Launch: LVM3 M3 with 36 OneWeb (British) Satellites (Second lot) - 26th March 2023 09:00 IST

Indx TechStyle

Kitty mod
Mod
Joined
Apr 29, 2015
Messages
18,240
Likes
55,879
Country flag
CE20 Cryogenic Engine for the next mission of LVM 3 tested for acceptance
The flight acceptance hot test of a CE-20 engine is successfully carried out for a duration of 25 s in the High Altitude Test facility of ISRO Propulsion Complex at Mahendragiri on October 28, 2022. This engine is earmarked for the LVM3-M3 mission identified for the launch of the next set of 36 numbers of OneWeb India-1 satellites.
The cryogenic upper stage of the LVM3 vehicle (C25 stage) is powered by a CE-20 engine working with the LOX-LH2 propellants combination. This engine develops a nominal thrust of 186.36 kN in vacuum.
The major objectives of the flight acceptance test were to confirm the integrity of the hardware, assessment of subsystems' performance and tune the engine for meeting the mission requirements parameters for engine tuning for flight operation. Analysis of test data confirmed the satisfactory performance of the engine systems. This engine will be assembled to the C25 flight stage being integrated for the LVM3 M3 vehicle.
Chamber_Pressure_during_Hot_Test.jpg

Chamber Pressure during Hot Test

Photograph_of_Engine_Test.jpg

Photograph of Engine Test
 

Indx TechStyle

Kitty mod
Mod
Joined
Apr 29, 2015
Messages
18,240
Likes
55,879
Country flag
Mission delayed from January-February timeframe to February-March timeframe. Edited thread title accordingly.
 

Swesh

Senior Member
Joined
Jan 12, 2020
Messages
3,520
Likes
12,178
A0644/23 (Issued for VOMF PART 1 OF 3) - LVM3-M3 ROCKET LAUNCH FM SHAR RANGE,SRIHARIKOTA WILL TAKE
PLACE AS PER FLW DETAILS
.THE LAUNCH WILL BE ON ANY ONE OF
THE DAY DRG THIS PERIOD.ACTUAL DATE OF LAUNCH WILL BE
INTIMATED 24 HR IN ADVANCE THROUGH A SEPARATE NOTAM.
LAUNCH PAD COORD: 134312N 0801348E
NO FLT IS PERMITTED OVER THE DNG ZONES.
DNG ZONE 1: CIRCLE OF 10 NM AROUND THE LAUNCHER.
DNG ZONE 2: AREA ENCLOSED BY THE FLW COORD IN CHENNAI FIR:
114500N 0811000E
121500N 0814500E
110500N 0824500E
093102N 0831224E
095251N 0821751E
104000N 0820500E
114500N 0811000E

RTE AFFECTED IN CHENNAI FIR
W20,Q11,Q23,A465,Q24,V4,V9,B466,P574,L896,N564,N563,T3,

CLOSURES/ALTN RTE FOR OVERFLYING
1.W20 NOT AVBL BTN MMV-KAMGU
ALTN: MMV-DCT-DOHIA-DCT-RAMDO-DCT-KAMGU
2.Q24 NOT AVBL BTN MMV-KAMGU
ALTN: MMV-DCT-DOHIA-DCT-RAMDO-DCT-KAMGU(UNI DIRECTIONAL)
PART 1 OF 3. 0100-0500, 26 MAR 01:00 2023 UNTIL 15 APR 05:00 2023. CREATED:
10 MAR 11:13 2023
A0644/23 (Issued for VOMF PART 2 OF 3) - 3.Q23 NOT AVBL BTN RINTO-MMV
ALTN: RINTO-DCT-TTP-DCT-GUANI-DCT-MMV(UNI DIRECTIONAL)
4.V4 NOT AVBL BTN BOPRI-MMV
ALTN: BOPRI-DCT-RINTO-DCT-TTP-DCT-GUANI-DCT-MMV(UNI DIRECTIONAL)
5.V9 NOT AVBL BTN GUNRI-MMV
ALTN: GUNRI-DCT-GURAS-DCT-KOLCA-DCT-MMV(UNI DIRECTIONAL)
6.Q11 NOT AVBL BTN GURAS-MMV
ALTN: GURAS-DCT-KOLCA-DCT-MMV
7.A465 NOT AVBL BTN GURAS-MMV
ALTN: GURAS-DCT-KOLCA-DCT-MMV
8.B466 NOT AVBL BTN MMV-AVNOS
ALTN: MMV-DCT-AVMOR-DCT-AVNOS
9.P574 NOT AVBL BTN MMV-GIRNA
ALTN: MMV-DCT-AVMOR-DCT-GIRNA
10.L896 N
OT AVBL BTN MMV-DUGOS
ALTN: MMV-DCT-AVMOR-DCT-GIRNA-DCT DUGOS
11.N564 NOT AVBL BTN AKMIL-DUGOS
NO ALTN RTE
12.N563 NOT AVBL BTN AKMIL-XOKRO
ALTN: AKMIL DCT-AVMOR-DCT-GIRNA-DCT-XOKRO
13.T3 NOT AVBL
NO ALTN RTE
DEPARTURES FROM CHENNAI MAY FPL AS FOLLOWS:
W20/Q24 NOT AVBL BTN MMV-KAMGU
ALTN: MMV-DCT-DOHIA-DCT-RAMDO-DCT-KAMGU
ARRIVALS TO CHENNAI MAY FPL AS FOLLOWS:
1)Q23 NOT AVBL BTN RINTO-MMV
ALTN: RINTO-DCT-TTP-DCT-GUANI-DCT-MMV
PART 2 OF 3. 0100-0500, 26 MAR 01:00 2023 UNTIL 15 APR 05:00 2023. CREATED:
10 MAR 11:13 2023

