Always shown with a twin-seater LCA TejasMAX version, but MWF/Teddy/AMCA would likely inherit too.The CATS Program is for MK2 right?
Always shown with a twin-seater LCA TejasMAX version, but MWF/Teddy/AMCA would likely inherit too.The CATS Program is for MK2 right?
So some LCAs will be converted for the MAX upgrade right?Always shown with a twin-seater TejasMAX version.
Can't say. Maybe the trainers will themselves be LIFT jets where a WSO will operate that stuff. You'll need twin-seater to be CATS mothership (I believe).So some LCAs will be converted for the MAX upgrade right?
Ya'll Nibbiars post the link.Tender out of large area display of mwf.
Also tender out for mwf intake model
DO YOU THINK DASSAULT ARE SO NAIVE ,THEY WUD RELEASE A CLASSIFIED INFONo such information encountered yet. Available data states 838 and limit factor was space constraint.
Hope that was curiosity. U have arms range, target detection, seeker info, even tr modules informed. How much they vary from classified data is anybody's guess. I compare with data available not what I assume or feel.DO YOU THINK DASSAULT ARE SO NAIVE ,THEY WUD RELEASE A CLASSIFIED INFO
MK2 and TEDBF will have same Mission and Display Software.
Yes, prototype construction has started.Has prototype work began for MK2?
Yup..as per amit production for subssystems like wings canrds fuselage intakes etc has already going on....proto rollout is predicted in late 2022..Has prototype work began for MK2?
Has prototype work began for MK2?
Even AMCA Prototype construction has started and 4 components have already been manufactured as per Dr Girish Deodhare, Director of ADA.Yes, prototype construction has started.
What are thoseEven AMCA Prototype construction has started and 4 components have already been manufactured as per Dr Girish Deodhare, Director of ADA.
Ya'll Nibbiars Weapons Bays, Cockpit, structure components, Carbon material's. The Radar, Intergated sensor's, RAM, avionics, Senser fusion, Fly by optics are under development.What are those
Not disclosed by him yet, but he said Prototype Construction has started, and will be ready in 36 months by August 2024 and will fly in Aero India 2025 as per schedule.What are those
This is of LCA Max.. You can see the drones on the screen.Cockpit of LCA Tejas-AF MK2.
View attachment 84862
Thread starter | Similar threads | Forum | Replies | Date |
---|---|---|---|---|
ADA Tejas Mark-II/Medium Weight Fighter | Knowledge Repository | 6 | ||
AERO INDIA 2021 | Science and Technology | 308 | ||
ADA Tejas (LCA) News and Discussions | Indian Air Force | 17457 | ||
P | ADA DRDO and HAL Delays a threat to National Security | Internal Security | 20 |