What happens to the Jaguar reengining program hal has envisaged? Please shed some light?

The IAF's plan to replace the Jaguar's underpowered engine too, has been stalled for long.

Officials, however, said price negotiations with engine maker Honeywell will start soon.
The defence ministry, however, is reluctant because Honeywell is the only vendor in the fray. In response to an IAF tender in 2010, British company Rolls-Royce declined to quote, apparently because it had no suitable engine. Pratt & Whitney, the other big US engine-maker, was unwilling to transfer technology.

http://www.business-standard.com/ar...cial-for-indian-air-force-115032700053_1.html
 

lcafanboy

Senior Member
Joined
Mar 24, 2013
Messages
5,776
Likes
36,927
Country flag
India Jaguar fighters face upgrade challenges
Published August 20, 2017 SOURCE: Defensenews.com


The Indian Air Force’s British-made Jaguar aircraft completed its maiden flight last week after integrating an advanced active electronically scanned array radar, but service officials say the Jaguar upgrade program is moving slowly and that there’s uncertainty regarding the mounting of proposed new engines. The upgrade program of the Jaguar fighter, undertaken by India’s state-owned Hindustan Aeronautics Limited, includes mounting new engines from Honeywell of the U.S., but an executive with HAL said it’s ”still awaiting the go-ahead from the Indian Air Force for the new engines.” “Not only is the upgrade program slow, but the autopilots on the Jaguar aircraft are malfunctioning,” the IAF official said. Furthermore, only 18 autopilot systems out of a required 108 could be integrated on Jaguar aircraft, according to a second Air Force official. India contracted the purchase of 35 autopilots from Thales of France on the Jaguar, which were received between December 2006 and January 2008. Due to contractual restrictions, HAL could integrate only 18 out of the 35 autopilots up until March 2017. And the autopilots installed on the aircraft are functioning at a suboptimal level because a vital component ? the Auto Pilot Electronic Unit, which maintains the flight path of the aircraft ? required repairs by Thales, which are expected to be completed in 7 to 26 months. The HAL executive placed blame: ”Upgrade of autopilot has been slow because of delays in supplies by French defense companies.” The Jaguar with the new AESA radar made its maiden flight Aug. 10, but the Air Force will carry out six more tests before induction. The AESA radar were bought from Elta of Israel as part of the Jaguar upgrade program. The new-generation radar will help in the simultaneous detection of multiple targets and also in the release of missiles to counter threats. The current AESA radars are designed for easy retrofit in field conditions with minimum disturbance to the aircraft, the HAL executive noted. Currently, the Indian Air Force is the only air force using the Jaguar, and HAL is therefore the only original equipment manufacturer able to maintain and upgrade the aircraft. The ongoing program will involve 59 Jaguars that have a DARIN I radar and upgrade them to the DARIN III standard, which will include the fitting of the AESA radar. The program also includes several missile-carrying capabilities as well as avionics upgrades that are expected to extend the aircraft’s life to 2050. (The initial phase out of the aircraft will begin in 2035, and it will be fully phased out by 2050.) The upgrade is expected to include replacing the Rolls-Royce ADOUR 811 engine with new F125N engines from Honeywell, noted the first Air Force official. Honeywell emerged as the sole vendor in response to a 2008 tender because Rolls-Royce of the U.K. withdrew from the competition. However, the clearance to buy 280 new Honeywell engines worth $2 billion has hit a roadblock in India’s Ministry of Defence because of the single-vendor situation, which the MoD tends to discourage, save exceptional circumstances.

idrw.org .Read more at India No 1 Defence News Website http://idrw.org/india-jaguar-fighters-face-upgrade-challenges/ .
 

gekko

Regular Member
Joined
Jul 10, 2017
Messages
518
Likes
2,688
What IAF leaks to the media : India Jaguar fighters face upgrade challenges

What IAF really means : GOI refusing to give in to IAF blackmail for importing more useless aftermarket upgrades with hefty cutbacks.

One week later : India is not prepared for a two front air war.

This shit is getting old now. The fact that these opportunists leaked it to the press during an ongoing Doklam standoff with China shows what's cooking in their heads.
 

AUSTERLITZ

Regular Member
Joined
May 25, 2013
Messages
482
Likes
1,743
Country flag
Putting AESA on jaguar was waste of money.Whats the point of AESA in a low level ground strike aircraft.Buy more meteor missiles for fighters or PGMs for jaguar like cbu-97.
 

Kalki_2018

Regular Member
Joined
Jun 28, 2017
Messages
720
Likes
1,253
Country flag
Jaguars can now at least defend themselves with ASRAAM. Basically Israel had agreed to provide EL-2052 that they were not allowed to put on their own F-16's, if we put it on 2 aircrafts. One was Tejas and the other one which needed an upgarde was Jags. For Mirage and Su-30, France and Russia will not play ball. The rest of the Aircrafts have just been upgraded or on their way out.
 

