Not even the flight trials are completed till now. Firing trials are far. Let it complete its basic integration trials first.I have not asked ....will update you. If I get anything....
@Chinmoy is astra fired from Tejas?
Not even the flight trials are completed till now. Firing trials are far. Let it complete its basic integration trials first.I have not asked ....will update you. If I get anything....
@Chinmoy is astra fired from Tejas?
Same reason for not 83k... They don't need more than 123 LCAs in 21st century, but MWF after when the Mark1A delivery is complete.Why airforce doesnt want more Mk1A's? Why only 83 and not 128?
Mk1a is a light combat aircraft....with limited capability......has limited payload and limited enduranceWhy airforce doesnt want more Mk1A's? Why only 83 and not 128?
It is designed to be what it is. It's size etc ain't accidental.Mk1a is a light combat aircraft....with limited capability......has limited payload and limited endurance
So will be operated in limited number
But mwf which will have double payload than mk1a will be operated in 200 numbers
October 5th ka muhurat bhi hogaya, the Mountain Gods are waitingHAL Tejas Mk1A ka order hogaya kya?
Ladai kab hogi, aap pichle 1 mahine se bol rahe ho ki hogi.@Bleh do you have a pic of tejas showing off her twin barreled 23mm gun?
i don't see it it on her wing top.
I don't get your question... Plz elaborate.@Bleh do you have a pic of tejas showing off her twin barreled 23mm gun?
i don't see it it on her wing top.
Yeah ground trials are completed. Air trials yet to be conducted.View attachment 62129
a bit unrelated but this pic was posted few pages back, the gun hasn't been mounted tho HAL is ready after IAF demands.
The crudeness of the build of the area speaks volumes... It's still in prototypic state.View attachment 62129
a bit unrelated but this pic was posted few pages back, the gun hasn't been mounted tho HAL is ready after IAF demands.
Why airforce doesnt want more Mk1A's? Why only 83 and not 128?
The crudeness of the build of the area speaks volumes... It's still in prototypic state.
Mk1a is a light combat aircraft....with limited capability......has limited range and payload.
personally I would have reduced this mark 1a to just 40 planes..same as mark1. to be completed,by 2025..
we really need 150 plus mark2 tejas which is the real.deak a genuine comparably fighter to f16 block 70 or j10c or gripen e.
we really need mark 2 to arrive by 2026 or 2027 latest. forget spending 5 billion on 83 tejas spend 2.5 billion on 40 planes and use the other 2.5 billion for down payment on 36 more Rafale.
what I would have done is
72 Rafale by 2027
80 tejas mark 1 and 1a
80 mig29 upgrades
270 mki
45 mirage 2000 dash 5
then massive order for mark2 in 2027
amca in 2035
interim.purvhsse 50 f35 lightening In 2030.if needed
Thread starter | Similar threads | Forum | Replies | Date |
---|---|---|---|---|
LCA Tejas: Photos & Footages (no text other than headings) | Military Multimedia | 87 | ||
LCA TEJAS and what makes it stand out | Knowledge Repository | 8 | ||
W | Rise of LCA Tejas Multi Role Fighter Aircraft | Indian Air Force | 23 | |
C | LRUs or parts of LCA Tejas Made and designed in India | Indian Air Force | 16 |