ISRO General News and Updates

sorcerer

Senior Member
Joined
Apr 13, 2013
Messages
26,919
Likes
98,471
Country flag
Chandrayaan-3 is likely to be launched during third quarter of 2022-Dr Jitendra Singh


Posted On: 28 JUL 2021 12:05PM by PIB Delhi



Union Minister of State (Independent Charge) Science & Technology; Minister of State (Independent Charge) Earth Sciences; MoS PMO, Personnel, Public Grievances, Pensions, Atomic Energy and Space, Dr Jitendra Singh said that Chandrayaan-3 is likely to be launched during third quarter of 2022 assuming normal work flow henceforth. In a written reply to a question in the Lok sabha today, he said, realization of Chandrayaan-3 is in progress.


The realization of Chandrayaan-3 involves various process including finalization of configuration, subsystems realization, integration, spacecraft level detailed testing and a number of special tests to evaluate the system performance on earth. The realization progress was hampered due to COVID-19 pandemic. However, all works that were possible in work from home mode were taken up even during lockdown periods. Chandrayaan-3 realization resumed after commencement of unlock period and is in matured stage of realization.
 

Vamsi

New Member
Joined
Jun 27, 2020
Messages
4,858
Likes
29,459
Country flag
Chandrayaan-3 is likely to be launched during third quarter of 2022-Dr Jitendra Singh


Posted On: 28 JUL 2021 12:05PM by PIB Delhi



Union Minister of State (Independent Charge) Science & Technology; Minister of State (Independent Charge) Earth Sciences; MoS PMO, Personnel, Public Grievances, Pensions, Atomic Energy and Space, Dr Jitendra Singh said that Chandrayaan-3 is likely to be launched during third quarter of 2022 assuming normal work flow henceforth. In a written reply to a question in the Lok sabha today, he said, realization of Chandrayaan-3 is in progress.


The realization of Chandrayaan-3 involves various process including finalization of configuration, subsystems realization, integration, spacecraft level detailed testing and a number of special tests to evaluate the system performance on earth. The realization progress was hampered due to COVID-19 pandemic. However, all works that were possible in work from home mode were taken up even during lockdown periods. Chandrayaan-3 realization resumed after commencement of unlock period and is in matured stage of realization.
July most probably and Gaganyaan in Sept/Oct
 

ketaki

Regular Member
Joined
Mar 19, 2021
Messages
551
Likes
2,686
Country flag
Chandrayaan-3 is likely to be launched during third quarter of 2022-Dr Jitendra Singh


Posted On: 28 JUL 2021 12:05PM by PIB Delhi



Union Minister of State (Independent Charge) Science & Technology; Minister of State (Independent Charge) Earth Sciences; MoS PMO, Personnel, Public Grievances, Pensions, Atomic Energy and Space, Dr Jitendra Singh said that Chandrayaan-3 is likely to be launched during third quarter of 2022 assuming normal work flow henceforth. In a written reply to a question in the Lok sabha today, he said, realization of Chandrayaan-3 is in progress.


The realization of Chandrayaan-3 involves various process including finalization of configuration, subsystems realization, integration, spacecraft level detailed testing and a number of special tests to evaluate the system performance on earth. The realization progress was hampered due to COVID-19 pandemic. However, all works that were possible in work from home mode were taken up even during lockdown periods. Chandrayaan-3 realization resumed after commencement of unlock period and is in matured stage of realization.
Q3 2022 means Q1 2023...i guarantee it
 

sorcerer

Senior Member
Joined
Apr 13, 2013
Messages
26,919
Likes
98,471
Country flag
Geo-imaging satellite “EOS-03” is scheduled for launch in third quarter of 2021-Dr Jitendra Singh

Geo-imaging satellite will help in near-real time monitoring of natural disasters like floods & cyclones

“EOS-03” would also enable monitoring of water bodies, crops, vegetation condition, forest cover changes etc.


Posted On: 29 JUL 2021 12:18PM by PIB Delhi



Union Minister of State (Independent Charge) Science & Technology; Minister of State (Independent Charge) Earth Sciences; MoS PMO, Personnel, Public Grievances, Pensions, Atomic Energy and Space, Dr Jitendra Singh said thatGeo-imaging satellite“EOS-03”is scheduled for launch in third quarter of 2021 that would enable near-real time monitoring of natural disasters like floods & cyclones. In a written reply to a question in the Rajya Sabha today, he said, ISRO realized EOS-03 is capable of imaging the whole country 4-5 times daily. In addition to natural disasters, EOS-03 would also enable monitoring of water bodies, crops, vegetation condition, forest cover changes etc.


The first developmental flight of Small Satellite Launch Vehicle or SSLV is scheduled in the fourth quarter of 2021 from Satish Dhawan Space Centre, Sriharikota.ISRO’s vast experience in Solid propulsion and heritage of proven design practices has enabled SSLV to be developed as a cost-effective, three stage, all-solid launch vehicle with a payload capability of 500 kg to 500 km planar orbit or 300 kg to Sun Synchronous Polar Orbit. SSLV is ideal for on-demand, quick turn-around launch of small satellites. The major technologies developed as part of realization of SSLV are flexible nozzle control with electro-mechanical actuators for all stages, miniaturized avionics and a velocity trimming module in the upper stage for precise satellite injection.
 