Sancho

Senior Member
Joined
Sep 25, 2011
Messages
1,831
Likes
1,035
Jaguars can now at least defend themselves with ASRAAM. Basically Israel had agreed to provide EL-2052 that they were not allowed to put on their own F-16's, if we put it on 2 aircrafts. One was Tejas and the other one which needed an upgarde was Jags. For Mirage and Su-30, France and Russia will not play ball. The rest of the Aircrafts have just been upgraded or on their way out.
Asraam is an IR missile and will be upgraded to all Jags, while the AESA is mainly replacing EL 2032 in the maritime attack versions, which means that it mainly improves anti ship attack missions. Other than that, it's a waste of money as @AUSTERLITZ correctly stated. It even shows the poor state of IAF is in at the moment, when a strike fighter with no BVR A2A capability, gets the most modern radar tech first.
We should have tried to sell them to Afghanistan, for any kind of returns and replaced them with LCA FOC or MK1A instead. One type of fighter less and no future spare supply burden anymore, while LCA is good enough to replace a 3rd gen strike fighter.
 

Adioz

शक्तिः दुर्दम्येच्छाशक्त्याः आगच्छति
Senior Member
Joined
Aug 14, 2015
Messages
1,419
Likes
2,819
We should have tried to sell them to Afghanistan, for any kind of returns and replaced them with LCA FOC or MK1A instead. One type of fighter less and no future spare supply burden anymore, while LCA is good enough to replace a 3rd gen strike fighter.
:eek1:
Aaj suraj kidhar se nikala tha?
"LCA is good enough". Never thought I would see the day when @Sancho would post this.:laugh:
Where did the sun rise from today? You deeming Tejas to be good enough?
 

captscooby81

Senior Member
Joined
Dec 25, 2016
Messages
7,053
Likes
26,924
Country flag
Naaa aaj suraj wahi se nikala ..you missed the point where he said LCA is good enough to replace any "3rd Gen Strike Fighter" he just used little sugar coated his point ..3rd Gen<LCA<4th Gen...

:eek1:
Aaj suraj kidhar se nikala tha?
"LCA is good enough". Never thought I would see the day when @Sancho would post this.:laugh:
Where did the sun rise from today? You deeming Tejas to be good enough?
 

Immanuel

Senior Member
Joined
May 16, 2011
Messages
3,541
Likes
7,446
Country flag
AESA has plenty of advantages for maritime as well for monitoring of ground based threats.

The Jaguar is quite a tough bird and perhaps the best ground pounder in inventory (PGM wise), armed with weapons like Paveways, Griffins & not to mention the CBU-105. AESA on Jag only improves it's ability especially using advanced SAR modes & tracking moving ground targets simultaneously, very essential while deploying a weapon like the CBU-105. They just need to go ahead and re-engine it with the F125IN, should drastically increase it's overall aerial performance, range & useful payload. It's essentially the bomb truck to clear the path for our strike corps.
 

Sancho

Senior Member
Joined
Sep 25, 2011
Messages
1,831
Likes
1,035
:eek1:
Aaj suraj kidhar se nikala tha?
"LCA is good enough". Never thought I would see the day when @Sancho would post this.:laugh:
That's because you don't read and understand properly, since I am saying it all the time, that LCA so far, is just a basic strike fighter and has similar load and performance as the Jags.
We kept producing the Jags, just because we had a production line, not because they are operationally useful in modern air warfare. Now are stuck with them, as the only operator in the world and that's why we are desperate to search for 2nd hand spares now and wasting money on upgrading them, without the hope to be much more capable than even LCA IOC.
 
Last edited:

Sancho

Senior Member
Joined
Sep 25, 2011
Messages
1,831
Likes
1,035
Naaa aaj suraj wahi se nikala ..you missed the point where he said LCA is good enough to replace any "3rd Gen Strike Fighter" he just used little sugar coated his point ..3rd Gen<LCA<4th Gen...
4th gen would require multi role capability, which LCA only gets with the FOC.
The Jags even with AESA, glass cockpit and improved avionics will never be multi role capable, so will be limited to 3rd gen single role capability.
 

Sancho

Senior Member
Joined
Sep 25, 2011
Messages
1,831
Likes
1,035
AESA has plenty of advantages for maritime as well for monitoring of ground based threats.
"As a technology", yes. But you have to keep in mind, that the Jag radar is a very small one, with a small diameter and that restricts it's performance by far. There is a common misconception, that any AESA must be a highly capable radar, but that's not the case, because at the end of the day the size is the key factor for a radar and an old, but large BARS PESA will beat EL 2052 in the Jags, or LCA in terms of performance.

