Infrastructure and Energy Sector

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
29,416
Likes
112,974
Country flag
Ya'll Nibbiars The Mandale depot Mankhurd. The Mumbai's largest depot which wil service the entire 42.2 kms .It wil have a double-decker structure to stable a maximum of 72 trains with staff quarters, 9 inspection bays and 15 workshop lines.

FWGpWNQacAIRTNt.jpeg
FWGpWNQacAAMhKK.jpeg
FWGpWNbakAQCxGQ.jpeg
FWGpWNZakAA4_Oh.jpeg
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
29,416
Likes
112,974
Country flag
JNPT was also looking to construct a greenfield deep sea port, no?
Ya'll Nibbiars The JNPT SEZ phase 1. The Nine firms are currently setting up manufacturing units here. The objective is to boost exports by enabling port-led automation under the Sagarmalas.

FWL3_2eaUAARi6A.jpeg


Was asking about Vadhavan port.
Ya'll Nibbiars The Tender will be issued this Years.
 
Last edited:

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
29,416
Likes
112,974
Country flag
Ya'll Nibbiars The Karaphata interchange,JNPT. And Awesome transformation has happened to these connecting roads from MPE to JNPT. And Just a few years ago these were narrow 4 lane roads with old bridges.

FWL5zyJaMAAuvwn.jpeg
FWL5zyDaUAAelgP.jpeg


The Gavhanphata interchange. The There are stil some arms remaining to be opened but the Junction a lot better now and the 10 lane road towards belapur is serene.

FWL6aLyaIAAeP0U.jpeg

FWL6aOwaAAA3kIn.jpeg
FWL6aSpacAAqS1z.jpeg
FWL6aWuacAE5hXO.jpeg
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
29,416
Likes
112,974
Country flag
Ya'll Nibbiars The Oil India funded Hydrogen bus has started trial runs. The 9 Meter bus is built on a 60kW PEM Fuel Cell engine & will power the electric drive providing range of 450 km . It is intended to be used in Kaziranga Green Tourism by the end of this year.

FXDDJMwaUAEI0rR.jpeg
FXDDJM7aAAADGoI.jpeg
 

SKC

Senior Member
Joined
Aug 16, 2014
Messages
8,656
Likes
29,865
Country flag

tribendra bisoi..

Regular Member
Joined
Jul 6, 2022
Messages
521
Likes
3,072
Country flag
92 MW Floating Solar Power Project commissioned at NTPC Kayamkulam, Kerala. It is now the largest floating solar power plant under operation in the #country. Executed by Tata Power solar

Correction - India's Largest floating solar plant with 100 megawatt capacity is in Telangana . 20 megawatt has been commercialized so far .


 
Last edited:

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
29,416
Likes
112,974
Country flag
Ya'll Nibbiars Teh 4 laning of Pandoh Takoli section,Himachal Pradesh. The Drone wil give beautiful views of these vaiducts when completed.The below road wil be one way and the other side traffic wil use these elevated sections.

FWQRzCbaQAMxxq7.jpeg
FWQRzCPagAE-Nl3.jpeg
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
29,416
Likes
112,974
Country flag
Ya'll Nibbiars Tue Dhubri Phulbari bridge. The India's longest river bridge19 kms,12.6 kms over water over Brahmaputra river linking Assam to Meghalaya reducing distance between 2 points by 250 kms. The L&T started construction in The February 2021.

FWHI8uYaAAImLxr.jpeg
FWHI8uYaUAEd_V0.jpeg
FWHI8uhaQAA7UF6.jpeg

FWHI8umaAAAFtZ2.jpeg
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
29,416
Likes
112,974
Country flag
Ya'll Nibbiars The Kazhakootam elevated highway. The Kerala's longest four-lane elevated highway 2.72 kms. All the girders are placed.laying of asphalt and approach ramps remains.

FWAy39DacAAAczP.jpeg
FWAy39EaIAA7kgg.jpeg
FWAy39CaAAA1h8Q.jpeg
FWAy39FaQAAPiRL.jpeg
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
29,416
Likes
112,974
Country flag
Ya'll Nibbiars The Teesta Stage-VI 500 Mw is a Run of River Hydropower in Sirwani Village of Sikkim to utilize the power potential of Teesta River Basin. And After Lanco went bankrupt,NHPC tookover and plan to complete by 2024.Various works underway.

FVcs1Y8aIAAhbxS.jpeg
FVcs1Y_aIAA_5FB.jpeg
FVcs1Y8agAAhfNw.jpeg
FVcs1Y_aIAA_5FB (1).jpeg
 