Ya'll Nibbiars The 4 laning of Solapur-Sangli section. The Package IV: Mangalwedha to Solapur. The Package I Sangli To Borgaon. The Dilip Buildcon has completed both sections except Sangli Bypass.
How Is this 100%,I see concrete piers.Ya'll Nibbiars The Indias First OSD, 100 percents Steel, 0 concrete structures at erected at Mumbai Trans Harbour Sealink.
View attachment 163444
Ya'll Nibbiars The pillars not the piers.How Is this 100%,I see concrete piers.
Billa even then it is not all steel structure And those steel pillars which are made of typical cribs seems to be enabling/temporary str for erection of superstr.Ya'll Nibbiars The pillars not the piers.
Took a long time to complete. Looks good now, will have to see how Indian railways maintains it.Sealdah Metro Station
I think thats the only metro system being run by Indian Railways. Should have been completed 10 years back.Took a long time to complete. Looks good now, will have to see how Indian railways maintains it.
Already done a year or two back.Are they going to replace the older non-ac stock of the Older Kolkata line?
No non AC rake is operational anymore; all have been phased out. Initially, the government of Bengal had stakes in the east-west metro (Line 2) which they later gave up on. The line was delayed because Mamata Banerjee led WB government refused to clear encroachments.I think thats the only metro system being run by Indian Railways. Should have been completed 10 years back.
Lets see how it performs.
Are they going to replace the older non-ac stock of the Older Kolkata line?
With this Airport work is in full swing why are they looking for a satellite airport for mumbai one? Is there need for 3 airports in whole Mumbai-navi Mumbai?Ya'll Nibbiars The Navi Mumbai International Airport Construction Work Progress.
View attachment 163752View attachment 163753View attachment 163754View attachment 163755
View attachment 163756View attachment 163757View attachment 163758View attachment 163759View attachment 163760View attachment 163761
He meant the deck is made of steel.How Is this 100%,I see concrete piers.
Columns are usually called as piers in bridges and pillars in buildings.Ya'll Nibbiars The pillars not the piers.
Ya'll Nibbiars The New Third International Airport is coming up in the Kelwa Mahim. And 3,000 acres of land has alreday been notifieds. And with Two parallel 4 km long Runways and capacity of potential 10 crores It's more than a Satellite Airport of Mumbai and Navi Mumbai.With this Airport work is in full swing why are they looking for a satellite airport for mumbai one? Is there need for 3 airports in whole Mumbai-navi Mumbai?
Ya'll Nibbiars To be operationalized by the end of this decade.Is anything known about the project timeline?
Is anything known about the project timeline?Ya'll Nibbiars The New Third International Airport is coming up in the Kelwa Mahim. And 3,000 acres of land has alreday been notifieds.
Ya'll Nibbiars The Location And It's 90 percent Government Owned so no problem in the Land Acquirements.Is anything known about the project timeline?
Never mind , I think it was Orthotropic steel deck he was referring, I don’t have any idea about them may be it is first steel OSD.otherwise there are lot of steel girders.He meant the deck is made of steel.