The Jaguar is quite a tough bird and perhaps the best ground pounder in inventory (PGM wise), armed with weapons like Paveways, Griffins & not to mention the CBU-105.
Not really, since it was designed to carry and deliver dumb bombs, but it doesn't have a dedicated LDP station and with more space requirements of guided bomb kits, it's load capability is limited too. An MKI can carry multiple times the PGM load of a Jag, besides a variety of A2G missues, that the Jag doesn't have either. If we would upgrade the MKI with terrain following radar modes and avionics, it would beat the Jag in that field too.
Even the upgraded Mig 29 offers more A2G capability now, than the Jags, since they added PGMs, Kh 29 A2G missile, Kh 31 for SEAD and Kh 35 for maritime attack too.
The times of single role strike fighters are gone and today you don't need a specific design anymore, to be a good strike platform, because the weapons got far more capable and do most of the job.
 

darshan978

Darth Vader
Regular Member
Joined
Oct 22, 2017
Messages
476
Likes
766
Country flag
That's because you don't read and understand properly, since I am saying it all the time, that LCA so far, is just a basic strike fighter and has similar load and performance as the Jags.
We kept producing the Jags, just because we had a production line, not because they are operationally useful in modern air warfare. Now are stuck with them, as the only operator in the world and that's why we are desperate to search for 2nd hand spares now and wasting money on upgrading them, without the hope to be much more capable than even LCA IOC.
if LCA is basic strike fighter then what about south-Korean fa50 , jf 17, Taiwanese LCA ,aren't they same you are just biased against our LCA
and you are saying jf17 better than LCA how??
 

Babloo Singh

Regular Member
Joined
Oct 8, 2015
Messages
523
Likes
3,316
Country flag
Coming back to Engine upgrade of Jaguar's....
There is no news/ update regarding regarding replacement of engine.
The Rolls Royce Adour's were to be replaced (Length: 114 inches (2.90 m) Diameter: 22.3 inches (0.57 m) Dry weight: 1,784 lb (809 kg) Maximum thrust: 6,000 lb (27.0 KN) dry / 8,430 lb (37.5 KN) with reheat )

Honeywell F125 was being considered.... (Length: 124 inches Diameter: 36 inches Dry weight: 1050 lb (522 kg) Maximum thrust: 5,760 lb dry / 9,080 lb with reheat )

Now my point is that Japan developed new engine for it's Mitsubishi X-2 Shinshin, which is IHI XF5 looking at it's specs it seems it may be best option for Jaguar engine upgrade.. (Length: 120 inches Diameter: 24 inches Dry weight: (644 kg) Maximum thrust: 49Kn / 11,023 lb ) this engine seems to be better fit on Jaguar and is much more powerful than F-125, since it's new engine I am sure the fuel efficiency will be better than both Adour & F-125. 25%+ jump in power coupled with 300kg weight reduction will make Jag's young again....
 

binayak95

Senior Member
Joined
Jul 18, 2011
Messages
2,449
Likes
8,413
Country flag
Did you just call the Jag a useless aircraft in Modern Warfare? Wow, mate. Its the best DPSA in service at the moment. The Jaguar performed brilliantly in RAF service in Operation Desert Storm, so do some reading first before calling it useless.
That's because you don't read and understand properly, since I am saying it all the time, that LCA so far, is just a basic strike fighter and has similar load and performance as the Jags.
We kept producing the Jags, just because we had a production line, not because they are operationally useful in modern air warfare. Now are stuck with them, as the only operator in the world and that's why we are desperate to search for 2nd hand spares now and wasting money on upgrading them, without the hope to be much more capable than even LCA IOC.
 

Jameson Emoni

Senior Member
Joined
Apr 15, 2018
Messages
1,473
Likes
4,250
The IAF's plan to replace the Jaguar's underpowered engine too, has been stalled for long.

Officials, however, said price negotiations with engine maker Honeywell will start soon.
The defence ministry, however, is reluctant because Honeywell is the only vendor in the fray. In response to an IAF tender in 2010, British company Rolls-Royce declined to quote, apparently because it had no suitable engine. Pratt & Whitney, the other big US engine-maker, was unwilling to transfer technology.

http://www.business-standard.com/ar...cial-for-indian-air-force-115032700053_1.html
Honeywell employs quite a few Indian workers both in India and US. So it is a good choice to go with Honeywell.
 

Wisemarko

Senior Member
Joined
Nov 1, 2016
Messages
1,313
Likes
2,577
Country flag
Putting $2 billions worth of engines on an obsolete aircraft is impressive- it can be a costly mistake as well. US Air Force also deliberates on engine upgrade for B-52 and E-2. Although, the reason for upgrade is lack of supply chain issues with 50+ years old engines. Even then, people are skeptical about this plan. Read this good analysis- not all performance improvements are good and some are even dangerous:

Old Dog, New Engines: The Truth about a B-52 Re-Engine
November 22, 2016

It seems that the USAF cannot get through a year without being inundated with calls to replace the engines on the B-52. Recent calls from Air Force Global Strike Command,[1] Boeing, General Electric[2] and Pratt & Whitney[3] have renewed the vigor of the program despite the general lack of funding and enthusiasm for large dollar aircraft procurement. Fuel savings and increases in capability are touted as the driving factors in these programs. However, for the B-52 these arguments show little merit when they are studied with any depth.