FalconZero

Senior Member
Joined
Jun 20, 2020
Messages
3,782
Likes
19,757
Country flag
Geo-imaging satellite “EOS-03” is scheduled for launch in third quarter of 2021-Dr Jitendra Singh

Geo-imaging satellite will help in near-real time monitoring of natural disasters like floods & cyclones

“EOS-03” would also enable monitoring of water bodies, crops, vegetation condition, forest cover changes etc.


Posted On: 29 JUL 2021 12:18PM by PIB Delhi



Union Minister of State (Independent Charge) Science & Technology; Minister of State (Independent Charge) Earth Sciences; MoS PMO, Personnel, Public Grievances, Pensions, Atomic Energy and Space, Dr Jitendra Singh said thatGeo-imaging satellite“EOS-03”is scheduled for launch in third quarter of 2021 that would enable near-real time monitoring of natural disasters like floods & cyclones. In a written reply to a question in the Rajya Sabha today, he said, ISRO realized EOS-03 is capable of imaging the whole country 4-5 times daily. In addition to natural disasters, EOS-03 would also enable monitoring of water bodies, crops, vegetation condition, forest cover changes etc.


The first developmental flight of Small Satellite Launch Vehicle or SSLV is scheduled in the fourth quarter of 2021 from Satish Dhawan Space Centre, Sriharikota.ISRO’s vast experience in Solid propulsion and heritage of proven design practices has enabled SSLV to be developed as a cost-effective, three stage, all-solid launch vehicle with a payload capability of 500 kg to 500 km planar orbit or 300 kg to Sun Synchronous Polar Orbit. SSLV is ideal for on-demand, quick turn-around launch of small satellites. The major technologies developed as part of realization of SSLV are flexible nozzle control with electro-mechanical actuators for all stages, miniaturized avionics and a velocity trimming module in the upper stage for precise satellite injection.
^ Somewhat good news for GISAT-1 , 3rd quarter means before the end of September.
Last time they said it will be 12 august or something. 🙄 ISRO really needs to start doing soul searching, rocket launch is something they have been doing since forever.
 

Mantospace

Regular Member
Joined
Dec 6, 2020
Messages
374
Likes
671
Country flag
Notam is out fr gisat launch.

A1897/21 (Issued for VOMF PART 1 OF 4) - GSLV-F10 ROCKET LAUNCH FM SHAR RANGE,SRIHARIKOTA WILL TAKE
PLACE AS PER FLW DETAILS.THE LAUNCH WILL BE ON ANY ONE
OF THE DAY DRG THIS PERIOD.ACTUAL DATE OF LAUNCH WILL BE
INTIMATED ATLEAST 24HR IN ADVANCE THRU A SEPARATE NOTAM.
LAUNCH PAD COORD:1343.2N08013.8E
NO FLT IS PERMITTED OVER THE DNG ZONES.
DNG ZONE-1:IS A CIRCLE OF 10NM AROUND THE LAUNCHER.
DNG ZONE-2:IS AN AREA BOUNDED BY FLW COORD:
1.1205N08450E 2.1250N08500E 3.1220N08620E 4.1135N08610E
DNG ZONE-3:IS AN AREA BOUNDED BY FLW COORD:
PART 1 OF 4. 2200-0230, 11 AUG 22:00 2021 UNTIL 11 SEP 02:30 2021. CREATED:
30 JUL 16:51 2021

A1897/21 (Issued for VOMF PART 2 OF 4) - 1.1055N08835E 2.1140N08845E 3.1105N09030E 4.1025N09020E
DNG ZONE-4:IS AN AREA BOUNDED BY FLW COORD:
1.0810N09510E 2.0935N09510E 3.0935N09605E 4.0810N09605E
ALL COORD ARE IN DEG AND MIN
ROUTES AFFECTED IN CHENNAI FIR
N571, P761, N877, P762, Q11, V9, V4, W20, Q23, Q24
CLOSURES/ALTN ROUTING FOR OVERFLYING
1.N571 NOT AVBL BTN IDASO-BIKEN
ALTN:IDASO-DCT-1059N08520E-DCT-BIKEN
2.P761 NOT AVBL BTN IDASO-DUMAR
ALTN:IDASO-DCT-1320N08450E-DUMAR
3.N877 NOT AVBL BTN DUMAR-LAGOG
ALTN:MANPU-DUMAR-LEGIN-LAGOG
4.P762 NOT AVBL BTN XOKRO-PPB
ALTN:ELSAR-DCT-0955N09021E-DCT-PPB
5.Q11 NOT AVBL BTN GURAS-MMV
ALTN:GURAS-A465-MMV
6.W20/Q24 NOT AVBL BTN MMV-KAMGU
ALTN:MMV-RAMDO-KAMGU
DEP FM CHENNAI MAY FPL AS FLW:
W20/Q24 NOT AVBL BTN MMV-KAMGU
PART 2 OF 4. 2200-0230, 11 AUG 22:00 2021 UNTIL 11 SEP 02:30 2021. CREATED:
30 JUL 16:51 2021
 

Latest Replies

Global Defence

New threads

Articles

Top