Ya'll Nibbiars The New Airport in KSA. And even the 12 crores capacity NMIA and JIA, looks small in front of this Monsteracity, capacity 20 crores.
View attachment 184837View attachment 184838View attachment 184839View attachment 184840View attachment 184841
View attachment 184843View attachment 184844View attachment 184845View attachment 184846View attachment 184847
Bhai us choclate me alcohol in heMai to khaunga
Their country is basically a desert so there is no issue of land.Ya'll Nibbiars The New Airport in KSA. And even the 12 crores capacity NMIA and JIA, looks small in front of this Monsteracity, capacity 20 crores.
View attachment 184837View attachment 184838View attachment 184839View attachment 184840View attachment 184841
View attachment 184843View attachment 184844View attachment 184845View attachment 184846View attachment 184847
When did I say it?Ya'll Nibbiars so according to your statment jewar is non-existence. And pune is not in making.
Ya'll Nibbiars this airport is of similar is size to the JIA and CSAIA at pune. The thing is they gone much bolder than us. And despite half in land size the NMIA airport will have similar capacity to the JIAs.When did I say it?
I said Saudi Arabia has no issue with land they don't have to think much for big Projects.
Ya'll Nibbiars so according to your statement jewar is non-existence. And pune is not in making.Their country is basically a desert so there is no issue of land.
View attachment 184830
There was a plan to set up ORR for Kolkata back in 2006 under the Left Govt. Now it seems to be covered under various National Highway Projects :
- Haldia-Panskura : Already Done with NH 116+Nh16.
- Panskura-Arambagh-Bardhaman: Will be covered under Proposed Kharagpur-Siliguri ( Moregram) Economic Corridor.
- Krishnanager-Bongoan-Basirhat: Will be covered under 4 lane NH 312 ( Jalangi-Barishat ) Highway.
The only gaps remaining are :
- Basirhat-Canning
- Canning-Raichawk-Haldia
- Bardhaman-Nawadwip-Krishnanger
These gaps are currently connected through 2-lane State Highways which needs to be upgraded to NH level Standard.
Bongoan (Petrapole) & Bashirhat (Ghojadanga) are two important Indo-Bangla Border Crossings.
Canning : Gateway to Sunderbans ( Royal Bengal Tiger Reserve and World largest mangrove forest).
Richowk : An riverside resort area for weekend gateways and villas.
Halida : Important Ports:
Nawadwip: Famous for Nawadwip dham ( Religious Site)
Krishnanager: Important Historial Town famous for Krishnanager Rajbari (My father's hometown)
As you can see this ORR covers very important areas for International trade, seaport, tourism and religious sites.
how did they arrive at this 1163 gwh number?Amazon India on Thursday announced its first wind-solar hybrid projects in India, marking a big shift to clean energy. The two projects with a capacity of 300 MW will be based in Madhya Pradesh & Karnataka, and once operational, will produce 1163 gigawatt hours of clean power.
300 MW X 6-8 hrs of wind power = 1800-2400 MWh or 1.8-2.4GWh * 365 = 657-876 GWh per year. Multiply this by two units and you get 1300GWh-1700GWh.how did they arrive at this 1163 gwh number?
if we assume this is the carbon credit pricing300 MW X 6-8 hrs of wind power = 1800-2400 MWh or 1.8-2.4GWh * 365 = 657-876 GWh per year. Multiply this by two units and you get 1300GWh-1700GWh.
This site might be the most Filthiest thing I have ever seen.if we assume this is the carbon credit pricing
https://carboncredits.com/carbon-prices-today/
any idea how much carbon credits they will be earning roughly from this venture?
Are there any greenfield rail lines under construction other than DFCs !?West Bengal: Four Greenfield Expressways In Pipeline To Improve Logistics Efficiency Of East India
1. Kharagpur-Burdwan-Moregram Expressway
The 230-km-long greenfield expressway starts from NH-16, near Kharagpur and ends at Morgram (NH-34 & NH-60 Junction) in the state of West Bengal. The 4-lane expressway will be built into five packages, at an estimated cost of Rs 12,000 crore. The tenders for the project road shall be floated by December 2022.
![]()
2. Gorakhpur-Siliguri Expressway
The 519-km-long greenfield expressway runs from Gorakhpur in Uttar Pradesh to Siliguri in West Bengal via Bihar. Around 84 km of this four-lane expressway would pass through Gorakhpur, Deoria and Kushinagar districts in Uttar Pradesh before entering Bihar. t will pass through West Champaran, East Champaran, Sitamarhi, Madhubani, Supaul, Araria and Kishanganj before reaching Siliguri.
![]()
The National Highways Authority of India (NHAI) has finalised the alignment for the expressway and work tender for the project shall be awarded in the next year. The expressway, once operationalised will provide a direct link for out bound traffic from Northeast region towards northern India including the national capital, Punjab and Haryana.
3. Varanasi-Kolkata Expressway
The 610-km-long greenfield expressway has been planned under Bharatmala Pariyojna (BMP) Phase-2 to provide high-speed connectivity to the northern and eastern regions of the country.
Starting at the junction of NH-19 and Varanasi Ring Road, the access-controlled expressway passes through Bihar and Jharkhand, before terminating at NH-16 near Uluberia in Howrah district in West Bengal.
![]()
At present it takes at least 12 to 13 hours to cover 644 km between Varanasi and Kolkata via NH-2 (Golden Quadrilateral Road). The Varanasi-Kolkata expressway which will run parallel to NH-2 will reduce the travel time to 7-8 hours. Construction of this expressway is set to commence in January 2023, as the work order will be allotted by next month.
4. Raxaul-Haldia Expressway
The 700-km-long greenfield expressway starts at Raxaul on Indo-Nepal border in Bihar and terminates near Haldia port in West Bengal. Passing through Jharkhand, the expressway will cross Asansol, Durgapur and West Midnapore districts in West Bengal, and will be connected to Kolkata.
![]()
The Rs 35,000 crore project will criss-cross Kharagpur-Burdwan-Moregram and Varanasi-Kolkata expressway, near Ramjivanpur village in West Midnapore district, thereby providing seamless interchange across all three expressways. The four greenfield expressways, once ready, will facilitate direct and indirect employment to lakhs of people and will change the physical face of West Bengal. These expressways will unlock the state's potential and kickstart the industrial development of the state.
@thebakofbakchod nibba why are you angry?
What do folks expect from tier 3 station anyway.It looks more or less same just little bit asthetic job on outside.
Oh no.I was not complaining.I was just explaining my take that’s all.What do folks expect from tier 3 station anyway.