Sorry for being late to the party.Months ago i posted
Now info on Very Long Range Tracking Radar (VLRTR) system released
View attachment 41543
Is this from the recently released MoD annual report?
When the first VLRTR has been operational since 2017, the second system must have been made operational in 2019 or earlier.
There was an article a long time back on the selection of two sites in Rajasthan, Alwar and another place which I forgot for the deployment of early warning radars for BMD.
These two units must be deployed at the aforementioned sites.
Also, this proves that the recent article in print regarding BMD by Snehesh Alex Philip is some distance off mark. There a senior MoD official had said that it will take 3-4 years to field an operational BMD system for NCR protection once the govt gives approval.
The radars are already deployed. And the interceptors can be deployed and made operational within a short span of time now. These are on mobile TEL and won't require much infrastructure. And yes the LRTR too is based on a trailer and is a semi mobile system.
My two cents is the AAD Interceptor has already been deployed for some time and the PDV too is deployed and operational or will be deployed soon.
This is for the NCR region.
The one for Mumbai may also be up and running.
Besides the VLRTR, we have also a single digit no of LRTR some of which are also operational.