Infrastructure and Energy Sector

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
29,416
Likes
112,978
Country flag
Ya'll Nibbiars The Gandipet Eco Park today. Will be a valuable addition to the city’s green landscape of the Hyderabad.

FewyT2HVIAA2UCw.jpeg
FewyT2GUUAAqiQd.jpeg
FewyT2HUYAA1Wx4.jpeg
FewyT2IUAAA4oI3.jpeg

Fe1r7EDVsAA0DOm.jpeg
Fe1r7EGUoAAk0ML.jpeg
Fe1r7EDVIAACqRw.jpeg
Fe1r7EHUAAA_Iml.jpeg
Fe1sMh3UAAE_VXS.jpeg
Fe1sMh4VEAAagn7.jpeg
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
29,416
Likes
112,978
Country flag
Ya'll Nibbiars The Navi Mumbai International Airport. And 1st time large sized zone load tests 5m x 5m in multiple numbers in India. It assess the integrity of such large rockfill of almost 8.00M height for construction of runway.

Fe2DS7PakAAEKRo.jpeg
Fe2DS7OaYAADuUe.jpeg
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
29,416
Likes
112,978
Country flag
Ya'll Nibbiars The Amravati Airport Update. The Bids invited for the construction of Terminal Building, ATC and other works.

Fe2CZdEUYAIgcpJ.jpeg
Fe2CafyUoAIoi0T.jpeg
 

Suryavanshi

Cheeni KLPDhokebaaz
Senior Member
Joined
Jun 5, 2017
Messages
16,330
Likes
70,171
Jalna Dry port Update.
No Progress so far just the land is cleared and central road is built.

1665584888603.png
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
29,416
Likes
112,978
Country flag
Haldibhai any updates on the metro or bullet train?
Ya'll Nibbiars The Mumbai Metro 4A.

FdepQSJakAABm-m.jpeg


FdepTUXaUAU67x_.jpeg


@Haldilal
Can you give the current status how much length is operation in Mumbai already? and how much is in construction and how much will be active by end of this year or by March 2023?
Ya'll Nibbiars
The Line 1 fully, Line 2A partially, Line 7 partially.

The Line 2, Line 2A fully, Line 3, Line 6, Line 7 fully by December.

How much length in KM that would be by this yr end?
Ya'll Nibbiars The 91 Kms.
 
Last edited:

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
29,416
Likes
112,978
Country flag
Ya'll Nibbiars The MSRDC invited bids for appointment of DPR consultants for Pavnar Patradevi Nagpur Goa, The 760 KMs Maharashtra Shaktipeeth Expressways. The longest Expressways in India.
Ya'll Nibbiars The Expressways systems in Maharashtra, Total Length when completed 7,500 KMs.

1 . Mumbai Pune Expressway 100 KMs

2 . Samurddhi Mahamarg 701 Kms.

3 . Jalna Naded Mahamarg 180 Kms.

4 . Samurddhi Mahamarg extension 150 Kms.

5 . Delhi Mumbai Expressway 150 KMs.

6 . Ch. Sambhaji Nagar Pune Mahamarg 225 Kms.

7 . Surat Chennai Expressway 520 KMs.

8 . Hyderabad Indore Expressway 400 KMs.

9 . Shaktipeeth Mahamarg 760 KMs.

10 . Pune Bengaluru Expressway 300 KMs.

11 . Konkan Mahamarg 510 KMs.

12 . Raipur Hyderabad Expressway 100 KMs.

13 . Nagpur Bengaluru Expressway 150 Kms.

14 . Nagpur vijayawada Expressway 180 KMs.

15 . Mumbai Indore Expressway 275 KMs.

16 . Mumbai latur Mahamarg 400 KMs.

17 . Kolhapur Amravati Mahamarg 600 KMs.

18 . Akola Solapur Mahamarg 400 KMs.

19 . Nashik Pune Mahamarg 200 KMs.

20 . Nagpur Dhadgaon Mahamarg 600 KMs.

21 . Kolhapur Dhule Mahamarg 600 kms.
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
29,416
Likes
112,978
Country flag
Ya'll Nibbiars The Churhat bypass tunnel on Rewa-Sidhi section, madhya pradesh,
The total length of the project is 15.35 km; 6 lane Twin tunnel length is 2.95 km.
Opening soon.

Fe8SScFaAAE-0zA.jpeg
Fe8SScMaEAEycto.jpeg
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
29,416
Likes
112,978
Country flag
Ya'll Nibbiars The MSRDC Invite Bids for Pune Nashik Mahamarg for DPR Preparation and L.A .

Another Big Project gets Going forward.

Fe8SIhmVsAA2Iwh.jpeg


Ya'll Nibbiars

Waj se Pehale, Aaj se Jada,

Aaj se Pehale, Aaj se Jada,

Kushi Aaj tak nahi mile,

Itne Suhani, Itne Mithe,

Itne Suhani, Aise Mithe,

Ghaadi Aaj tak nahi mile,

Aaj se Pehale, Aaj se Jada,

Aaj se Pehale, Aaj se Jada,
 
Last edited:

Suryavanshi

Cheeni KLPDhokebaaz
Senior Member
Joined
Jun 5, 2017
Messages
16,330
Likes
70,171
@ezsasa @Haldilal
I have said it once and I will say it again the Urban dev Admin needs careful reform, the old system is too separated and out of sync with each other.

Between Municipal Corporations, CPWD, State PWD, State Housing Boards, NHAI all these departments they are not in sync with each other, each one is doing their own thing and all end up failing more or less.

Gov needs to rethink about administration.

The current admin setup is like a propeller plane when the need of the hour is a Turbojet
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
29,416
Likes
112,978
Country flag
Ya'll Nibbiars The Alibag Multi Model Corridor is stated to have Mumbai Metro Line 15 running across the 100 KMs of stretch of the 126 Kms corridor. And this will be the longest Metro line in India.

images - 2022-10-14T165543.061.jpeg
 

Latest Replies

Global Defence

New threads

Articles

Top