The failure correction will involve substantial money and time expenditures. The minimum cost of repair is not less than one billion rubles. The Sevmash officials have already expressed hope for receiving state support. Even in this case the repair of the cruiser will have been finished at best in spring 2013.
Sold to India Aircraft Carrier Breaks Down Even Without Picking Up Speed .::. Russian Tiger
The shipyard does not have that kind of money, some one is going to have to cough it up befor the repairs begin.
Something else that is curious : According Djachkov work Boiler Design Bureau was conducted in the Russian Federation, and the boilers were manufactured at the Baltic Shipyard. "During the trial in the vessel wall boilers are not technically able to develop full speed. They were tested for a maximum capacity of 40%. When first entering the large capacity of up to 100% was observed partial collapse of refractory masonry in boiler furnaces," - he said
http://navaltoday.com/2012/10/16/russia-rejects-indias-claims-for-ins-vikramadiya-delivery-penalty/
Sold to India Aircraft Carrier Breaks Down Even Without Picking Up Speed .::. Russian Tiger
The shipyard does not have that kind of money, some one is going to have to cough it up befor the repairs begin.
Something else that is curious : According Djachkov work Boiler Design Bureau was conducted in the Russian Federation, and the boilers were manufactured at the Baltic Shipyard. "During the trial in the vessel wall boilers are not technically able to develop full speed. They were tested for a maximum capacity of 40%. When first entering the large capacity of up to 100% was observed partial collapse of refractory masonry in boiler furnaces," - he said