NoobWannaLearn
New Member
- Joined
- Jun 3, 2022
- Messages
- 8,978
- Likes
- 29,244
I am just a noob man probably talking about wings being ready to put in jigs or somethingHey man just a question , what does wings loaded up for assembly mean?
I am just a noob man probably talking about wings being ready to put in jigs or somethingHey man just a question , what does wings loaded up for assembly mean?
Wings are ready for assembly.Hey man just a question , what does wings loaded up for assembly mean?
I heard he said mk2 ff in 2025 4th quarter
Yes if what he says is true about assembly then they are really going full speed manI heard he said mk2 ff in 2025 4th quarter
Yeah even many were stating that sriram sir was getting updated wrong but he was rightYes if what he says is true about assembly then they are really going full speed man
Nothing Substantial sold to them:Mi-17 Helicopters? Kornet-E(52-Systems+Missiles)?
What's the status of these engines and when can we see them in production
Some great finds (Someone plz download the vid before it gets taken down it's in some random channel and I am not on my PC)
HAL RUAVView attachment 247100
View attachment 247099
CATS WARRIOR
View attachment 247101View attachment 247102
IMRH With Armament PylonsView attachment 247103View attachment 247105
Engines (HTFE-25 and HTSE-1200)View attachment 247106View attachment 247107View attachment 247108View attachment 247109
Well what would you do with 41 Aesa units sitting in ur storage anyway it's just good business they they want their product's to be used if someone is buying themYeah even many were stating that sriram sir was getting updated wrong but he was right
Uttam will get it's place in 41st mk1a
Due to shitty Israelis
Status wasn't talked about in the video but for drones and warrior it should be ready in 2 years for production if Warrior TD by end of this year is correctWhat's the status of these engines and when can we see them in production
What is the problem here?
Even the tires aren't Indian it's getting out of hands now
yess sirr september-october 2025 is what he saidI heard he said mk2 ff in 2025 4th quarter
No one has problem with it the problem is calling it indegeniously designed and developed that's a scam just call it a jv we have 100s of those already here so just call it what it is and stop scamming in names of indegeniousWhat is the problem here?
Do you think an Indian Tire company is going to build a production line to make tires for one such vehicle?
P.S Indian companies are exporting tires for monster trucks and what not MRF produced tires for an aircraft if I am not wrong so Indian companies have no problem setting up production line for such tiresWhat is the problem here?
Do you think an Indian Tire company is going to build a production line to make tires for one such vehicle?
Please throw morality in trash bin!No one has problem with it the problem is calling it indegeniously designed and developed that's a scam just call it a jv we have 100s of those already here so just call it what it is and stop scamming in names of indegenious
such tyres are already available in the market bruv no need for production linesWhat is the problem here?
Do you think an Indian Tire company is going to build a production line to make tires for one such vehicle?
Not the same thing. MRF is making tires for Sukhoi it seems but that it is a very small use case, and they get a sure shot order from IAF.P.S Indian companies are exporting tires for monster trucks and what not MRF produced tires for an aircraft if I am not wrong so Indian companies have no problem setting up production line for such tires
One Intresting thing he said was being confident in Side by side work of both MK2 and AMCA so that will be intresting what speed we will see on AMCA the tenders have started going out for prototypeI heard he said mk2 ff in 2025 4th quarter