- Joined
- Aug 10, 2020
- Messages
- 30,041
- Likes
- 115,410
Ya'll Nibbiars to phir halo kyu?.Nah.
Ya'll Nibbiars to phir halo kyu?.Nah.
Ya'll Nibbiars kya mistake hua?.
Ya'll Nibbiars them why laugh?.
July most probably and Gaganyaan in Sept/OctChandrayaan-3 is likely to be launched during third quarter of 2022-Dr Jitendra Singh
Posted On: 28 JUL 2021 12:05PM by PIB Delhi
Union Minister of State (Independent Charge) Science & Technology; Minister of State (Independent Charge) Earth Sciences; MoS PMO, Personnel, Public Grievances, Pensions, Atomic Energy and Space, Dr Jitendra Singh said that Chandrayaan-3 is likely to be launched during third quarter of 2022 assuming normal work flow henceforth. In a written reply to a question in the Lok sabha today, he said, realization of Chandrayaan-3 is in progress.
The realization of Chandrayaan-3 involves various process including finalization of configuration, subsystems realization, integration, spacecraft level detailed testing and a number of special tests to evaluate the system performance on earth. The realization progress was hampered due to COVID-19 pandemic. However, all works that were possible in work from home mode were taken up even during lockdown periods. Chandrayaan-3 realization resumed after commencement of unlock period and is in matured stage of realization.
Seems a bit overpriced and does not have enough variety. We may have to wait a bit for better designs. RLV-TD T-shirt looks nice though.
Q3 2022 means Q1 2023...i guarantee itChandrayaan-3 is likely to be launched during third quarter of 2022-Dr Jitendra Singh
Posted On: 28 JUL 2021 12:05PM by PIB Delhi
Union Minister of State (Independent Charge) Science & Technology; Minister of State (Independent Charge) Earth Sciences; MoS PMO, Personnel, Public Grievances, Pensions, Atomic Energy and Space, Dr Jitendra Singh said that Chandrayaan-3 is likely to be launched during third quarter of 2022 assuming normal work flow henceforth. In a written reply to a question in the Lok sabha today, he said, realization of Chandrayaan-3 is in progress.
The realization of Chandrayaan-3 involves various process including finalization of configuration, subsystems realization, integration, spacecraft level detailed testing and a number of special tests to evaluate the system performance on earth. The realization progress was hampered due to COVID-19 pandemic. However, all works that were possible in work from home mode were taken up even during lockdown periods. Chandrayaan-3 realization resumed after commencement of unlock period and is in matured stage of realization.
The Lander is ready and will be fully integrated few months before launch. There are high chances that it will happen in July 2022Q3 2022 means Q1 2023...i guarantee it
Means rover still not ready and required testing also. No possible before end of 2022.The Lander is ready and will be fully integrated few months before launch. There are high chances that it will happen in July 2022
Geo-imaging satellite “EOS-03” is scheduled for launch in third quarter of 2021-Dr Jitendra Singh
Geo-imaging satellite will help in near-real time monitoring of natural disasters like floods & cyclones
“EOS-03” would also enable monitoring of water bodies, crops, vegetation condition, forest cover changes etc.
Posted On: 29 JUL 2021 12:18PM by PIB Delhi
Union Minister of State (Independent Charge) Science & Technology; Minister of State (Independent Charge) Earth Sciences; MoS PMO, Personnel, Public Grievances, Pensions, Atomic Energy and Space, Dr Jitendra Singh said thatGeo-imaging satellite“EOS-03”is scheduled for launch in third quarter of 2021 that would enable near-real time monitoring of natural disasters like floods & cyclones. In a written reply to a question in the Rajya Sabha today, he said, ISRO realized EOS-03 is capable of imaging the whole country 4-5 times daily. In addition to natural disasters, EOS-03 would also enable monitoring of water bodies, crops, vegetation condition, forest cover changes etc.
The first developmental flight of Small Satellite Launch Vehicle or SSLV is scheduled in the fourth quarter of 2021 from Satish Dhawan Space Centre, Sriharikota.ISRO’s vast experience in Solid propulsion and heritage of proven design practices has enabled SSLV to be developed as a cost-effective, three stage, all-solid launch vehicle with a payload capability of 500 kg to 500 km planar orbit or 300 kg to Sun Synchronous Polar Orbit. SSLV is ideal for on-demand, quick turn-around launch of small satellites. The major technologies developed as part of realization of SSLV are flexible nozzle control with electro-mechanical actuators for all stages, miniaturized avionics and a velocity trimming module in the upper stage for precise satellite injection.
Last time they said it will be 12 august or something. ISRO really needs to start doing soul searching, rocket launch is something they have been doing since forever.^ Somewhat good news for GISAT-1 , 3rd quarter means before the end of September.
Nibbiar that's a gameYa'll Nibbiars to phir halo kyu?.
Ya'll Nibbiars Video game?.Nibbiar that's a game
YesYa'll Nibbiars Video game?.
Ya'll Nibbiars mena kabhi video games Khale nahi Isle malum nahi.