Infrastructure and Energy Sector

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
29,416
Likes
112,978
Country flag
Ya'll Nibbiars Under construction Ramayampet Canal, part of the ambitious Kaleshwaram Lift Irrigation project in Telangana. Contractor: Power Mech Projects. @ezsasa Nibba, @Rxbanda Nibba.

FBAk7DFVEAglr26.jpeg
FBAk7DJVQAAJrN_.jpeg
FBAk7DHVcAAW02s.jpeg
FBAk7DJVQAE9e6_.jpeg
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
29,416
Likes
112,978
Country flag
Ya'll Nibbiars Newly laid tarmac on NPD in btw Purney and Padum in Zanskar, Ladakh. 290km NPD is the alternative axis being developed by BRO for Leh Manali connectivity, approx 100km is black topped and 12-15 70Class bridges spotted. 30-40km of the Alignment between Zangla and Chilling pending. @FalconSlayers Nibba.

FA8YIuLXsAcjl-1.jpeg
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
29,416
Likes
112,978
Country flag
Ya'll Nibbiars Mumbai Metro On the Go!! Early this morning, MMRDA finally installed the last I-Girder for Mumbai Metro Line 2A at Adarsh Nagar. With this feat, MMRDA can now install tracks and OHE all the way between Dahanukarwadi and Andheri.

FA_Na5QVkBgCcM3.jpeg
FA_NbXKVQAcariH.jpeg
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
29,416
Likes
112,978
Country flag
Ya'll Nibbiars Pune Metro Rail cars arrives at the JNPT.

FBA4QI8UYAAT8CX.jpeg
 

doreamon

Senior Member
Joined
Mar 24, 2019
Messages
3,007
Likes
15,162
Country flag
Ya'll Nibbiars Under construction Ramayampet Canal, part of the ambitious Kaleshwaram Lift Irrigation project in Telangana. Contractor: Power Mech Projects. @ezsasa Nibba, @Rxbanda Nibba.

View attachment 113443View attachment 113444View attachment 113445View attachment 113446
These canals shd be covered with solar panels like gujurat . No land acquisition problem , cooling effect on panels , reducing evaporation and water availability to clean panels at the source .
Kaleswaram project ll consume 7 gigawat of electricity to lift water to upward slope . Shd be recovered as much as possible in course of time .
 

LaIllahaSigmar

Senior Member
Joined
Jun 20, 2021
Messages
1,291
Likes
8,978
Country flag
Who is designing these low income appts?

Video is of a sample for BFD Chawl redevelopment.

At 2:09 you can see the washrooms with a western toilet in a primarily squatting country.


 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
29,416
Likes
112,978
Country flag
Ya'll Nibbiars

1 . WadgaonSheri Phata. Remaining piers are being constructed.

2 . Steel girder at WadgaonSheri Phata cho.

3 . Ramwadi station.

4 . LG approaching Ramwadi naka, it will later assemble the curve to move towards Kalyaninagar.

FBCSGmCUcAETnTp.jpeg
FBCSGmCVQAcOu2i.jpeg
FBCSGmMVUAc7vv-.jpeg
FBCSGmqVUAgt1iU.jpeg
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
29,416
Likes
112,978
Country flag
Ya'll Nibbiars Some Updates Related To Patna Metro. And In Second picture piling machine can be seen and in third picture 1st Structure to be constructed.

E1z-fAYUcAQ38T-.jpeg
E1z-fQqVgAEIkcq.jpeg
E1z-fbkUcAQgCkm.jpeg
E1z-gJeVoAMhVzY.jpeg
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
29,416
Likes
112,978
Country flag
Ya'll Nibbiars Mumbai Nagpur expressway Package 14-Igatpuri Afcons Afcons start pqc laying of 16.71 kms of twin tunnels.Tunneling was completed in 24 months.

FBLXGULVQAc4orb.jpeg
 

Okabe Rintarou

Senior Member
Joined
Apr 23, 2018
Messages
2,337
Likes
11,986
Country flag
This guy is vlogging in a new office building he says will be demolished for the Central Vista project. The building is so new, it looks like a part of the Central Vista project.
 

ezsasa

Designated Cynic
Mod
Joined
Jul 12, 2014
Messages
31,719
Likes
146,998
Country flag
This guy is vlogging in a new office building he says will be demolished for the Central Vista project. The building is so new, it looks like a part of the Central Vista project.
apparently the building is called ministry of external affairs jawaharlal nehru bhawan opened in 2018.
by the time central vista construction comes to this plot, it will take another 5-6 years.
 

devx101

Regular Member
Joined
Mar 28, 2011
Messages
96
Likes
341
Country flag
Ya'll Nibbiars World Trade Center , Nauroji Nagar, Delhi by NBCC. And but most of the offices spaces are already sold out to PSU/Govt offices. Hardly any remains for the private sectors.

View attachment 112950View attachment 112951View attachment 112952View attachment 112953
This is a Model development project i think. This template will be used for all dilapidated office and residential buildings in Delhi area. Hope they launch 5 such projects in one go in next batch.

Delhi needs a little bit of HighRise culture. Not much Ofcourse bcoz of security reasons but still 20-25 floors should be allowed. It should start a Mumbai style redevelopment model for Basti /Slum areas.
 

devx101

Regular Member
Joined
Mar 28, 2011
Messages
96
Likes
341
Country flag

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
29,416
Likes
112,978
Country flag
Why this bridge has soo many piers?!! Should have done cable stayed bridge at least in some sections. Will not so many piers block water navigation!
They are charging thousands of crores for this bridge, still such a simple design??!!
Ya'll Nibbiars has two cable bridges sections. And it's not a simple design. You are forgetting it's length. And also the land and drigging is challenging due to the soil. And Rock base. And it's a sea bridge not a land bridge.
 
Last edited:

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
29,416
Likes
112,978
Country flag
Ya'll Nibbiars Pakal Dul hydroelectric power project -1GW-J&K. IT comprises a 167m-high concrete-face rockfill dam ,4 49m-high underground powerhouse each generating 250mw.Work started in 2018.Afcons, JP associates, L&T are contractors.Completion period-2025.

FBTmXbrUcAIO0kB.jpeg

FBTmXbrUYAgxDZ8.jpeg
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
29,416
Likes
112,978
Country flag
Ya'll Nibbiars NHAI floats tender for 4 laning of Ratnagiri to Kolhapur NH 166 in the state of Maharashtra Entire Ratnagiri to Nagpur NH 166 will be 4 lane in next 3 years. Niwali Ratnagiri JSW Jaigad Port Highway also needs to be 4 lane. This will offer great port connectivity between Konkan and Vidarbha.
 
Last edited:

Latest Replies

Global Defence

New threads

Articles

Top