This is the source https://www.magzter.com/stories/News/THE-WEEK/ENTER-THE-AMCAYou weren't rude
But I seriously did not know if there such news came that amca will be rolling out in 2026
That is why asked
This is the source https://www.magzter.com/stories/News/THE-WEEK/ENTER-THE-AMCAYou weren't rude
But I seriously did not know if there such news came that amca will be rolling out in 2026
That is why asked
WE DONT HAVE WIND TUNNELS
Not all , and those tests were conducted when ??WE DONT HAVE WIND TUNNELS
AND WE ARE DEVELOPING 3 JETs simultaneously
We do.WE DONT HAVE WIND TUNNELS
AND WE ARE DEVELOPING 3 JETs simultaneously
We have ..... India is the third country after the United States and Russia to have such a large facility in terms of size and operating capability.WE DONT HAVE WIND TUNNELS
AND WE ARE DEVELOPING 3 JETs simultaneously
He said once upon a time....So may be a long backNot all , and those tests were conducted when ??
At the same time ..The design might be changed ...From the time it was tested abroadHe said once upon a time....So may be a long back
ImoThe week is the source
It's obvious it won't take 3 yrs for prototype construction.Imo
He might've said that after CCS approval normaly it takes 4 years to rollout had drdo not done some work using it's own fund from 2022 it would've taken 4 years Ie. 2026 to rollout
But it did work using it's own fund so 2024 is the rollout
Right this is why we have already completed pdr and even cdr will be done in this yearIt's obvious it won't take 3 yrs for prototype construction.
But bro even @Arihant Roy is believing the article so it could be 2026Right this is why we have already completed pdr and even cdr will be done in this year
In Turkey's case
that before the end of this year, system functionality review (SFR) and system requirements review (SRR) will be completed. With that, PDR will come to an end. The program will be in the stage of initial roll-out next year(which most likely will be delayed)in March with engines fitted and working.
After the aircraft rolls out of hangar under it’s own power in March 2023, critical design review (CDR) activities will be started in 2024
So what they will do in 2024
We are already doing
He can have his opinionBut bro even @Arihant Roy is believing the article so it could be 2026
Me happy! Have been tracking this for a decade now. Now in the hands of armes forces, the way lca is being owned by iaf gives me hopes.Finally
SAAW and/or Helina ?With what?
Those 1 kg bombs, can be dropped like a cluster bombs?SAAW and/or Helina ?
SAAW is 125kg with 100km glide. Pretty good imo for loitering and taking out strategic targets.Those 1 kg bombs, can be dropped like a cluster bombs?