It’s somewhat similar visually to the ATR/C295 design. They got to fit the landing gear somewhere.
nose seems quite different, there is a visible thud present in saras mk2It’s somewhat similar visually to the ATR/C295 design. They got to fit the landing gear somewhere.
View attachment 137597View attachment 137598
Nitpick but the M777 deal was signed by NDA 2.0 in Nov-16.By buying m777, congress removed a curse from IA, a curse brought by congress in first place.
Also able achieve 3 goals with one deal and every ones happy.
No further order due to rise in price and now more options are available. I don't know current production status.
Ya'll Nibbiars who is defending NDA here.Nitpick but the M777 deal was signed by NDA 2.0 in Nov-16.
I know landing gears need their separate place but still it looks damn uglyIt’s somewhat similar visually to the ATR/C295 design. They got to fit the landing gear somewhere.
View attachment 137597View attachment 137598
Ugly? That's ECS Chamber - Environmental Control System. Absolutely vital for air supply, CO2 removal, temperature control and cabin pressurization for the crew and passengers. Additional functions like cooling of avionics, smoke detection, and fire suppression are also present in modern ECS. Better the ECS, the more comfortable the journey is, for longer distances and at higher altitudes.
Do you have the link for the video!?I have screen grabbed these pictures from an NAL video.
Saras MK2
View attachment 137531View attachment 137535View attachment 137537View attachment 137542View attachment 137543View attachment 137533View attachment 137545
View attachment 137544
The delay due to cost issue. M777 chosen by upa, and concluded by NDA. All major weapons purchase from USA concluded by nda were intilised/started by upa which also include military agreements. Also, when upa came to power, usa was India's no.1 enemy/threat and when they left office, usa is one of India's best friend.Nitpick but the M777 deal was signed by NDA 2.0 in Nov-16.
The deal for M777 howitzers under the FMS route has been in process since 2008 and has seen several ups and downs, including the possibility of being scrapped. The contract was revived last year by the Modi government under a new deal that included a Make in India component.The delay due to cost issue. M777 chosen by upa, and concluded by NDA. All major weapons purchase from USA concluded by nda were intilised/started by upa which also include military agreements. Also, when upa came to power, usa was India's no.1 enemy/threat and when they left office, usa is one of India's best friend.
For a moment I thought this was a political thread and you sounded like Akhilesh Bhai.The United States has finalised a proposal to sell M777 ultra-light howitzers, a towed 155 mm artillery piece, to India under a direct government-to-government deal, with Washington expected to send a formal ‘Letter of Acceptance’ this week.
According to Indian media reports, the ‘Letter of Acceptance’, which is the final step from the US in a Foreign Military Sales (FMS) contract like this, has been finalised and is to be presented to South Block this week. This would be followed by an acceptance from the Indian side and subsequently transfer of an advance after which deliveries of 145 guns would commence.
At least two M777 light howitzers are expected to be delivered to India this year as part of the deal so that the army can generate its ‘range tables’ – a calibration for the various types of Indian made ammunition that the guns would fire once in service.
The deal for M777 howitzers under the FMS route has been in process since 2008 and has seen several ups and downs, including the possibility of being scrapped. The contract was revived last year by the Modi government under a new deal that included a Make in India component.
The light artillery gun deal, worth over $700 million, will also involve a significant ‘Make in India’ component with Mahindra expected to bag a major share of the work contract.
Nuclear deal had a big positive impact on US-India relationship.The deal for M777 howitzers under the FMS route has been in process since 2008 and has seen several ups and downs, including the possibility of being scrapped. The contract was revived last year by the Modi government under a new deal that included a Make in India component.
Source:
For a moment I thought this was a political thread and you sounded like Akhilesh Bhai.
The Light Howitzer deal was initiated in 2008. MMRCA tender in 2007.
US India best friends!!!!! It was the 'pivot to Asia' which brings them closer to India, not some heart-felt friendship. Rest of the bonhomie was just business to sell nuclear reactors.
Ya'll Nibbiars military has needs for the Sara MK 2 and could replace the droning Do 228. And plus the work or the RTA is progessing.Why develop another 19 seater? Saras MK2 should be atleast 40-50 seater aircraft in category of ATR42. We should try to buy designs of either ATR42 or Dornier 328 etc
Saras Mk. 2 will do what HAL Dhruv cannot accomplish. Will also come with many counter measures against missile threats. A single propeller getting damaged can still keep the passengers safe.Why develop another 19 seater? Saras MK2 should be atleast 40-50 seater aircraft in category of ATR42. We should try to buy designs of either ATR42 or Dornier 328 etc
Fire detection and extingushing systsem is separate and not related to ECS.Ugly? That's ECS Chamber - Environmental Control System. Absolutely vital for air supply, CO2 removal, temperature control and cabin pressurization for the crew and passengers. Additional functions like cooling of avionics, smoke detection, and fire suppression are also present in modern ECS. Better the ECS, the more comfortable the journey is, for longer distances and at higher altitudes.
Also, the rear landing gears at the extreme ends of that ECS Pod gives Saras Mk. 2 better take off and landing stability even during strong winds or bad runways.
what engine are they planning ?