-15 years back itself Mumbai had double the floating day time population than it’s residents.
-thankfully Mumbaikars are resourceful, they always manage a way to keep the city running, but the country cannot afford to puts all it’s financial eggs in one basket
-with the cost of construction + land acquisition, can build an entire mini city for the same cost it takes build one sky scraper in Mumbai
-there are enough satellite cities around Mumbai that can developed. Panvel airport and Navi Mumbai are one such plans
This is again, horizontal growth. As more and more people move to the cities, Mumbai will continue to grow. Its not like anybody can put a pause on it. Our country is a very crowded one and the population is expected to grow until 2050. Horizontal growth will obviously take up more precious land. Vertical growth is the best option for mumbai.
 

Okabe Rintarou

Senior Member
Joined
Apr 23, 2018
Messages
2,337
Likes
11,986
Country flag
This is again, horizontal growth. As more and more people move to the cities, Mumbai will continue to grow. Its not like anybody can put a pause on it. Our country is a very crowded one and the population is expected to grow until 2050. Horizontal growth will obviously take up more precious land. Vertical growth is the best option for mumbai.
Build heights are proportional to urban density. In order to allow more people per sq km. in a city, you need to have road and rail transport infrastructure that support the required logistics and transport needs of more people per sq. km. In addition, you need more services such as more Hospitals and Schools. So if you want ubqiquitous Supertalls in Mumbai, you need to address the infrastructure limitations first.
 

ezsasa

Designated Cynic
Mod
Joined
Jul 12, 2014
Messages
31,715
Likes
146,977
Country flag
This is again, horizontal growth. As more and more people move to the cities, Mumbai will continue to grow. Its not like anybody can put a pause on it. Our country is a very crowded one and the population is expected to grow until 2050. Horizontal growth will obviously take up more precious land. Vertical growth is the best option for mumbai.
from a Mumbai perspective, sure. Let it grow as per its capacity and requirement. No problem.

but from India’s economic security perspective, there should be and will be attempts to diversify urban infrastructure development funding, which is already happening anyways as evidenced by new metro construction projects around the country.
 

Chinmoy

Senior Member
Joined
Aug 12, 2015
Messages
8,678
Likes
22,535
Country flag
World one is 260, Omkar says 300, not sure. Diamond says 400 but is there any news about it!? Its doubtful that its going to be built.
My Bad. Yeah World One is 280 meter. 442 meter was the proposed height which got objected by AAI as pointed out nicely by @Okabe Rintarou.
Others are under various stages of construction.
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
29,416
Likes
112,974
Country flag
Ya'll Nibbiars Maharashtra Rail Infrastructure Development Corporation MRIDC Invited bids for construction of cable-stayed road overbridge ROB near Byculla railway station in Mumbai Est. cost: Rs. 169.44 cr Completion: 1 year.

Ec9Qd3jUwAAk9mT.jpeg
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
29,416
Likes
112,974
Country flag
Ya'll Nibbiars The Mumbai Nagpur expressway Pkg 7-Buldhana-Reliance Infra Perhaps the 1st time we are seeing updates from this section. Looks like around 80% work is done .Thats shindlhed interchange looks different.

FBfHZlpVgAIvd4m.jpeg
FBfHZlpVgAIvd4m.jpeg
FBfHZlqUcAIhpgC.jpeg
FBfHZlxVEAMS4qM.jpeg
 

doreamon

Senior Member
Joined
Mar 24, 2019
Messages
3,007
Likes
15,162
Country flag
This is pathetic from mumbai .. Its not door blocking . The train is packed . People ll die if more allowed in . Metro project shd be expanded on war footing .

 
  • Like
Reactions: SKC

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
29,416
Likes
112,974
Country flag
This is pathetic from mumbai .. Its not door blocking . The train is packed . People ll die if more allowed in . Metro project shd be expanded on war footing .

Ya'll Nibbiars New Regulation to be implemented if all doors on the AC locals are not closed then it will not run.
 

LaIllahaSigmar

Senior Member
Joined
Jun 20, 2021
Messages
1,291
Likes
8,978
Country flag
This is pathetic from mumbai .. Its not door blocking . The train is packed . People ll die if more allowed in . Metro project shd be expanded on war footing .


How much of this stress will Mumbai metro alleviate?

And by how much have the aarey lunatics delayed the metro project?
 
Last edited:

doreamon

Senior Member
Joined
Mar 24, 2019
Messages
3,007
Likes
15,162
Country flag
How much of this stress will Mumbai metro alleviate?

And how much have the aarey lunatics delayed the metro project?
This is 2019 modi's statement which says it ll carry as much passangers as are in mumbai local train


As far as delays are concerned recently Japan had alerted .. there has been delay and cost over run ..

 

LaIllahaSigmar

Senior Member
Joined
Jun 20, 2021
Messages
1,291
Likes
8,978
Country flag
This is 2019 modi's statement which says it ll carry as much passangers as are in mumbai local train


As far as delays are concerned recently Japan had alerted .. there has been delay and cost over run ..

This is a good video I found on the timeline of Mumbai metro.

Hopefully after 2024-2026, these images of overcrowded local trains will become a thing of past.

 

ezsasa

Designated Cynic
Mod
Joined
Jul 12, 2014
Messages
31,715
Likes
146,977
Country flag
This is a good video I found on the timeline of Mumbai metro.

Hopefully after 2024-2026, these images of overcrowded local trains will become a thing of past.

5 star hotel coming up in Amritsar

No matter how many trains are added, peak time rush at some stations is going to be the same.
 

fooLIam

Regular Member
Joined
Jan 25, 2016
Messages
749
Likes
2,458
Ya'll Nibbiars this project is going on the slow pace and aready delayed by many years. Sad to see that USBRL is going so slow. It either time to change the contractor or review the projects.
How you came to conclusion that slow progress of USBRL Project is due to contractor and not because of institutional inefficiencies.
Reviewing the project now will only delay the project more.
It's just that theirs no accountability for Babu's. They come ,warm their chair for 2 year. Ministries does not ask them how much progress they made , does not sack them And by the way their promotion are time bound as long as they not taken some panga with seniors.
Now theirs is this kida of L1 and not taking account of complete picture.
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
29,416
Likes
112,974
Country flag
How you came to conclusion that slow progress of USBRL Project is due to contractor and not because of institutional inefficiencies.
Reviewing the project now will only delay the project more.
It's just that theirs no accountability for Babu's. They come ,warm their chair for 2 year. Ministries does not ask them how much progress they made , does not sack them And by the way their promotion are time bound as long as they not taken some panga with seniors.
Now theirs is this kida of L1 and not taking account of complete picture.
Ya'll Nibbiars because USBRL has come under fire or similar delays and their method have also been questioned before. That's why.
 