upcoming green field express ways


www.financialexpress.com

Massive infra boost! Check these 22 upcoming Greenfield projects under Bharatmala Pariyojana Phase 1
Under Pariyojana's Phase – I, the government plans to develop as many as 22 Greenfield Expressways as well as Access Controlled Corridors.
www.financialexpress.com
www.financialexpress.com

1) a- Delhi-Vadodara Expressway: This corridor is 845 kilometres long, which is being developed at a cost of Rs 42,165 crore.
1) b- Vadodara-Mumbai Expressway: This is 446 kilometres long corridor, being built at a cost of Rs 45,835 crore in total.
1) c- Delhi-Faridabad-Sohna: This is a 60 kilometres spur to the Delhi-Mumbai highway Stretch, which has been already awarded and is to be developed at Rs 5,333 crore cost.
2) Ahmedabad-Dholera Expressway: This is 109 kilometres long and has already been awarded. The project is being constructed at a total cost of Rs 4,192 crore.
3) Delhi-Amritsar-Katra Expressway: The 672 kilometres long highway is being constructed at a cost of Rs 37,775 crore.
4) Bengaluru-Chennai Expressway: This 262 kilometres long Expressway will be developed at a cost of Rs 15,176 crore.
5) Kanpur-Lucknow Expressway: The 63 kilometres long Expressway will be constructed at Rs 4,183 crore cost.
6) Ambala-Kotputli Corridor: The 313 kilometres long Ambala – Kotputli corridor is awarded at Rs 11,375 crore cost.
7) Chennai-Salem Corridor: This 277 kilometre long flagship, access-controlled corridor from Chennai to Salem, will be developed at a cost of Rs 9,681 crore.
8) Amritsar-Bhatinda-Jamnagar Corridor: The 917 kilometre long section of the 1,224 kilometre long Amritsar-Bhatinda Jamnagar corridor will be developed at a cost of Rs 22,543 crore.
9) Durg-Raipur-Arang Corridor: This 92 kilometre long corridor will be developed at a cost of Rs 2,689 crore.
10) Raipur-Vishakhapatnam Corridor: The 465 kilometres long corridor will be developed at a cost of Rs 14,695 crore.
11) Chitoor-Thatchur Corridor: This 116 kilometres long corridor is to be constructed at a total capital cost of Rs 3,997 crore.
12) Urban Extension Road II: The 75 kilometres long UER II is planned to be developed at a cost of Rs 7,495 crore.
13) Delhi-Dehradun Corridor: The project is to be developed as part of the 210 kilometre long corridor, with 169 kilometres of Greenfield section, the corridor is being constructed at Rs 10,294 crore.
14) Bengaluru-Satellite Ring Road: This 281 km road is to be constructed at a cost of Rs 14,337 crore.
15) Surat-Ahmednagar Solapur: The 641 kilometre long corridor is constructed at a total cost of Rs 28,212 crore.
16) Solapur-Kurnool Corridor: This 335 kilometre long corridor is likely to be built at a total capital cost of Rs 12,859 crore.
17) Kharagpur-Siliguri (Till Morgram): This 235 kilometres long corridor is expected to be constructed at a cost of Rs 5,671 crore.
18) Indore-Hyderabad Corridor: The 687 kilometres long corridor is expected to be constructed at Rs 15,014 crore cost.
19) Hyderabad (Suryapet)-Vishakhapatnam (Devarpalle) Corridor: The 222 kilometres corridor is likely to be developed at a cost of Rs 5,583 crore.
20) Kota–Indore (Garoth – Ujjain): This 135 kilometres long corridor is expected to be developed at cost of Rs 1,887 crore.
21) Hyderabad-Raipur Corridor: This 330 kilometres long corridor is expected to be constructed at a cost of Rs 8,737 crore.
22) Nagpur-Vijayawada Corridor: This is 405 km long access-controlled stretch, which is planned to be developed at an overall capital cost of Rs 14,666 crore.
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
15,096
Likes
49,665
Country flag
Ya'll Nibbiars The Mumbai Pune expressway new link project. Tje 1st tunnel breakthrough achiebed. And this one is achieved from Pune side to mid shaft. The 8.9 kms 8 lane twin tunnels,one of the widest and longest tunnels in the world. The widest tunnel in India. Each carriageway is 24 M wide. Total RoW is 50 M.

FCrAfdHVkAUvKk8.jpeg
FCrAfdJVIAc2cVb.jpeg


Dahil Inftas.
 
