Don't worry some fanboy will always dream of F-414 on MK1A.Cannot see how Mk.1A can come so soon, 21st SP will be delivered in mid-2019,the Mk.1A hasn't even taken to the skies as of yet. I understand that Mk.1A is mostly Mk.1 FOC with some addtional features but I'd be surprised if the validation and certification process could be so compressed and the fact is neither the AESA radar nor SPJ has been selected, it takes at least 2-3 years to get these delivered. Something is going on because HAL should've selected the AESA and SPJ by now.
+ F414 for MK.1/A isn't going to happen, that will take a long time also and so far only 6 414s have been ordered and (2-4 have already been sent to India for MK.2).
MK1A is not going to be any different than MK1 in terms of construction. Both are same in outer body. Only subsystems have been added like IFR probe, EW and a few upgrades.Don't worry some fanboy will always dream of F-414 on MK1A.
I think HAL's only contribution to 1A will be the changes in the manufacturing method and reducing the components & screws in the jet to make it true modular design and in turn reducing the current period of production of single jet.
It will in turn will help in reducing the weight of the MK1A by some kgs, thats the only gain otherwise 1A is FOC with AESA & IRF probe.
If we only start aggressive marketing of existing products a player like Turkey won't be visible even in our rear-view mirror.What? Turkey is exporting more than 1 billion usd weapons. We r no where in the list. Last year Turkey won contract for upgrading Pakistan submarines. Can we even refurbish our submarines on own? They hav pretty succesfull avionics products like aselpod, drones etc. We r still behind turkeý in this areas.
Such big mouth scientists should be held accountable for missed deadlines.
.............................................................................................
Design of LCA Tejas’ next version almost done, AESA Radar next month
March 26, 2018
By: Tribune News Service
Talking about the next version of the Tejas, called ‘Mark1-A’, Dr Christopher said: “The design other than the AESA radar and the jammer pod is complete.” Hindustan Aeronautics Limited is looking to import the AESA radar even as DRDO made a radar that will be tested next month.
The IAF is looking at 83 ‘Mark1-A’, with 59 improvements over the existing Tejas.
The Indian Air Force has projected a need for 324 fighter jets over 15 years and has officially indicated that it needs the ‘Tejas Mark 2’ (medium combat aircraft). It will carry a more powerful engine and weigh almost 20 per cent heavier than Tejas.
http://www.defencenews.in/article/D...ion-almost-done,-AESA-Radar-next-month-547209
Don't count the chicken before they hatched.
Because those are the same ADA has officially planned for Tejas in different mission configs and were part of the flight testing for IOC and FOC. They even tested Tejas in the same config at Leh, to prove that it could be used in that config at that location if the need arise.how do u know this pics are test mission and strike mission and iaf going to use same in war too?? there is thing called flexibility
MK1A is = FOC + AESA, new EW and some maintenance improvements.I don't why people feed these kinds of news. The order for 20 FOC was given way back and it's not going to get converted to anything else.
They may bring certain features from Mk1a but certainly not the full set.
Yes scientist should be held accountable, but in this case, he is talking about the start of MK1A production, which should include an off the shelf AESA, which however is not selected yet.Such big mouth scientists should be held accountable for missed deadlines.
Link to the full episode plz.WION/DNA coverage on LCA
T Suvarna Rao
They say design is complete and only jammer pod and Radar is left. HAL will buy off the shelf radar and with performance comparison with Drdo radar, it will choose the best. That means mk1a is well off for 2 to 3 years.Yes scientist should be held accountable, but in this case, he is talking about the start of MK1A production, which should include an off the shelf AESA, which however is not selected yet.
So he confirms that HAL wants to start the production as soon as possible, because they can't afford to stop production, but that the off the shelf AESA was not integrated and tested yet and work for the MK1A upgrade remains.
Cannon and refuelling aerial test can also rest in peace.They say design is complete and only jammer pod and Radar is left. HAL will buy off the shelf radar and with performance comparison with Drdo radar, it will choose the best. That means mk1a is well off for 2 to 3 years.
Sent from my Aqua Ace II using Tapatalk
Good or not, the radar will be UTTAM. If it is not upto the mark, feedback will be given to correct the errors.They say design is complete and only jammer pod and Radar is left. HAL will buy off the shelf radar and with performance comparison with Drdo radar, it will choose the best. That means mk1a is well off for 2 to 3 years.
Sent from my Aqua Ace II using Tapatalk
Uttam in the next batch of mk1a, initial could fly with off the shelf radars.Good or not, the radar will be UTTAM. If it is not upto the mark, feedback will be given to correct the errors.
sp 10 in assembly lineWION/DNA coverage on LCA
T Suvarna Rao
Thread starter | Similar threads | Forum | Replies | Date |
---|---|---|---|---|
AERO INDIA 2021 | Science and Technology | 308 | ||
ADA Tejas Mark-II/Medium Weight Fighter | Knowledge Repository | 6 | ||
ADA Tejas Mark-II/Medium Weight Fighter | Indian Air Force | 8939 | ||
P | ADA DRDO and HAL Delays a threat to National Security | Internal Security | 20 |