All our recent missions are commercial mission government is pushing commercialization of vehicles over own launches weird
Getting commercial launches means the vendors making the rockets can get a steady stream of orders without using taxpayer money. Hopefully this will cause Godrej etc to invest in production facilities to make more than the 2 LVM3s per year that they are doing now.
 

Swesh

Senior Member
Joined
Jan 12, 2020
Messages
3,520
Likes
12,179
Already posted in separate thread
 

Swesh

Senior Member
Joined
Jan 12, 2020
Messages
3,520
Likes
12,179
AR2022-23

Review of Crisis Management Plan of Department of Space by Secretary, Security (Cabinet Secretariat), Government of India Review of preparedness of the Department of Space with respect to various crisis scenarios, including cyberattacks, natural disasters, and also with respect to disabling of satellites, was taken up towards giving confidence on the same. Two documents, namely, the Crisis Management Plan of DOS and Contingency Plan with respect to Disabling of Satellites, were reviewed and released to all DOS Centres/ Units for Implementation. The systems and processes in place at DOS for the management of all possible crisis scenarios are found to be in order, and key steps for further enhancement have been identified.
 

Swesh

Senior Member
Joined
Jan 12, 2020
Messages
3,520
Likes
12,179
Integrated Cryo Engine Manufacturing (ICMF) •

ICMF is established for realisation of cryogenic and semi Cryogenic Engines. This will be additional facility for engine realisation. The facility was inaugurated by the Honorable President of India, Smt. Draupadi Murmu on September 27, 2022.
 

Swesh

Senior Member
Joined
Jan 12, 2020
Messages
3,520
Likes
12,179
GANGA facility is meant for the preparation of launch vehicle battery and satellite separation systems. The facility contains automated battery cycling systems, silver zinc electrolyte filling & soaking facilities, battery storage facilities, and assembly and harnessing facilities. The facility was declared open by Chairman, ISRO/Secretary, DOS on August 12, 2022.
 

Swesh

Senior Member
Joined
Jan 12, 2020
Messages
3,520
Likes
12,179
Trisonic Wind Tunnel 114 ´ÉÉ̹ÉEò Ê®{ÉÉä]Ç 2022-2023 Trisonic Wind Tunnel The Trisonic Wind Tunnel is a system to aid the aerodynamic design of rockets and re-entry spacecraft by characterizing scaled models by evaluating forces, moments, load distribution, unsteady pressures, acoustic levels etc. The tunnel can simulate flight conditions from 0.2 times the speed of sound (68 m/s) to 4 times the speed of sound (1360 m/s). The Model Cart system, which supports the model, houses the model incidence mechanism, supports transonic Mach number control, and also has interfaces for data acquisition from the model, is established. The first trial blowdown of the integrated system was carried out on December 08, 2022.
 

TopWatcher

Senior Member
Joined
Feb 19, 2022
Messages
1,676
Likes
4,504
Country flag
As per AR2022-23
In addition, NSIL has in hand three more Dedicated PSLV Launch Service agreements for launching international customer satellites during 2023 and 2024.
Is NSIL engage ISRO team for commercial launches ? How ISRO will concentrate on science.

Cant NSIL create separate team for this.
 

Swesh

Senior Member
Joined
Jan 12, 2020
Messages
3,520
Likes
12,179
Is NSIL engage ISRO team for commercial launches ? How ISRO will concentrate on science.

Cant NSIL create separate team for this.
NSIL is in the process of shifting pslv launch through industry consortium contract has been signed to shift 5 pslv with consortium first launch through consortium aiming in 2024
 

Swesh

Senior Member
Joined
Jan 12, 2020
Messages
3,520
Likes
12,179
End-to-End Launch Vehicle building through Indian Industry *
NSIL has been mandated for the End-to-End building of ISRO’s launch vehicles through the Indian Industry. *
As part of this mandate, NSIL has signed a contract with M/s HAL [Lead Partner of M/s HAL and L&T consortia] for manufacturing five nos of PSLV. The 1st fully Indian Industry manufactured PSLV will be realised by 2024, and subsequent vehicles every six months.
 