Where it concerns the B-52, we are fortunate that there is a long and well documented history of the design process. Not only do we know the specifics of the design, we know why it was designed a specific way. Its strengths and weaknesses have been well vetted through a half century of combat. That history can guide us towards a full understanding of what a re-engine[4] program may entail.

Re-Engine Programs

Upgrades to existing systems are done for a variety of reasons. Typical upgrades are used to correct a deficiency or to create a required capability. There have been cases where upgrades are done to ensure a particular system remains viable in a new environment. Sometimes upgrades solve logistical problems as certain parts are no longer produced and an upgraded system is necessary to continue using the whole aircraft. For example, in the early 2000s the B‑52 upgraded its 1970s‑era beryllium ball inertial navigation system with a modern ring-laser gyro system in order to correct a failed supply line, not to increase its navigation performance.

Generally speaking, airframe efficiency evolves much slower than engines. These upgraded engines always appeal to operators with the same line: better utility and lower costs. Newer engines provide better range, longer loiter time, less fuel, more thrust, reduced maintenance, and many other benefits. Therefore, with all of these advantages, re-engine programs should be much more prevalent.

Commercial re-engining programs, as we know them, began in the 1970s when the Environmental Protection Agency enacted emissions and noise restrictions on turbojet engines. The commercial market reacted with new aircraft that were equipped with more efficient engines with a smaller noise footprint, rather than attempt wideband re-engine programs. However, the two most popular aircraft, the Douglas DC-8 and Boeing 707 did attempt re-engine programs. The DC-8 upgraded their Dash 60s with JT3D[5] engines to the Super 70 series equipped with a more efficient CFM56 high-bypass turbofan. The engines were more efficient with a smaller noise footprint, but the DC‑8 actually lost takeoff performance in the conversion. The engines were much heavier, therefore the DC‑8 lost some payload capacity. The 707 attempted something similar, also with the CFM56, but found that smaller orders limited their profits. They also felt an upgraded 707 was competition to the new 757 and scrapped the program to all but a few customers. In the large aircraft, large fleet categories, these represent the bulk of re-engine programs for the past 30 years. It was simpler and cheaper to just make a new airplane.

On the military side, re-engine programs were fairly scarce. Businesses wish to operate at a profit, therefore cost savings is all-important. These programs were designed to save fuel. Governments, specifically militaries, do not necessarily need to operate in such a manner. However, in the USAF has made these decisions in the past. The C/KC‑135[6] was re-engined twice. In the 1980’s the USAF re-engined all of the Reserve and Guard KC‑135s with the TF‑33 turbofan. Not only did the KC-135 get more thrust (7,000 pounds of thrust increase per engine), they also saw a 14% increase in fuel efficiency and was capable of off-loading 20% more fuel to receivers. The active duty KC-135s were also upgraded later, these to the CFM56 high bypass turbofan. This provided a 100% increase in thrust over the original KC‑135. The newest KC-135 is 25% more fuel-efficient, with 60% increase in range, can offload 50% more fuel, and costs 25% less to operate than its original version. This data suggests re-engine programs are a slam dunk, no-brainer in the world of aircraft acquisitions. It begs the question, why are these programs not taking place everywhere? Because fuel savings alone is not enough to justify the cost of new engines.

Fuel Savings

In order to understand why these types of programs generally do not pass the cost-benefit curve in the area of fuel savings, it is important to understand how the USAF consumes and pays for fuel.

In all air fleets, there are two types of cost, (1) Fixed Annual Cost, and (2) Variable Costs. Fixed costs are those that must be paid regardless of usage. If the aircraft flies 1 hour or 1,000 hours the fixed cost is the same. The variable cost is dependent on how much the aircraft flies. More flying, more cost. The USAF sinks 90%-95% of its overall cost in the fixed category, meaning USAF aircraft cost the same no matter how much they are flown. This is backwards from how commercial aircraft are operated. The USAF does this because it does not utilize its aircraft nearly as much as a commercial carrier. The average USAF non-fighter, large aircraft flies approximately 350 hours per aircraft per year. By comparison, the average US commercial airliner files approximately 3,000 hours per aircraft per year. In the commercial world, idle aircraft are lost revenue. Commercial airlines have far more variable cost, therefore fuel prices and fuel consumption have a significantly greater effect on a commercial fleet’s profitability. Fuel consumption and efficiency is almost negligible for the USAF.

When the B-52 re-engined to the TF33 between the G and H-models, it realized a 20% fuel savings[7] similar to the savings realized for the KC‑135. Studies have shown that a similar fuel savings (up to 25%) could be realized with modern engines. But that kind of savings just does not make a dent in the USAF budget nor does it cover the cost of the engines, the program, or the management. The B-52 burns, on average, 88 million gallons of jet fuel per year representing 5% of the total jet fuel in the USAF.[8] Even if the USAF could reduce fuel consumption in its entire fleet of aircraft, all of them, by 25% and save more than 500 million gallons of fuel per year it would save $1B per year. Sounds like solid savings, however that represents less than 1 percent of the USAF budget.

