NoobWannaLearn
New Member
- Joined
- Jun 3, 2022
- Messages
- 8,978
- Likes
- 29,244
If it's make 1 category then it's 90% funded by the government right?
Yes...If it's make 1 category then it's 90% funded by the government right?
This is the one L&T is working on right?Yes...
I believe that's FICV.... DRDO is working on FRCVThis is the one L&T is working on right?
FRCV is basically a modular tank.This is the one L&T is working on right?
Nope...but they'll definitelyThis is the one L&T is working on right?
But that won't be considered make 1 category right?Nope...but they'll definitely
Remember a little Toyota by the name K9? L&T will jump into almost every competition from now on, be it FRCV or FICV or SHORADS with K9's hull and upper part from some other OEM.
Thank you do we have some timelines set for when will the prototype be out or somethingFRCV is basically a modular tank.
L&T one is FICV, basically a troop carrier.
Bruh...But that won't be considered make 1 category right?
Why?But that won't be considered make 1 category right?
I thought make 1 was to produce something inhouse with 90% gov funding not to importWhy?
Is that really Arjun Mk-2? I thought that the Mk-2 was still in development under the FMBT programme with the Army procuring the Mk-1A as a stop gap.
Hes wrong, look at the dimentions. 1.584 m tall, this is too small.
MK-1A project used to be called MK-2Is that really Arjun Mk-2? I thought that the Mk-2 was still in development under the FMBT programme with the Army procuring the Mk-1A as a stop gap.
AFAIK L&T actually can make the chassis here, there was something about ToT.I thought make 1 was to produce something inhouse with 90% gov funding not to import
Then what is it?Hes wrong, look at the dimentions. 1.584 m tall, this is too small.
Proto ,look at the size of landing gearHes wrong, look at the dimentions. 1.584 m tall, this is too small.
If I had to hazard a guess, it could be a surveillance drone. Too hard to guess from the pic.Then what is it?