Infrastructure and Energy Sector

NutCracker

Senior Member
Joined
Jun 17, 2022
Messages
4,922
Likes
26,458
Country flag
you can take it as 13 years, 1978 to 1991 difference.
28 years a nuanced argument of mine, which says actual full ground effects started 10-15 years after 1991 reforms.
Pokharan 2 though mandatory.. delayed US/west-India partnership.
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
29,418
Likes
112,980
Country flag
Ya'll Nibbiars And meanwhile in Bihar.

FfNE6tLWQAEoPM6.jpeg
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
29,418
Likes
112,980
Country flag
Ya'll Nibbiars The Mumbai Nagpur expressway. And it's final, the expressway wil open this Diwali, the stage is being set near 1st toll naka on Nagpur side for the opening ceremony.

FfP_1D0agAUhzgs.jpeg
FfP_1KJaEAAqYZI.jpeg
FfP_1QaakAAZBXH.jpeg
FfP_1YfaEAA4nU6.jpeg
 

Arjun Mk1A

Senior Member
Joined
Mar 6, 2022
Messages
2,771
Likes
15,780
Country flag
Ya'll Nibbiars The Mumbai Nagpur expressway. And it's final, the expressway wil open this Diwali, the stage is being set near 1st toll naka on Nagpur side for the opening ceremony.

View attachment 176581View attachment 176582View attachment 176583View attachment 176584

Honestly the next phase should connect Nagpur to Kolkata via Raipur, Raigarh, Rourkela and Kharagpur. It will complete the Mumbai to Kolkata expressway. Even ambitious will be connecting Kolkata to Dhaka via Khulna which results in Mumbai-Dhaka Expressway. But for this last part we need to gauge the mindset of Bilal and his spawns.

1666010619071.png
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
29,418
Likes
112,980
Country flag
Honestly the next phase should connect Nagpur to Kolkata via Raipur, Raigarh, Rourkela and Kharagpur. It will complete the Mumbai to Kolkata expressway. Even ambitious will be connecting Kolkata to Dhaka via Khulna which results in Mumbai-Dhaka Expressway. But for this last part we need to gauge the mindset of Bilal and his spawns.

View attachment 176587
Ya'll Nibbiars The route you made is totally Incorrect. It dosent pass through the Nashik and Aurangabad.

images - 2022-10-17T182523.767.jpeg
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
29,418
Likes
112,980
Country flag
Ya'll Nibbiars even our Village lines are being taken Underground and even the sewers being covered, every pole has a street light, a cricket ground, Malkhambh and kusti akhada with western style mats, a garden constructied in front of the temple, concerte roads with visible markings and road signs even the farms roads made of concerte with the bushes cut after every rainy seasons by the Contractor with water taps in ever household even in the farms, It's other story a 6 crore scam happened in the pipeline. I got shocked when @Suryavanshi said open sewers in large cities. Didn't knew about this in the patna.
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
29,418
Likes
112,980
Country flag
Yes but its gonna be a bitch to keep those things cleaned and free of dust.
Ya'll Nibbiars Having in doors plants is going to make the matinance of the terminal skyrocket, hope it doesn't become white elephant, to many variables here. They still have to plant a lot of greener indoor as seen in the renders. A lot of work is pending will probably will take another 6 months to complete it fully. A delayed project, but living upto the renders almost. Only the CSMIA and the IGIA have been able to maintain properly. The SCBIA has weird odor and RGIA is also clean but not constant.
 
Last edited:

Blademaster

Senior Member
Joined
Aug 19, 2009
Messages
9,217
Likes
26,962
Ya'll Nibbiars Having in doors plants is going to make the matinance of the terminal skyrocket, hope it doesn't become white elephant, to many variables here. They still have to plant a lo5vof greener indoor as seen in the renders. A lot of work is pending will probably will take another 6 months to complete it fully. A delayed project, but living upto the renders almost. Only the CSMIA and the IGIA have been able to maintain properly. The SCBIA has weird odor and RGaiA is also clean but not constant.
I think some of those plants are fake. I think from experience that fake plants are more maintenance heavy because of the collection of dust and mites whereas living plants can pretty much take care of themselves as long as you provide water and sunlight and a way for wastewater to be extracted and recycled.
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
29,418
Likes
112,980
Country flag
I think some of those plants are fake. I think from experience that fake plants are more maintenance heavy because of the collection of dust and mites whereas living plants can pretty much take care of themselves as long as you provide water and sunlight and a way for wastewater to be extracted and recycled.
Ya'll Nibbiars Real plants requires water, means more pipeline all over the airport and more matinaces. Escalation in the capital expenditure and maitnance. And also. Fake ones get tear and ware often so replacing them also means constant matinace and cost escalation.
 
Last edited:

IndianSpiderman

Senior Member
Joined
Jun 25, 2020
Messages
1,684
Likes
10,960
Country flag
Too much nitpicking going on here tbh. KIA is still the best airport in India (at least among the ones I've been to). F&B options are really, and it's highly efficient.
 

Latest Replies

Global Defence

New threads

Articles

Top