BlackViking
New Member
- Joined
- Feb 20, 2019
- Messages
- 1,221
- Likes
- 4,595
Go ahead not complete.Ya'll Nibbiars even The Mleechas takes a 7 years to complete a aircraft carrier. Then how possible within a half decade?.
Go ahead not complete.Ya'll Nibbiars even The Mleechas takes a 7 years to complete a aircraft carrier. Then how possible within a half decade?.
Ek zero kam haiYa'll Nibbiars The Mleechas Type 003 Class aircraft carrier construction started in 2015 and still will take atleats two more yeras. That 8 years to complete a 85,00 tons Aircraft carrier.
Why is it called long range if the range is medium...weird drdo logicSome update.
1. Electrical heavy weight torpedo,
a new generation torpedo that can
be launched from both ships and
submarines for anti-submarine warfare is under development.
2. Jalastra, a medium weight torpedo capable of being launched from naval platforms, is also under development.
3. DRDO is developing a universal
vertical launcher capable of launching
all the indigenous missiles onboard
Indian Naval Ships.
4. DRDO is in advanced stage of
development of submarine periscope.
Submarine hoistable masts for
periscope, radar and communication
antennae are also being developed.
5. The long range anti-ship missile
is a land launched medium-range antiship missile, which will be able to
target naval surface targets.
6. Astra Mk-2 with two-pulse
propulsion is being developed to
further enhance the kill zone of Astra
Mk-1 missile. Astra Mk-2 will achieve
a longer kill range, one of the highest
amongst all air-to-air beyond visual
range missiles available across the
world thus far. To further increase
the ‘kill range’ to nearly double of the
Mk-2 and ensure the wider ‘no escape
zone’, DRDO has successfully tested
and validated the solid fuel ducted
ramjet propulsion technology.
7. The New Generation Main Battle
Tank (NG-MBT) is envisaged as the
futuristic MBT of the Indian Army.
It will be a medium tank powered by
1500 HP engine and armed with a
125 mm smoothbore gun. Allelectric
turret drive, explosive reactive armour
and active protection system are being
developed for the new generation of
tanks.
the construction phase of this project started in 2017...normally a six-year Production Cycle is listed in the contract provision for such tonnage of combat vessel. it might be delayed by a year due to some unexpected design change. but it seems the shipyard is still aiming at that important time node in 2023Ya'll Nibbiars The Mleechas Type 003 Class aircraft carrier construction started in 2015 and still will take atleats two more yeras. That 8 years to complete a 85,00 tons Aircraft carrier.
LRMFR.Is there any DRDO program to replace the MF STAR radar for future ships? And how come INS Vikrant lacks the typical MF STAR mast design?
Like this
Just go for rubber tracks instead of all metal here.7. The New Generation Main Battle
Tank (NG-MBT) is envisaged as the
futuristic MBT of the Indian Army.
It will be a medium tank powered by
1500 HP engine and armed with a
125 mm smoothbore gun. Allelectric
turret drive, explosive reactive armour
and active protection system are being
developed for the new generation of
tanks.
Its good that DRDO is sticking to 1500 HP engine instead of going for 2000HP engine under development.
Going by IN trend, IMO, the displacement should be anywhere between 50 to 55k ton (!).With what Displacement?
Within half a decade how ?
I said approval, not the ship itself.Ya'll Nibbiars a follow on IAC 1 design is possible within 7 to 8 years considering delays in securing equipments. But within a half decade how?.
So there is also 2000 hp engine under development?Its good that DRDO is sticking to 1500 HP engine instead of going for 2000HP engine under development.
Its not DRDO logic, but general logic.Why is it called long range if the range is medium...weird drdo logic
Yeap.So there is also 2000 hp engine under development?
That’s what I meant didn’t know what it was calledLRMFR.
On second part, why you want a mast mounted four faced antenna RADAR when you could have a Island mounted 6 faced antenna RADAR?
Didn’t someone say that the 1500hp engine is a derated 2000hp engine?Yeap.
But not sure whether its an entirely new engine or uprated existing 1500 one.
My bad, not 2000 hp, but 1800 hp engine.So there is also 2000 hp engine under development?
NO ,HNS is not being used on arjun tanks instead more powerful hardened steel armours like High Hardend DMR-1700 steel and medium Hardend "SPADE" steel armour plates are being used on arjun mk-1 and mk1A tanks which are more capable than HNS and RHA steel . Ref-1completely improved MK1A with all its attachments & HNS = 62 tons
Did DRDO developed a 2000 hp engine to downrate it to 1500 hp?Didn’t someone say that the 1500hp engine is a derated 2000hp engine?