Only TEDBF can fit in thatTIGHT TIGHT TIGHT...
Only TEDBF can fit in thatTIGHT TIGHT TIGHT...
Only TEDBF can fit in that
One guy in that thread..Considering Vikrant inherited the same tiny elevators, and SEVMASH made Vikramaditya's new forward elevator much larger than this (9.9m wide compared to 8.6m), I'm not sure it's a legacy so much as India just having no experience with designing a carrier.
Bhai kiska fight he?Har koi toight fight likha hai comments me
Elevators tight hai mig 29 k ke liyeBhai kiska fight he?
KIdhar ka thread bhau..Elevators tight hai mig 29 k ke liye
INS Vikramadatya
The VIkramadtiya lifts were correctly places as she was Baku. The redesign meant that what was once a deck edge lift is now more right of centre. Its a terribly half botched redesign that somehow worksINS Vikramadatya
View attachment 168317
INS Vikrant
View attachment 168316
Lift it INS Vikramadatya are oddly placed. We corrected the mistake in INS Vikrant.
By that theory if us fly 6th gen in 2027, then usaf starts fielding 6th gen in 2035, same time of amca mk2, also usaf build & flew 6th gen td.Hold your horses. 6th gen jets are still in conceptual state . They will take decades to proliferate.
F22 first flew in 1997. Now we are 2022. After 25 years other than USA no one has 5th gen plane in decent numbers.
Not that fast. US needs a whole new engine for 6th gen jets. All these unmanned thing can be added to 5th gen jets itself .By that theory if us fly 6th gen in 2027, then usaf starts fielding 6th gen in 2035, same time of amca mk2, also usaf build & flew 6th gen td.
US 5th gen program started during 1985, and first prototype flew in 1990.
6th gen focused on air superiority and dominance against 6th and old gen jets with drone c&c also 4.5 th & 5 th gen also use drone c&c, 6th gen tech. In simple, 6th is like f22/f15/pak fa/su 27/mig 31 etc developed to deploy post 2040 and also able to become killer/hunter killer drone with out human pilot in it.
Who cares ??Not that fast. US needs a whole new engine for 6th gen jets. All these unmanned thing can be added to 5th gen jets itself .
What sets apart 6th gen is ultra long ranges with variable cycle engines. Which being totally new engine will take decade plus to be in operational service. And it will be prohibitively costly to own and operate.
4.5-5th gen jets are costing 250 million including spares weapons and f35 has 35000 USD per hour flying cost.
A 6th gen jet will cost 400 million with spares weapons bases and will cost 50000 USD per hour to fly.
Other than USA no one else can afford that in numbers. Untill economy of scale prevails which will take another decade or two for most of the world.
Coming to chinese they don't even have an engine as advanced as ge 414. Their so called 5th gen jets are basically 3rd gen in engine and barely 4th gen in avionics.
It will take decades before they have a fifth gen engine and another 2 decades before they have a 6th gen engine.
Talks on going for the second Vikrant class carrier. The shipyard is promising to deliver the second Vikrant class carrier in just 7-8 years.Three - yes but of what kind?
That would be bad idea. Take the Vikrant as a baseline, expand it slightly and convert to EMALS catobar. a 50k tonne CATOBAR carrier that can carry 30+ fixed wing fighters.Talks on going for the second Vikrant class carrier. The shipyard is promising to deliver the second Vikrant class carrier in just 7-8 years.
If you need a carrier in next 7-8 years then Vikrant class makes sense.That would be bad idea. Take the Vikrant as a baseline, expand it slightly and convert to EMALS catobar. a 50k tonne CATOBAR carrier that can carry 30+ fixed wing fighters.
They should go far a catobar atleast since even fewer jets can carry more payload from catobar compared to stobar.If you need a carrier in next 7-8 years then Vikrant class makes sense.
If you go for a bigger Carrier with EMALS and other things than it wont be coming before 15 yrs.
Current talks are about getting a new carrier asap which is possible with Vikrant class only.They should go far a catobar atleast since even fewer jets can carry more payload from catobar compared to stobar.
We can see that Carrier air wing costs way more than carrier itself these days. Hence should put money on catobar for optimum solutions even if takes 4-5 more years to deliver .
Thread starter | Similar threads | Forum | Replies | Date |
---|---|---|---|---|
H | Ministry of defence,India: Save our first Aircraft carrier INS Vikrant | Indian Navy | 2 | |
Chinese Media on INS Vikrant | Indian Navy | 7 | ||
RIP INS Vikrant | Indian Navy | 16 | ||
P | Dismantling of iconic warship INS Vikrant begins | Indian Navy | 11 |