In the past 20 years there have been no less than eight separate official studies on the subject of replacing the engines on the B-52.[9] Sometimes the study looked only at the B-52, sometimes it encompassed the entire USAF fleet, sometimes only those who utilize a particular engine.[10] In all cases they found fuel savings and fuel efficiency are not reason enough to justify the cost of the program.

Hidden Costs of Re-Engine Programs

When aircraft are designed, they are designed with a particular engine in mind. Sometimes one is developed before the other, but the integration of the two is a marriage of design of the highest importance. When the engine is changed, no matter how much analysis and planning is done, the program will experience unforeseen operational implications. It is inevitable; you have changed an integral part of the holistic design of the aircraft. Engine retrofits are backwards in the aircraft-engine marriage. Initial designs optimize performance, while re-engine programs strive to minimize complications.[11] The B-52 was designed to handle the Pratt-Whitney J57 turbojet engine. Over the years, several variations have been flown, but all of them have been the J57 or derivatives thereof. The TF33 is the turbofan derivative of the J57.[12]

There is a general lack of understanding of the magnitude and complexity of any re-engine program.
-The National Research Council.

On the outset of the KC-135 re-engine program, it was viewed as a straight forward engine replacement. However, the USAF was unable to complete the program without unnecessary cost and schedule overruns. Even with all of the data and lessons learned from the DC‑8 and 707 re-engine. Unforeseen operational limitations showed, schedule slips occurred, production quantities changed which served to increase total program costs. That logically led to a longer payback period and fewer modified aircraft.

Conceptually, a B-52 engine replacement can be a low technical risk program. But that does not excuse the USAF from marginalizing the technical risk or the costs involved. It is in this area where the operational impacts will show. As the USAF changes the engine, it also imposes changes on flight dynamics, engine out characteristics, wing flutter, weapons release envelopes, to name a few. The placement of engines on the wing is an issue of concern, as is the design of the engine nacelles. Each of these problems will have to be solved. Each of these solutions will cost money. This money will eat into the proposed ‘savings,’ eroding the true savings of the program. This program is much more complicated than a straight forward plug-and-play engine. Any staff agency or corporation that claims plug-and-play ease is understating the complexity of the problem.



Historically, when an aircraft has undergone a re-engine, the aircraft environment has remained the same before and after. The KC‑135 was an air refueler before it received upgraded engines. After its new engines were installed it did the same mission in the same environment. The B‑52 is a bomber, that has never changed, but the manner and methods the B-52 has used over the years has changed dramatically. A critical example of this fact is how any new engine will affect the B‑52 tail and the rudder.

The Tail

When the B-52 was first designed it was envisioned for high altitude interdiction missions delivering nuclear bombs. The large vertical ‘shark’ tail was designed to optimize the high altitude flight regime. In the 1960s, when the F‑model was redesigned as the G-model, the tail was ‘cut off’ by 8 feet. This was done because the mission of the B‑52 had changed to low level penetration and the larger vertical tail surface was prone to flutter at low altitudes and high speeds. Therefore the tail was shortened and the chord (width) of the tail was increased. This removed some of the vertical surface to reduce the risk of flutter and strengthened the overall structure of the tail.[13] Today the B-52 has reduced its low level mission (anti-shipping and mining operations) and is back to primarily high altitude bombing.

The tail on today’s B-52H has a reduced static directional stability than what was originally designed. When the B-52 is in a disturbed condition at a sideslip angle, like when it loses an engine, the fuselage and engines pods are destabilizing, i.e., they work to increase the disturbance. That’s bad. The vertical tail surface counters that by generating a stabilizing side force. The B‑52 has a large fuselage side area, therefore it needed a massive vertical tail surface to counter it and produce a favorable static directional stability. When the tail was chopped, the Buff lost some directional stability in the high altitude regime, notably in air refueling. That directional stability was initially not acceptable and a new yaw dampener had to be designed to compensate.[14]



Look at the situation that the B‑52 currently sits. The size of the tail that was designed for the B‑52A optimized for a specific regime, at a specific thrust range. The tail was reduced in size and the thrust of the engines has increased, making the situation worse. Each modification has exacerbated this situation. The next modification could create unacceptable flight dynamics, causing unprecedented delays as new flight control workarounds are implemented. When thinking about new engines, the vertical tail is not something that can be ignored.

The Rudder

Concerning the rudder, the situation is much worse. The B-52 rudder and elevator have an exceptionally narrow chord. Most airplanes have at least a 25% chord, which allows sufficient power and effectiveness in both yaw and pitch during takeoff, landing, and asymmetric conditions. The same is not true of the B-52 with its 10% chord rudder and elevator. The chord was reduced because original designs of the aircraft had the tail exceeding critical Mach prior to the wing. The chord of the tail was reduced to ensure that the wing reached critical Mach first.[15]

The original designers knew that the rudder was underpowered. An aircraft the size of the B‑52 requires a massive rudder that does not exist. This rudder is insufficient for the basic needs of the aircraft, let alone for asymmetric engine-out scenarios. Original plans called for an all moving vertical tail, the first of its kind. However, Boeing doubted the reliability of the hydraulic actuators necessary to achieve this. The design was also too heavy for the tail structure to sustain. Therefore, Boeing designed, built, and incorporated the yaw-adjustable cross-wind landing gear,[16]what is known to B‑52 aviators as ‘cross-wind crab.’ This system allows the B-52 to operate during normal conditions of take-off and landing in crosswinds. However, the true problem was asymmetry.

