Arjun Mk1A
Senior Member
- Joined
- Mar 6, 2022
- Messages
- 2,839
- Likes
- 16,100
Looks like DSI intake is present.
Looks like DSI intake is present.
This is the proposed timeline. If all goes according to plan than AMCA's manufacturing is to start by 2028.AMCA to be ready for 5 more years....i.e by 2027
DSI intake and targeting pod was always present in aero india modelsLooks like DSI intake is present.
That 2027 timeline is for 1st flight not for series productionThis is the proposed timeline. If all goes according to plan than AMCA's manufacturing is to start by 2028.
I too think AMCA Mk-1 will enter service only after 2035....I won't be surprised if it is pushed to 2040DSI intake and targeting pod was always present in aero india models
View attachment 165534 View attachment 165536
Methinks they are trying to go with tried and tested stuff. Trying to go for DAS and EOTS this quick is stupid. But i thought they would go for das and eots after developing irst , dcmaws for mwf;targeting pod is yet to come iirc
Wouldnt be a problem honestly if chinese dont field j20's in the tibet front and if j35 didnt get potentially commisioned before type -003 which means start of exports and pakis get a 5th gen before us but yeah this is a bummer.
2035 for production.
2 squadrons of the above mk1 amca(2x18 = 36)
If we assume 8 per year starting from 2037,
2036-4
2037-8
2038-8
2039-8
2040-8
2040+ is when a proper 5th gen in all aspects(amca mk2) is gonna get inducted.
Targeting pod can be removed in stealth mode, but yeah ,It's more like a KF-21 but with IWBWtf!
An irst and targeting pod
This is suicidal
Even j-20 is more stealthy than this
That to by 2027
We are running 3 decades back
2024-25 is suppose to be timeline for 1st flight .That 2027 timeline is for 1st flight not for series production
Is the guy on the elephant in your profile picture holding a gun ?If AMCA is going to use IRST pod similar to Tejas Mk2. Then why are they developing this one.
The previous iteration of AMCA did feature a pod similar to what we see in the video.
Maybe the future prototypes will feature an EOTS pod. Once we have a system mature enough to be installed in the AMCA.
Yes sirIs the guy on the elephant in your profile picture holding a gun ?
Abhi ro de fir... AMCA Mk1 was always supposed to have those. Stealthy EOTS, internal pods abhi feasible nahi, that's why Mk2 ko seperate kiya gya.Iss video mey AMCA pey IRST aur targetting pod dekh kar thoda darr lagg raha hai, pata chala apna AMCA mk1 KF-21 jaisa nikla toh mey honestly roh dunga
2035 is the proposed timeline for AMCA Mk. 2I too think AMCA Mk-1 will enter service only after 2035....I won't be surprised if it is pushed to 2040
Abhi ro de fir... AMCA Mk1 was always supposed to have those. Stealthy EOTS, internal pods abhi feasible nahi, that's why Mk2 ko seperate kiya gya.
2035 is the proposed timeline for AMCA Mk. 2
HAL CMD(November 2021)The AMCA will be a next generation game changer with highly stealth features, 360 degree Enhanced Situation Awareness, internal weapon carriage etc. The LCA Mk2 aircraft is slated for production by 2027-2028 and AMCA by mid-2035.
HAL CMD(Jan 2021)Mr. Madhavan said the prototype of the aircraft is likely to be ready by 2026 and its production could start by 2030. He added that the Defence Research and Development Organisation (DRDO) was working on the timelines for the project.
Former air chief rks bhaduria(oct 2020)Addressing a press conference ahead of Air Force Day on October 8, Mr Bhadauria also said the Defence Research and Development Organisation has set a target of 2027 to roll out an advanced medium combat aircraft (AMCA).
Girish Deodhare head of ADA.(jan 2021)Deodhare presented an incremental development plan for indigenous manned combat aircraft, in which the current Tejas Mark 1 would be followed by the improved Mark 1A, the AMCA Mark 1, the navy’s “twin engine deck-based fighter” (TEDBF) and finally the AMCA Mark 2 by 2035.
Author's own opinion based on a third party(safran)If a deal is signed, Safran said that it could potentially take until the end of the decade for the new engine to be developed.
afaik tejas mk2 is getting improved dcmaws(360 deg ir sensors) so it is not possible for amca to not have eodas , eots(integrated a2g targeting pod) can be doubtful but not eodas(360 deg ir sensors for a2a)Iss video mey AMCA pey IRST aur targetting pod dekh kar thoda darr lagg raha hai, pata chala apna AMCA mk1 KF-21 jaisa nikla toh mey honestly roh dunga
f-35 eots as well as das does the work of a normal irst + FLIR(targeting pod) + dcmaws and even more stuff.The former and the latter might be doing more work as well but i cant be bothered to look it up. DRDO has to master the latter 3 before it makes the former two.Meaning
Digital Engineering.
Thats the old one ....see the latest2035 is the proposed timeline for AMCA Mk. 2
eodas is name given to irst system of f35(it has 6 sensors spread across the body)Meaning