Yellow and black markers are ugly as fck, is their no other alternative.Ya'll Nibbiars The Mumbai Metro Line 7, under station work under full pace.
View attachment 184092View attachment 184093
Ya'll Nibbiars The Line 2A under stuon work completed.
View attachment 184094
View attachment 184095View attachment 184096View attachment 184097
View attachment 184098View attachment 184099View attachment 184100
India's Largest Multi-Modal Logistics Park By :- Adani At :- Virochan Nagar, near Sanand, Ahmedabad Investment :- 50,000 Cr + Area :- 1450 Acre Phase-1 :- 300 Acre development by April 2023 → 4.6 km long runway for large-size air cargo → WDFC with double stack containers link
View attachment 184112
View attachment 184113
View attachment 184114
Something Unique can be done with Railways of Bihar. Such high population density opens up a scope for rail transit.
So far Nitishwa has done nothing to make the state attractive for Business. Rajasthan is leaps and bounds ahead in terms of industrialization
Ah I remember Devangere. It hosts a famous college/university. I visited there to see my brother when he was a medical student there back in 1998. Fun times.
When you been to AP last?Roads in Arunachal suck currently, although getting better
On what basis did you made this remark exactly?Arunachalis are most patriotic people in the region even more than Assam
All Economic Corridors should have a dedicated freight lineYa'll Nibbiars The NH130CD, 464 km Raipur Visakhapatnam Economic Corridor, 6 lane. The OD1: Dhanara, Odisha/Chhattisgarh Border to Hatibena, OD NKC Projects. The Connecting central India to eastern ports.
View attachment 183944View attachment 183945View attachment 183946View attachment 183947View attachment 183948View attachment 183949View attachment 183950
Cant come up with something creative. These ugly I heart signs are everywhere now.
This will last all of 2 weeks before hawkers infest the area like rodents and slum dwellers steal the metal poles. Enjoy it while it lasts.Ya'll Nibbiars The Mumbai Metro Line 7, under station work under full pace.
View attachment 184092View attachment 184093
Ya'll Nibbiars The Line 2A under stuon work completed.
View attachment 184094
View attachment 184095View attachment 184096View attachment 184097
View attachment 184098View attachment 184099View attachment 184100
Ya'll Nibbiars its already been a almost whole months and still they are there. And lets check after the five months.This will last all of 2 weeks before hawkers infest the area like rodents and slum dwellers steal the metal poles. Enjoy it while it lasts.