Last edited:

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
15,096
Likes
49,665
Country flag
Ya'll Nibbiars Sometime Good leadership and will to work against odds actually delivers a good Product. Here is one such example of Sammudri Maha Marh Project come so fast and truly one of best expressway have in state. All due to the Fadnavis.

FCpiVRyWEAgiFPZ.jpeg
FCpidS9XIAIIjDQ.jpeg
FCpikQ-XIAI78xf.jpeg
FCpi6lcXEAA7S4E.jpeg


The CB Dhage.
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
15,096
Likes
49,665
Country flag
Ya'll Nibbiars any updates on the

1 . Bangaluru PRR.

2 . Bangaluru Suburban rail.

3 . Kalyana Patha.

4 . Shiradi Ghat tunnel road.

Are they still stuck or going smoothly?.
 
  • Like
Reactions: SKC

UnderFingy

Regular Member
Joined
May 6, 2021
Messages
780
Likes
4,909
Country flag
@Haldilal
Boi, know anything about this?


A communique from the MP’s office here said that Mr. Kateel urged the authority to complete the bidding process for the Mulki-Kinnigoli-Moorkaveri-Kateel-Polali-B.C. Road-Melkar-Thokkottu four-lane work under the Bharat Mala project at the earliest. Mr. Pandey responded positively to this demand.
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
15,096
Likes
49,665
Country flag
Ya'll Nibbiars Kolhapur International Airport the expansion now can take speed. AAI is developing this Airport. Here are some details.

1 . Runway 3.2 kms.

2 . Capable of handling multiple mid size and large size aircraft at a single time.

3 . Night landing facilities.

4 . Fuel Refilling facilities and storage facilities.

5 . Engeering and matinance facilities.

6 . Multiple storage hangers.

7 . Isolation Bay.



images (72).jpeg

ELrCHtgXUAExjdN.jpeg

images - 2021-10-30T140324.045.jpeg
images - 2021-10-30T140339.461.jpeg
 
Last edited:

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
15,096
Likes
49,665
Country flag
Ya'll Nibbiars Palkhi Theme foot over bridge at Sant Tukaram Nagar Metro Station, pune.

FC83-j6VgAUSCF1.jpeg
FC83-vRVkAIgXjh.jpeg
FC83-5ZVkAIRhP4.jpeg
FC83_FSVkAYRoC0.jpeg
 

Bhumihar

Cheeni KLPDhokebaaz
Senior Member
Joined
Jun 5, 2017
Messages
10,142
Likes
40,435
Country flag
Ya'll Nibbiars Kolhapur International Airport the expansion now can take speed. AAI is developing this Airport. Here are some details.

1 . Runway 3.2 kms.

2 . Capable of handling multiple mid size and large size aircraft at a single time.

3 . Night landing facilities.

4 . Fuel Refilling facilities and storage facilities.

5 . Engeering and matinance facilities.

6 . Multiple storage hangers.

7 . Isolation Bay.



View attachment 116624
View attachment 116625
View attachment 116627View attachment 116628
Most of them using Indian architecture nice
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
15,096
Likes
49,665
Country flag
Ya'll Nibbiars Naka Freeway. Construction started from Mulund creek bridge. LG can be seen and also the Elevated bridge leading to tunnel.

FC-DHkOX0AkErWm.jpeg
FC-DVmZWYAYfzJn.jpeg
FC-DjgxXIAIX05w.jpeg
FC-EIWlWQAcArKg.jpeg
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
15,096
Likes
49,665
Country flag
Ya'll Nibbiars

The WDFC updates from Virar-Dahanu. And All Photographs near the Vangaons :

1 . Stabilising marshy land near Vaitar.

2 . Track bed ready for laying ballast. OHE foundations also done in many stretch.

3 . OHE poles up between Kele & Palghar.

4 . Substation near Boisar.

5 . Some equipment in boxes & track segment for turnouts.

6 . Sleepers laid in short stretch near Vangaon.

7 . Storage of sleepers in background & precast segments for drains in foreground.

8 . Tracks have arrived, waiting to be laid.

FC_jLVRWYAEN8nN.jpeg
FC_jLV6WYAMfGnL.jpeg
FC_jLWkXEAIAknO.jpeg
FC_jLXTXMAc_lXC.jpeg

FC_iSIrXsAcAPlc.jpeg
FC_iSKWXoAI72_j.jpeg
FC_iSM7XEAMQsMO.jpeg
FC_iSPMWEAMKlwp.jpeg


A Marathe.
 
Last edited:

Global Defence

Articles

Top