What is the reason behind this big delay? All that jumla over modular construction and the keel laying to delivery pace has barely improved
What is the reason behind this big delay? All that jumla over modular construction and the keel laying to delivery pace has barely improved
Just 8 brahmos !!!! It has to be min 12....What is the reason behind this big delay? All that jumla over modular construction and the keel laying to delivery pace has barely improved
F 18 is a big laibaikity, Rafales are not suited for the carrier. Russian jets are not an option
Indigenous option is not even conceptualized
No deal for the next 5 years.
This has been discussed a lot. i.e) Compared to ships of same weight class IN ships are under armed. Either we are having issue with cost related to maintenance or we are waiting for the UVLS system.Just 8 brahmos !!!! It has to be min 12....
Thats for destroyers, for frigates its standard to have 8 AShM and 32 anti air. Can check against chinese Type 54 or american upcoming constellation class.This has been discussed a lot. i.e) Compared to ships of same weight class IN ships are under armed. Either we are having issue with cost related to maintenance or we are waiting for the UVLS system.
Not sure. Depends on how other projects are going. IN planned to have 18 SSK but now it seems the number will be around 12 with a mix of old and new subs by 2035.What do you reckon is going to happen to those subs whose MLU isn't planned as in do you expect the MLU to eventually happen or are they going to serve as target practice?
It is not just that. We are also focusing alot on endurance and capability to carry more stuff at sea as we don't have alot of support ships.This has been discussed a lot. i.e) Compared to ships of same weight class IN ships are under armed. Either we are having issue with cost related to maintenance or we are waiting for the UVLS system.
IMO, we have to play by our own rules and don't need to follow some global trend.Thats for destroyers, for frigates its standard to have 8 AShM and 32 anti air. Can check against chinese Type 54 or american upcoming constellation class.
From what I heard there were some design changes which caused the delay alon with the Covid stuff.What is the reason behind this big delay? All that jumla over modular construction and the keel laying to delivery pace has barely improved
IIRC the last of the Kilo class subs were inducted in the late 90s. Even if one were to consider 2000 as the cut off date , in spite of all these MLUs they'd be close to 35 yrs old in 2035 which means they'd likely be retired by then . That leaves us with only 6 nos Kalvari class subs .Not sure. Depends on how other projects are going. IN planned to have 18 SSK but now it seems the number will be around 12 with a mix of old and new subs by 2035.
These 6 subs will most probably serve for another 10-15 years.IIRC the last of the Kilo class subs were inducted in the late 90s. Even if one were to consider 2000 as the cut off date , in spite of all these MLUs they'd be close to 35 yrs old in 2035 which means they'd likely be retired by then . That leaves us with only 6 nos Kalvari class subs .
15 yrs would take it to 2040 which translates to the youngest of them being 40 yrs + . Seems very unlikely especially given these are of Soviet make which isn't known exactly for its longevity & durability. The last thing we want is a mishap Indonesian Navy style.These 6 subs will most probably serve for another 10-15 years.
They have to serve because old sub is better than no sub. They could have gone for more Kalvari class instead of doing the MLU but what to say.15 yrs would take it to 2040 which translates to the youngest of them being 40 yrs + . Seems very unlikely especially given these are of Soviet make which isn't known exactly for its longevity & durability. The last thing we want is a mishap Indonesian Navy style.
Or Navy has its cards close to the chest and does not want to reveal all the details in wikipedaThis has been discussed a lot. i.e) Compared to ships of same weight class IN ships are under armed. Either we are having issue with cost related to maintenance or we are waiting for the UVLS system.
Without decent weapons payload and single engine.
The Navy has requested some changes to the parameters of this ship post launching phase.What is the reason behind this big delay? All that jumla over modular construction and the keel laying to delivery pace has barely improved
Unka Goliath crane collapsed back in 2016 or so. The only crane capable of doing 250tonne module transportWhat is the reason behind this big delay? All that jumla over modular construction and the keel laying to delivery pace has barely improved
I agree, but it just shows they arent underarmed.IMO, we have to play by our own rules and don't need to follow some global trend.
You really did let your frustration out didn't you ? Thanks, helped me too...PM Gobi can't even sign a contract for those Predator/Reaper drones just because Italian piddi & party are barking, and you expect him to buy the radioactive Rafale jets or (((American))) F-18s which probably won't be able to takeoff or land properly on our size 0 carriers ?
Truly I say to you, a war will come in the future and we will get our asses handed over back to us, and only then will all these clowns get their shit together.
Procurement is totally fucked across all 3 services with all 3 lobbies of Babu, Politician/Govt and Generols, Admirols,Air Marshlols not letting any solid procurements happen, (((officer))) class buys tiny quantities of Atmanirbhar DRDO platforms, Govt forces atmanirbhar and pisses on fantasies of IMPORT HI IMPORT hoga of officer class, and idk babuz being babuz, probably agents of various foreign vendors
Atleast only silver lining is Navy/Shipyards atleast manages to make our own ships, even though for Subs they still depend on foreign vendors.
( WAR IS GOD SEND)You really did let your frustration out didn't you ? Thanks, helped me too...
Defence procurement really is a clusterfk and corrupt edifice which No Modi-jee will ever touch.
Maybe even yogi-ji will not touch, God knows how we will ever come out of this mess....unless some miracle happens (or god forbid a war...)
Thread starter | Similar threads | Forum | Replies | Date |
---|---|---|---|---|
Indian navy railgun development | Indian Navy | 75 | ||
Very concerned with development of Indian navy: Pakistan naval chief | Indian Navy | 10 | ||
W | Adani PLR system deliver 500 Masada made in India pistol to Indian navy | Indian Navy | 0 | |
W | Rafale and F 18 super hornet shortlisted by Indian navy | Indian Navy | 21 |