Infrastructure and Energy Sector

FalconSlayers

धर्मो रक्षति रक्षितः
Senior Member
Joined
Oct 14, 2020
Messages
23,592
Likes
152,952
Country flag
Why doesn't the IR want more dedicated freight corridors? They are money makers for IR if utilized properly.
Government will have to sanction the project when it becomes feasible, as of now Western and Eastern dedicated freight corridors are necessary and then North-South, East-West and Coastal Dedicated Freight Corridor.
 

Knowitall

Senior Member
Joined
Jan 31, 2019
Messages
7,930
Likes
35,884
Why doesn't the IR want more dedicated freight corridors? They are money makers for IR if utilized properly.
They are probably waiting for the current ones to be completed.

The current lines have faced multiple cost overruns amounting to thousands of crores. The smart choice is to first complete the current lines and save the money for some extra expenses that come up along the way.

Once done learn from the previous exercise and plan out the new lines much more effectively.

One must also remember that the new lines will eventually be built using gati Shakti and other important software meaning previous land hurdles will mostly be negated before construction can start and acquisitions will be much more faster.
 

kharabela

Regular Member
Joined
Dec 10, 2022
Messages
186
Likes
989
There has been a breakthrough in nuclear fusion technology in a research lab in USA , california . There is a net gain of energy . Not expert to comment how significant it is and how far it is from being commercialized . Will be a epoch moment in human civilization .


 
Last edited:

kharabela

Regular Member
Joined
Dec 10, 2022
Messages
186
Likes
989
Sivok-Rangpo railway line between West Bengal and Sikkim has now seen a major breakthrough. . this new rail link project is about 45 km long and is characterised by 14 tunnels, 13 major bridges, 10 minor bridges, and 4 new stations. project to finish by late 2023 .

 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
26,883
Likes
99,905
Country flag
Ya'll Nibbiars The Teesta Stage VI, 500 MW is a Run of River Hydropower in Sirwani Village of Sikkim to utilize the power potential of Teesta River Basin. After Lanco went bankrupt, NHPC tookover and plan to complete by '24. The 1st of 4 Francis turbine lowered.

Fj-8JIOaUAArwoU.jpeg
Fj-8JIPagAAEU43.jpeg
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
26,883
Likes
99,905
Country flag
Ya'll Nibbiars The CSIRCRRI had another glorious with the BRO and the Tata Steel by constructing first steel slag road to sino India border in northeast at Arunachal Pradesh.

FkFsJMuUAAAtdc6.jpeg

FkFsJtTUAAkwFCw.jpeg
FkFsKdfVsAAzXN5.jpeg

FkFsLRkUYAU1uYt.jpeg
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
26,883
Likes
99,905
Country flag
viaducts are so ugly and no finishing at all. These goes through the middle of major cities.
Ya'll Nibbiar When I pointed at that Some members were busy targeting me. And what not. Saying a stroke of paint will not change anything. For them is nothing less than a master piece.

:truestory:
 