Aircraft are most susceptible to asymmetric conditions during takeoff. An engine loss when the airplane is rolling down the runway, accelerating towards takeoff, can be catastrophic. When an engine fails during takeoff, the yawing moment displaces the airplane from the center of the runway. Rudder authority is what keeps the plane on the runway, however rudder effectiveness is dictated by speed. The faster the plane is, the more effective the rudder becomes. The airspeed at which the airplane, after engine failure, deviates 30 feet from the runway centerline, despite using maximum rudder (but without the use of nose wheel steering) is called the Minimum Control speed on the Ground (VMCG).[17] The B-52 rudder is sufficient to handle one engine loss during takeoff only when that failure is within a certain speed range and the failure concerns certain engines. Overall, the B-52 cannot pass this standard without the use of nose wheel steering. The Flight Manual specifically calls for the use of full rudder in any engine out scenario, the failure to do so could result in an increase of minimum control speeds of up to 25 knots.[18] Today’s B‑52 would not pass FAA certifications.

The KC-135 encountered a similar scenario when it upgraded from the TF33 to the CFM56. The newer engine had much more thrust (22,500 pounds) and created a much worse asymmetry during an engine out. The KC-135 had to install an Engine Failure Assist System (EFAS) to help with the situation. The pilot alone could not recognize and compensate fast enough to save the aircraft. The EFAS addition was necessary, was not envisioned at the program start, was not budgeted, and had an adverse effect on overall program success.

If the B-52 is retrofitted with a 4-engine setup, the rudder will not be capable of maintaining control in asymmetric conditions. A 4‑engine B-52 will require a new rudder. While an 8‑engine retrofit would reduce the risk in this area, it would not eliminate the necessity for testing. The thrust range is the particular concern. The 17,000 pounds of thrust of the TF33 is already outside the limits of the rudder. The current B-52 is thrust limited and does not utilize full power. Many new engine programs have dreams of smaller runways, higher temperatures, and greater takeoff weights. These things will not be possible for the B-52. The new engine will most likely have to be de-rated to maintain a margin of safety or have a new rudder system designed. A new rudder would likely be cost prohibitive.


This is not photoshop. In the 1970s a B-52 was used to test two different engines for the C-5. Both were installed and flown.

Performance Upgrades

Just as the DC-8 upgrade showed a decrease in payload and takeoff weight after upgrade, similar issues present when approaching a B‑52 re-engine with the objective of increasing performance.

When Strategic Air Command installed the Electro-Optical Viewing System (EVS) on G and H-model B-52s it created a speed problem. Prior to the EVS modification, the aircraft was capable of 0.91 Mach. The EVS modification created issues with airflow over the nose and between the chin pods. Higher speeds create localized supersonic airflow and made the pitot-static system unreliable. As a result the B‑52 was policy limited from its true top speed to a more reliable airspeed of 0.84 Mach. Therefore, new engines do not represent higher speeds for the B-52. Even if the EVS turrets are removed, it would only allow a return to the true aerodynamic limit of the airframe of 0.91 Mach. This speed is already achievable. Speeds greater than 0.91 Mach are unsafe because the B‑52 has a well-defined Mach Tuck. Higher speeds would require a complete redesign of the entire aerodynamic surface. The B‑52 is aerodynamically speed limited. In the area of speed, new engines accomplish nothing.

Many claim that new engines could increase the B‑52’s payload, allowing it to carry more bombs. Also not true. The B‑52 weapons carriage is volume limited, not weight limited. The only way to get more weapons is to create new racks to maximize the space available in the bomb bay and on the external carriage systems. New engines cannot give the B‑52 more space to carry more bombs.

Others claim a new engine would make the B‑52 more reliable. Again, not true. Hard as it may be to believe, the B‑52 is one of the most reliable aircraft in the USAF inventory. Mission capable rates vary by year, but the B‑52 has not fallen below 70% mission capable for decades, while the B‑1B and B‑2A have never been above 70%. 2016 Mission Capable Rates put the B‑52 at 72%, B‑1B at 46%, and the B‑2A at 55%. Understand, the engines have nothing to do with the mission capable rates of any of these aircraft. The low rates for the B‑1B and B‑2A are not engine related, nor is the high rate for the B‑52. The point is, the B‑52 is already the most reliable bomber the USAF has in its inventory. The limiting factor for all the bombers is electrical and avionics related. There is a case to be made for increasing the reliability of all the bombers, but engines will not increase or decrease that reliability. If there is money to be spent on reliability, that money does not need to be spent on B‑52 engines.

