Ya'll Nibbiars Some Updates Related To Patna Metro. And In Second picture piling machine can be seen and in third picture 1st Structure to be constructed.

E1z-fAYUcAQ38T-.jpeg
E1z-fQqVgAEIkcq.jpeg
E1z-fbkUcAQgCkm.jpeg
E1z-gJeVoAMhVzY.jpeg
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
26,883
Likes
99,905
Country flag
Ya'll Nibbiars Mumbai Nagpur expressway Package 14-Igatpuri Afcons Afcons start pqc laying of 16.71 kms of twin tunnels.Tunneling was completed in 24 months.

FBLXGULVQAc4orb.jpeg
 

Okabe Rintarou

Senior Member
Joined
Apr 23, 2018
Messages
2,337
Likes
11,967
Country flag
This guy is vlogging in a new office building he says will be demolished for the Central Vista project. The building is so new, it looks like a part of the Central Vista project.
 

ezsasa

Designated Cynic
Mod
Joined
Jul 12, 2014
Messages
29,178
Likes
132,742
Country flag
This guy is vlogging in a new office building he says will be demolished for the Central Vista project. The building is so new, it looks like a part of the Central Vista project.
apparently the building is called ministry of external affairs jawaharlal nehru bhawan opened in 2018.
by the time central vista construction comes to this plot, it will take another 5-6 years.
 

devx101

Regular Member
Joined
Mar 28, 2011
Messages
91
Likes
303
Country flag
Ya'll Nibbiars World Trade Center , Nauroji Nagar, Delhi by NBCC. And but most of the offices spaces are already sold out to PSU/Govt offices. Hardly any remains for the private sectors.

View attachment 112950View attachment 112951View attachment 112952View attachment 112953
This is a Model development project i think. This template will be used for all dilapidated office and residential buildings in Delhi area. Hope they launch 5 such projects in one go in next batch.

Delhi needs a little bit of HighRise culture. Not much Ofcourse bcoz of security reasons but still 20-25 floors should be allowed. It should start a Mumbai style redevelopment model for Basti /Slum areas.
 

devx101

Regular Member
Joined
Mar 28, 2011
Messages
91
Likes
303
Country flag

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
26,883
Likes
99,905
Country flag
Why this bridge has soo many piers?!! Should have done cable stayed bridge at least in some sections. Will not so many piers block water navigation!
They are charging thousands of crores for this bridge, still such a simple design??!!
Ya'll Nibbiars has two cable bridges sections. And it's not a simple design. You are forgetting it's length. And also the land and drigging is challenging due to the soil. And Rock base. And it's a sea bridge not a land bridge.
 
Last edited:

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
26,883
Likes
99,905
Country flag
Ya'll Nibbiars Pakal Dul hydroelectric power project -1GW-J&K. IT comprises a 167m-high concrete-face rockfill dam ,4 49m-high underground powerhouse each generating 250mw.Work started in 2018.Afcons, JP associates, L&T are contractors.Completion period-2025.

FBTmXbrUcAIO0kB.jpeg

FBTmXbrUYAgxDZ8.jpeg
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
26,883
Likes
99,905
Country flag
Ya'll Nibbiars NHAI floats tender for 4 laning of Ratnagiri to Kolhapur NH 166 in the state of Maharashtra Entire Ratnagiri to Nagpur NH 166 will be 4 lane in next 3 years. Niwali Ratnagiri JSW Jaigad Port Highway also needs to be 4 lane. This will offer great port connectivity between Konkan and Vidarbha.
 
Last edited:

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
26,883
Likes
99,905
Country flag
Ya'll Nibbiars Tje Airoli Katai naka freeway

1 . On Airoli creek bridge

2. The 1st wing attached to central spine at Airoli.

FBU6YaWUUAMQgxL.jpeg

FBU6YavUUAYhBfL.jpeg
 

pipebomb

Regular Member
Joined
Jul 30, 2021
Messages
555
Likes
1,167
Country flag
Do anyone know what percent of our coal fired thermal plants are ultra supercritical. And can syngas be used for ultra supercritical thermal plants
 

devx101

Regular Member
Joined
Mar 28, 2011
Messages
91
Likes
303
Country flag
Do anyone know what percent of our coal fired thermal plants are ultra supercritical. And can syngas be used for ultra supercritical thermal plants
Don't know about that but here is a Good article


Also i think time has come to block Imported coal fully. Convince coal producing states to reduce royalty substantially so that Imported coal becomes redundant.

One Thing which i want Govt. to pursue is CTL (Coal to liquid tech). India has enough coal to fully substitute crude oil imports. Yes it is CO2 intensive but we can handle that later. Crude Oil demand will reduce only after 2030 (God Knows) , and requirement of Petrochemicals will remain for foreseeable future. CTL plants with 20 to 25 life can do wonders to reduce dependence on Middle East Sheiks.
 

avknight1408

Senior Member
Joined
Apr 16, 2015
Messages
1,099
Likes
5,013
Country flag
Important project progressing well. Deadline is 2024

RISHIKESH - KARANPRAYAG RAILWAY Line. Unlike USBRL,this one is being constructed at brisk pace and without much brouhaha.Its tough keeping up with this project Pkg2 (18 to 33kms- L&T): Tunnel No 02 (6460m).





Rishikesh-Karnaprayag rail line Package-4 (47 to 63kms) -L&T. The star pkg of the line as it involves the longest rail tunnel in India(14.5 kms) near Devprayag.Out of 14.5 kms,10.4 kms wil b bored using TBM and rest by http://NATM.Pics of NATM work




 

pipebomb

Regular Member
Joined
Jul 30, 2021
Messages
555
Likes
1,167
Country flag
Don't know about that but here is a Good article


Also i think time has come to block Imported coal fully. Convince coal producing states to reduce royalty substantially so that Imported coal becomes redundant.

One Thing which i want Govt. to pursue is CTL (Coal to liquid tech). India has enough coal to fully substitute crude oil imports. Yes it is CO2 intensive but we can handle that later. Crude Oil demand will reduce only after 2030 (God Knows) , and requirement of Petrochemicals will remain for foreseeable future. CTL plants with 20 to 25 life can do wonders to reduce dependence on Middle East Sheiks.
Appreciate your response, i have to look up coal to liquid tech now. I agree we are not using our domestic coal to its full potential. Maybe current crisis is an opportunity in disguise like the pandemic was.
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
26,883
Likes
99,905
Country flag
Important project progressing well. Deadline is 2024

RISHIKESH - KARANPRAYAG RAILWAY Line. Unlike USBRL,this one is being constructed at brisk pace and without much brouhaha.Its tough keeping up with this project Pkg2 (18 to 33kms- L&T): Tunnel No 02 (6460m).





Rishikesh-Karnaprayag rail line Package-4 (47 to 63kms) -L&T. The star pkg of the line as it involves the longest rail tunnel in India(14.5 kms) near Devprayag.Out of 14.5 kms,10.4 kms wil b bored using TBM and rest by http://NATM.Pics of NATM work




Ya'll Nibbiars this project is going on the slow pace and aready delayed by many years. Sad to see that USBRL is going so slow. It either time to change the contractor or review the projects.
 