A0644/23 (Issued for VOMF PART 3 OF 3) - 2)V4 NOT AVBL BTN BOPRI-MMV
ALTN: BOPRI-DCT-RINTO-DCT-TTP-DCT-GUANI-DCT-MMV
3)V9 NOT AVBL BTN GUNRI-MMV
ALTN: GUNRI-DCT-GURAS-DCT-KOLCA-DCT-MMV
4)Q11 NOT AVBL BTN GURAS-MMV
ALTN: GURAS-DCT-KOLCA-DCT MMV
5)A465 NOT AVBL BTN GURAS-MMV
ALTN: GURAS-DCT-KOLCA-DCT-MMV
FLW STAR NOT AVBL AT CHENNAI
RUPKU ARR
FLW SIDS NOT AVBL AT CHENNAI
OXENA DEP
DOHIA DEP FOR W20 AND Q24. SFC - UNL PART 3 OF 3, 0100-0500, 26 MAR 01:00 2023
UNTIL 15 APR 05:00 2023. CREATED: 10 MAR 11:13 2023

Screenshot_2023-03-10-18-44-59-98_3d9111e2d3171bf4882369f490c087b4.jpg
 

Swesh

Senior Member
Joined
Jan 12, 2020
Messages
3,520
Likes
12,178

OneWeb to launch 36 satellites with ISRO in final launch to complete constellation & enable global service
*** MEDIA ADVISORY ***
What:
OneWeb, the low Earth orbit (LEO) satellite communications company, will now target its launch of 36 satellites with ISRO for no earlier than 26 March 2023. This launch, taking place from the Satish Dhawan Space Centre in Sriharikota, India, will be OneWeb’s eighteenth launch to-date and its third this year, completing its first generation LEO constellation, and enabling the company to initiate global coverage in 2023.
Why:
This launch will add another 36 satellites to OneWeb’s LEO satellite fleet which forms part of its first generation constellation, delivering wholesale connectivity for its partners. By completing the constellation, OneWeb is taking a pivotal step forward in delivering global coverage.
This mission marks OneWeb’s second satellite deployment from India, highlighting the collaboration between the UK and Indian space industries. From Ladakh to Kanyakumari and Gujarat to Arunachal Pradesh, OneWeb will bring secured solutions not only to enterprises but also to towns, villages, municipalities and schools, including the hardest-to-reach areas across the country.
OneWeb already has connectivity solutions active today in key geographies across the globe and is bringing new areas online by partnering with leading providers including VEON, Orange, Galaxy Broadband, Paratus, Telespazio, and more.
When:
The launch is scheduled to take place no earlier than 26 March 2023 at 11:30pm ET / 3:30pm GMT / 9:00am IST
Where:
The launch will take place from the Satish Dhawan Space Centre in Sriharikota, India and will be conducted by NSIL, the commercial arm of the Indian Space Research Organization (ISRO).
How to watch:
Livestream available on YouTube and social media channels.
 

Swesh

Senior Member
Joined
Jan 12, 2020
Messages
3,520
Likes
12,178

LVM3-M3 / OneWeb India-2 MissionHome


Mar 16, 2023
ISRO has geared up for the launch of LVM3-M3/OneWeb India-2 mission is scheduled soon from the second launch pad at Satish Dhawan Space Centre, Sriharikota, Andhra Pradesh. The mission would be similar to LVM3-M2/OneWeb India-1 mission that took place on October 23, 2022.

This is a dedicated commercial mission through NSIL. It intends to place a total of 36 OneWeb Gen-1 satellites totalling about 5,805 kg into to 450 km circular Low Earth Orbit with an inclination of 87.4°.

This will be the sixth flight of LVM3. The LVM3 launch vehicle is realized with complete indigenized technology and had five consecutive successful missions, including the Chandrayaan-2 mission and OneWeb India-1 mission. It is a three stage vehicle with two S200 solid motors, a L110 liquid stage and a C25 cryogenic stage. This 43.5 m tall vehicle has a lift-off mass of 643 t. The cryo stage is uniquely designed to orient and re-orient in orthogonal direction to meet the customer requirements of injecting satellites precisely and with a gap to avoid collision. The LVM3-M3 is realized in a short span of time on a demand-driven basis to meet the user's timeline.

OneWeb Gen-1 satellites utilize a bent-pipe technology approach to offer communication in Ku-band and Ku-bands. The satellites provide connectivity to enterprises, towns, villages, municipalities and schools, including the hardest-to- reach areas across the length and breadth of India.

1679035663962.png


1679035681843.png


1679035700849.png
 

Swesh

Senior Member
Joined
Jan 12, 2020
Messages
3,520
Likes
12,178

YouTube live link
Another live stream link this one from one web
 

Indx TechStyle

Kitty mod
Mod
Joined
Apr 29, 2015
Messages
18,240
Likes
55,879
Country flag

Latest Replies

Global Defence

New threads

Articles

Top