that this company folded 5 or more years ago, they went bankrupt or couldn't repay their debts. But from this write-up in Wiki, they are very much in operation, and won a contract from the Himachal gov't this past April.

It had major problems, but it has revived

 

RoaringTigerHiddenDragon

Senior Member
Joined
Sep 5, 2020
Messages
4,070
Likes
17,374
Country flag
LA issues in Maharashtra during MVA rule delayed the project. Now, work is going on in full swing and progress is good. Check the progress for yourself:


Don't compare with other countries like Indonesia. They built only 100 km of tracks. Here, we're building 500+km of viaducts and tunnels.
Underwater thane creek tunnel is challenging.
 

Latest Replies

Global Defence

New threads

Articles

Top