Source??? The current speed is less than half of it.They plan on making 30 a year. That comes to 100 B2 aircraft until B3 starts production.
Source??? The current speed is less than half of it.They plan on making 30 a year. That comes to 100 B2 aircraft until B3 starts production.
JFT II is already late by 1 year atleastI disagree, as far as I know, the initial plan was to have 50 aircraft of each block. Any number of additional aircraft will be from block III only.
Also, having 100 Blk II doesn't make any sense, because Blk III will be ready around 2016-17, and only about 50 BlkII will have been produced by that time, so if PAF decides to go for 100 Blk II, that would mean that JF17 Blk III will enter production 4 years after it is ready. Why will anyone do that?
source posted in the previous pageSource??? The current speed is less than half of it.
Air Marshal Sohail Gul said the current manufacturing/ assembly capacity was 16 per year, which could be enhanced to 25 or 26, depending on demand
In post#848, you yourself said that JF17 Blk III will come around 2016-17. Tell how will you make 100 planes in 4 years, given that current rate of production is about half of it.JFT II is already late by 1 year atleast
JFT III will have some huge modifications
means further late
100 B2 are confirmed
The source clearly says that production rate can be enhanced on demand, which means on additional orders. So far, there have been no additional orders. At current rate of production, only 50 blk II will be possible.source posted in the previous page
If Pak is not able to maintain its repayment of the cost of JF-17 blk-1, there will be no more JF-17s forget about so called blk-2.The source clearly says that production rate can be enhanced on demand, which means on additional orders. So far, there have been no additional orders. At current rate of production, only 50 blk II will be possible.
this is official time lineIn post#848, you yourself said that JF17 Blk III will come around 2016-17. Tell how will you make 100 planes in 4 years, given that current rate of production is about half of it.
50 ordered in august/october 2012The source clearly says that production rate can be enhanced on demand, which means on additional orders. So far, there have been no additional orders. At current rate of production, only 50 blk II will be possible.
lolIf Pak is not able to maintain its repayment of the cost of JF-17 blk-1, there will be no more JF-17s forget about so called blk-2.
that emergency supply is not confirmed. It was probably just a rumor. Most importantly, Blk II wasn't even ready then. If you doubt me, ask your friends on PDF.this is official time line
might be delayed by 1-2 years.natural delays
50 ordered in august/october 2012
50 ordered on emergency basis in may 2011 soon after the obl raid
50 supplied by CATIC
and 50 by PAC kamra/nawabshah
rumours with PM?prime minister yousuf raza gilani?that emergency supply is not confirmed. It was probably just a rumor. Most importantly, Blk II wasn't even ready then. If you doubt me, ask your friends on PDF.
can you mention the source of the news about difficulty in repayment?
enjoy this machine with unknown engine@<a href="http://defenceforumindia.com/forum/member.php?u=12248" target="_blank">Decklander</a>
with an unknown engine for Pakistan's JF-17 does it even exist?
From what I heard, your PM meant something else and your media misinterpreted it. Thats why I am asking you to check back with your folks. I am not entirely sure about this either. Check back with them and post what they say.rumours with PM?prime minister yousuf raza gilani?
150 JFT by 2015-16 is a very old target.
i heard that it is 6G bird, with Alien tech.enjoy this machine with unknown engine
that was a seperate orderFrom what I heard, your PM meant something else and your media misinterpreted it. Thats why I am asking you to check back with your folks. I am not entirely sure about this either. Check back with them and post what they say.
JF-17 Thunders: Pakistan to get 50 Chinese jets in six months – The Express TribuneBEIJING:
Pakistan hopes to take delivery within the next six months of 50 JF-17 fighter jets manufactured jointly with China, Defence Minister Ahmad Mukhtar said on Friday during a visit to Beijing.
Meanwhile, The Wall Street Journal originally quoted an unnamed high-ranking PAF spokesman, in Beijing with Gilani, as saying the jointly developed JF-17 jets would be in addition to another batch of the same aircraft that is currently being assembled in Pakistan.
Nowhere in your source it is written that it was a separate order.that was a seperate order
completely funded by china
JF-17 Thunders: Pakistan to get 50 Chinese jets in six months – The Express Tribune
meanwhile 50 ordered in august/october as well
yess the production might go late beyond 2015-16
sri lankan member from PDFI Have read this news in Weekly news paper that SLAF is going to buy JF 17s. There is no internet source yet. But I'll update the thread later. BTW SLAF plans to buy 6 JF-17s to obviously replace the older Kafir jets. In the same time SLAF plans to buy 17 Mi-17s and 2 Bell 206 helicopters according to the Defense ministry's planned project progress report for 2013.
Source: http://www.-----------/forums/centr...lanka-air-force-buy-jf-17s.html#ixzz2ETpS5X5U
one ordered in may 2012Nowhere in your source it is written that it was a separate order.
Thread starter | Similar threads | Forum | Replies | Date |
---|---|---|---|---|
Operation Black Thunder | Defence & Strategy | 0 | ||
F | Is Pakistan's JF-17 a Thunder or a Blunder | Opinion & Analysis | 1 | |
16 new JF-17 Thunder jets added to PAF 14-Squadron | Pakistan | 0 | ||
Myanmar Air Force confirms purchase of JF-17 «Thunder» fighter jets | Pakistan | 34 |