Still others make statements concerning the B‑52’s lifespan and how new engines could let it fly far past 2050. These claims are also false. The limiting factor on the B-52 service life has always been, and remains, the upper wing surface. The B‑52 upper wing surface was designed to give the aircraft a 35,000 hour service life. The reason the H-model B‑52 remains in service today is because it sat alert for decades and did not fly nearly as much as its predecessors. In terms of hours flown, the B‑52 is middle-aged. However, that timeline will have an end state. The current projections of B‑52s flying to 2040 are at current usage rates with current hours on its current wings. If the B‑52 flies past 2050 in bulk, it will need to resurface the wings, new engine or not.

Granted, a new engine can and will increase range and endurance but these performance increases are a by-product of engine efficiency. A program dedicated to increasing these capabilities does not make sense. Some engineering studies have stipulated that better engines could increase the unrefueled range of the B-52 by as much as 45%,[19] however B‑52 range is already the most impressive in the USAF fleet. The B-52 has many problems, however range and endurance are not among them. A program designed to fix non-existent problems does not need to exist.

For these reasons, a B‑52 re-engine program should not strive to increase performance in any way. Performance may increase in some areas, but it should not be the objective of the program. Similarly, fuel savings should not be the objective either. The only objective for a B‑52 re-engine that makes any sense is to reduce overall cost for the USAF.

Cost Savings

Because of these reasons, the goal of the B-52 re-engine program should be cost savings. The B‑52 does not have a performance problem, nor does it have a fuel problem. The B‑52 does have a cost problem, and that problem is entirely engine related. The TF33 engine, while easy to maintain by maintenance standards, is maintenance intensive. A modern engine would produce a drastic reduction in engine maintenance actions across the spectrum. But even that savings is not good enough. True cost savings exists only when the USAF divests itself of the TF33 engine fleet wide, not just for the B-52 fleet, but for the entire USAF fleet.

The TF33 has undergone an exponential increase in maintenance costs over the years, especially in depot. In FY99 it cost $286,000 to depot overhaul a TF33. Something that had to occur every 1500 hours. The studies done assumed cost to overhaul the engine would remain static with only inflation increases. By FY06 that cost had increased to $1.025M for each engine, much more than the studies had anticipated. By 2040, the projected end of the B‑52 service, it could cost more than $7M to overhaul each TF33. While the B‑52 program maintains 855 TF33 engines, the USAF as a whole cares for 2300 TF33 engines. True cost savings is in removing all of the TF33s. That means a re-engine program for the B-52, E-3, E-8, and OC/WC‑135s and the facilities and programs to maintain those engines.[20]This is where true cost savings will be realized. The USAF must take a holistic re-engining approach towards the TF33 engine with the goal of removing it from the inventory.

Completely removing the TF33 from the inventory is the only way a re-engine program for the B‑52 makes any sense.

Where the B-52 differs the most from all other re-engine programs, military or civilian, is when it comes to resale. The DC-8, 707, KC-135 and others all had residual value when their primary owners were finished with them. Re-sale recouped some of the sunk costs. The resale value of a B‑52 is zero. Not because it has no value, but because it will never be sold. While it is in the US interest to equip allies and friends with military technology, that store does not sell everything. Air superiority, air transport, and air refueling have value to the coalition, and the US wants to equip its allies with these capabilities. However, global strike capabilities are an entirely different story. The ability to strike over intercontinental distances with significant mass is something the US holds dear and does not wish to export. Therefore, all of the cost involved in a B‑52 re-engine and all of the savings must be realized with the primary owner.

The Way Forward

If the USAF decides to pursue a B-52 engine retrofit it should be done to maximize cost savings at the lowest possible technical risk. To reduce risk in the program, the following recommendations should be implemented:

  1. The entire TF33 inventory should be divested. This requires engine retrofits for the B‑52, E‑3, E‑8, OC/WC‑135s. TF33 depot facilities and the programmatic infrastructure supporting such activities should be repurposed or divested. This will increase program and technical risk by including 4 other weapon systems, however, without the other weapon systems the program does not meet its primary goal of cost savings.
  2. An 8-engine solution should be implemented. A 4-engine solution introduces unnecessary cost-prohibitive problems with asymmetric conditions and clearance volume under the wing. It also would require a ‘re-plumbing’ of fuel, hydraulic, pneumatic, and electrical systems.
  3. A commercial, in-production engine should be selected. This engine will have to be modified for military use, but is still less risky than a completely new source-selected engine.
  4. The engine should fit within the available volume of the existing engine nacelles. To design larger nacelles will have an adverse effect on the flight control systems.
  5. The engine should be of comparable weight of the existing engine. Too heavy and the wing will suffer structural problems, too light and the wing will experience flutter. An engineering analysis will have to be done to optimize weight tolerance of a new engine.
  6. Key Performance Parameters must not be based on performance increases. Any increase in performance will be a by-product of engine efficiency. This program must be viewed as a logistical program, not an operational one.
Source:
http://www.airpowerstrategy.com/2016/11/22/old-dog-new-engines/

In case of Jaguars, current engines are not very old and should be upgraded instead of replaced. HAL is already assembling HAWK engines that are similar to Jaguar engines. Honeywell seems to be showing ‘honey’ to Indian AF officials to pass this deal.

