Advaidhya Tiwari
New Member
- Joined
- Aug 2, 2018
- Messages
- 1,579
- Likes
- 1,443
Don't change the topic. You were trying to say that Tejas Mk1A and MK2 would take lot of time as design testing is lengthy. Whereas I am saying that more than physical design, it is the Integration of software that takes the most amount of time.I think (as usual) you've lost track of the subject matter of the conversation. Reread the thread and comment again if u wish.
Hence with the software integration already mastered by India, the time for development will be cut down