These are the current planned corridors for high speed rail in India.

The plan goes all the way to 2051.
South will get a line only in 2041.

It says we will build only 2 corridors in 2031 to 2041.

Is this too long/ cautious?

Or is this only a preliminary estimate subject to change with the speed at which Mumbai Ahmedabad corridor is completed?
There are multiple reasons for this slow start.

One is viability

This is a completely new project. How this project will deliver, how people will respond to it and what challanges needs to overcome in context of India is yet to be seen.

Second is indigenization.

Lot of equipment for bullet train is still being imported from foreign countries. The goal of gov is not only to build high speed rail corridors but also to absorb this technology and slowly become Atmanirbhar in high speed rail.

Another reason is money.

Bullet train lines are very expensive to build and maintain to build rapidly we will need to pour lot of money into this project which is difficult, because we are also overhauling traditional railway tracks, upgrading british era stations, building dedicated freight corridors, electrifying lines, modernising coaches, building semi-high speed trains, connecting north east, kashmir rail link, chardham rail, etc.

There is so much investment that is needed in traditional railway infrastructure that building high speed rail within a short timeframe is difficult.
 

LaIllahaSigmar

Senior Member
Joined
Jun 20, 2021
Messages
1,291
Likes
8,978
Country flag
DFC is adding to your economy, whereas speed corridor would impact you adversely if not planned well.

https://www.sentinelassam.com/editorial/move-to-cancel-train-494867

Read this news item to get a picture of why we need to plan high speed corridor in a logical manner.

We are supposed to build a corridor to Varanasi saying its for tourism.

I do understand that it's an element of eastern industrial corridor, but building a corridor connecting already present industrial and economic hubs like southern capitals should get priority.
 

Chinmoy

Senior Member
Joined
Aug 12, 2015
Messages
8,678
Likes
22,551
Country flag
We are supposed to build a corridor to Varanasi saying its for tourism.

I do understand that it's an element of eastern industrial corridor, but building a corridor connecting already present industrial and economic hubs like southern capitals should get priority.
Here you are talking about semi high speed trains and the map you shared is for high speed corridor.

IR is already working on incrementing the whole network to semi high speed trains.

https://economictimes.indiatimes.co...airman-railway-board/articleshow/71707267.cms
 

Suryavanshi

Cheeni KLPDhokebaaz
Senior Member
Joined
Jun 5, 2017
Messages
16,330
Likes
70,171
More than skyline what matters is what's inside and below the ground.

Storm drainage, serwer system, underground cable as well as configuration access point are a must have for such cities.

After that comes the planning and infra part.

Historical sites must be prerved and renovated, open spaces and water bodies must be preserved unless no other option is there.

Primary road's must be made with future traffic in mind accompanied by traffic signalling, footpaths, pedestrian crossing/Underpass, Overpass, parking etc.
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
29,421
Likes
112,983
Country flag
Ya'll Nibbiars Jewar airport terminal smaller than expected 60 million plus annual capacity. The design is sadly ugliest. The Zurich constraints has rejected the Yogis plea to increase the airport capacity due to the financial sound and will not includes the indic elements in the design as asked by the CM. Two runways initial. If required additional runways are provisioned.

Well the Zurich based constratium didn't gone with the Yogis plans. Apparently it looks like that.

FAoNeEvVkAABlq0.jpeg
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
29,421
Likes
112,983
Country flag
The Opening up new way for Northeast bound Superfast Express Trains the under construction tunnel in Bihar. After 50 years of approved, planning, Implementation and under construction finally.

FATm65BUcAUzgaY.jpeg
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
29,421
Likes
112,983
Country flag
Ya'll Nibbiars A new navigation lock is U/C at West Bengal's Farakka under the Jal Marg Vikas Project. Since the old lock gate is aging and inefficient, the new lock gate will ensure smooth connectivity on National Waterway 1, and will also include a "fish pass" to preserve biodiversity.