Read this:

Jaguar reengining conundrum

Since the middle of the last decade when the “Open Tender” system under the Defence Procurement Procedure (DPP) for the purchase of military hardware was introduced, cancellation of tenders by the Ministry of Defence (MoD) appears to have become a routine affair. The most recent case pertains to the request for proposal (RFP) for a new engine for the fleet of Jaguar aircraft for the Indian Air Force (IAF).


Of the fleet of Jaguars described as deep penetration strike aircraft (DPSA), acquired for the IAF in the late 1970s from the UK, around 125 remain in service. The ageing fleet is in need of major midlife upgrade to remain as a frontline combat aircraft. The aircraft currently powered by two Adour Mk 811 turbofan engines has a rather unfavourable thrust to weight ratio and hence is inherently underpowered. This feature has an adverse impact on the performance envelope especially in the demanding hot and high operating environments. Thus, apart from the upgrade of avionics and other systems, the Jaguars need new and significantly more powerful engines.

With the aim to gainfully utilise the residual airframe life of 10 to 15 years or so, a decision was taken a few years ago to replace the Adour 811 engines with more powerful ones. Thus, an RFP for new engines of higher thrust was issued by the MoD on November 26, 2010, to two of the engine manufacturers—Rolls-Royce, the supplier of Adour 811 engines currently fitted on the Jaguar aircraft of the IAF, and to the American aerospace major Honeywell that produces the F125IN which is regarded as a possible replacement.

Rolls-Royce initially offered the Adour Mk 821 which in fact is only an upgraded version of the Adour Mk 811 and although it can deliver higher thrust, it is not actually a new engine. In the strictest sense, there is a possibility that the Rolls-Royce offer could therefore be considered to be technically noncompliant. However, the Adour Mk 821 offered certain advantages. Firstly, it was a product of proven technology and has a high degree of commonality with two other engines from the same company in use in the IAF—the Adour Mk 871 turbofan fitted on the Hawk Mk132, and its predecessor, the Adour Mk 811 turbofan engines that power the Jaguar fleet.

As compared with the engine currently fitted on the Jaguar, the F125IN turbofan from Honeywell delivers 30 per cent higher thrust. Honeywell claims that the F125IN would offer “improved pilot safety, lower maintenance costs and outstanding reliability”. Honeywell also claimed that the modular construction of the F125IN and its integral dual full authority digital engine control (FADEC) system would provide substantial savings to the operator in life-cycle costs. It is however not clear whether or to what extent an ageing airframe will be able to fully and gainfully exploit the significantly higher level of thrust the two F125IN engines are capable of delivering.

The F125IN fitted on a Jaguar was successfully demonstrated to the IAF in 2007. Honeywell has moved forward since then acquiring its own Jaguar airframe and has completed design of its standard engines for production and is now ready for flight demonstration. Rolls-Royce opted to withdraw from the contest rather than be eliminated, resulting in a “single vendor situation”. Now, as dictated by the provisions of the DPP, the MoD has been compelled to withdraw the RFP.

The three options are – to make a fresh proposal and re-tender with modified technical parameters which is time-consuming negotiations; or to follow the FMS route that would obviate the need for “open tender” and inviting bids from a number of vendors. Recent history of deals pertaining to the procurement of defence equipment indicates that the FMS route has the best chance of successfully inducting urgently required defence hardware.

The third option is to scrap the re-engining programme for the Jaguar fleet and gradually phase out the aircraft, an option that may not be readily acceptable to the IAF.
 
Last edited:

smestarz

Senior Member
Joined
Nov 3, 2012
Messages
1,929
Likes
1,054
Country flag
It is heavily outdated plane,
There are planes in IAF with which some modification (simply adding some radar modes) can be much more capable than Jaguar in terms of warload, range and also multi role capability)
As you might be aware, Jaguar does not really have a BVR capability. So once its detected during Strike role, its all on itself. And as more distant the target is, the less chances of Jaguar. BTW do you remember how many decades ago was operation desert Storn? After that even F-35, Su-57 both were developed and now being produced..

Did you just call the Jag a useless aircraft in Modern Warfare? Wow, mate. Its the best DPSA in service at the moment. The Jaguar performed brilliantly in RAF service in Operation Desert Storm, so do some reading first before calling it useless.
 

Raj Malhotra

Senior Member
Joined
Aug 13, 2009
Messages
1,410
Likes
3,064
Country flag
I think better to order more Su-30 for DPSA role rather than re-engining Jaguars. Radar & Avionic upgrade may be justified but new Honeywell engines seems like a solution looking for a problem.
 