Expected to be operational by June 2023, Operational Speed - 160kmphWhy do we still have that name Ghaziabad? It should be renamed. Sorry for off topic, anyways back to topic. When will this be operational and how fast will this train run?
I too want it to be changed, it sounds too cringe.Why do we still have that name Ghaziabad? It should be renamed. Sorry for off topic, anyways back to topic. When will this be operational and how fast will this train run?
All these medical colleges and TN still have shortage on Doctors.Bus Terminus near Vandalur chennai under construction .
Proposed ChennaiEgmore railway station
View attachment 187053
Can someone explain what this is did a new oil field get discovered (Oil and gas production from Samrat Samrat rig in Arabian Sea, will add 6000 bpd
ONGC's Sagar Samrat rig begins oil and gas production in Arabian Sea
It is expected to add 6,000 barrels of crude oil per day to ONGC’s production in the coming days.www.cnbctv18.com
has any analysis come on cost savings on fuel consumed due to newly inaugurated expressways, in recent months?
whole point in spending so much on expressways is saving logistics cost and time. time is being saved, going by plenty of youtube videos, that's for sure. but what are the numbers on cost savings?