apparently the building is called ministry of external affairs jawaharlal nehru bhawan opened in 2018.This guy is vlogging in a new office building he says will be demolished for the Central Vista project. The building is so new, it looks like a part of the Central Vista project.
This is a Model development project i think. This template will be used for all dilapidated office and residential buildings in Delhi area. Hope they launch 5 such projects in one go in next batch.Ya'll Nibbiars World Trade Center , Nauroji Nagar, Delhi by NBCC. And but most of the offices spaces are already sold out to PSU/Govt offices. Hardly any remains for the private sectors.
View attachment 112950View attachment 112951View attachment 112952View attachment 112953
Why this bridge has soo many piers?!! Should have done cable stayed bridge at least in some sections. Will not so many piers block water navigation!Ya'll Nibbiars The Mumbai trans harbour link Package 1 sewri end L&T.
View attachment 112012
View attachment 112015View attachment 112013View attachment 112014
Ya'll Nibbiars has two cable bridges sections. And it's not a simple design. You are forgetting it's length. And also the land and drigging is challenging due to the soil. And Rock base. And it's a sea bridge not a land bridge.Why this bridge has soo many piers?!! Should have done cable stayed bridge at least in some sections. Will not so many piers block water navigation!
They are charging thousands of crores for this bridge, still such a simple design??!!
Don't know about that but here is a Good articleDo anyone know what percent of our coal fired thermal plants are ultra supercritical. And can syngas be used for ultra supercritical thermal plants
Appreciate your response, i have to look up coal to liquid tech now. I agree we are not using our domestic coal to its full potential. Maybe current crisis is an opportunity in disguise like the pandemic was.Don't know about that but here is a Good article
![]()
India can save almost Rs 9,000 cr a year by shutting old thermal power plants, study says
According to New Delhi-based CEEW, closing down old plants, which consume more coal than new ones, can help reduce greenhouse-gas emissions, clean up air and reduce soil & water pollution.theprint.in
Also i think time has come to block Imported coal fully. Convince coal producing states to reduce royalty substantially so that Imported coal becomes redundant.
One Thing which i want Govt. to pursue is CTL (Coal to liquid tech). India has enough coal to fully substitute crude oil imports. Yes it is CO2 intensive but we can handle that later. Crude Oil demand will reduce only after 2030 (God Knows) , and requirement of Petrochemicals will remain for foreseeable future. CTL plants with 20 to 25 life can do wonders to reduce dependence on Middle East Sheiks.
Ya'll Nibbiars this project is going on the slow pace and aready delayed by many years. Sad to see that USBRL is going so slow. It either time to change the contractor or review the projects.Important project progressing well. Deadline is 2024
RISHIKESH - KARANPRAYAG RAILWAY Line. Unlike USBRL,this one is being constructed at brisk pace and without much brouhaha.Its tough keeping up with this project Pkg2 (18 to 33kms- L&T): Tunnel No 02 (6460m).
![]()
![]()
![]()
![]()
Rishikesh-Karnaprayag rail line Package-4 (47 to 63kms) -L&T. The star pkg of the line as it involves the longest rail tunnel in India(14.5 kms) near Devprayag.Out of 14.5 kms,10.4 kms wil b bored using TBM and rest by http://NATM.Pics of NATM work
![]()
![]()
![]()
![]()
Ya'll Nibbiars happening but not at the quoted cost of 75 crores will surely cost more than 200 crores.This happening?