IDRW can not be treated as a credible source.
Can't say about the article. But the sketch is something which has been on board for long. I think in this very thread I had once said that I would not be surprised to see AMCA to be a twin engine Tejas with advance feature. Although as per new design concept it has undergone a tremendous change, but this is not the only time when I have seen this sketch or discussed it.IDRW can not be treated as a credible source.
Don't take it seriously.
If it really was considered and later rejected, the designers would be the ones to blame. IAF has every right to reject a plane without a tail.Can't say about the article. But the sketch is something which has been on board for long. I think in this very thread I had once said that I would not be surprised to see AMCA to be a twin engine Tejas with advance feature. Although as per new design concept it has undergone a tremendous change, but this is not the only time when I have seen this sketch or discussed it.
You mean Tail Fin???If it really was considered and later rejected, the designers would be the ones to blame. IAF has every right to reject a plane without a tail.
LA-5006 (sp-6) is almost ready to take flight while LA-5005 (sp-5) is about 10-12 days behind sp-6.Has SP5/6 flown ? any news ? eagerly waiting.
What are the Imported components of this plane?
40% by value(approx) and 25% of components(by number) are imported.Not much different from Su-30 MKI,except that we hold IP for Tejas unlike Su-30 MKIWhat are the Imported components of this plane?
Good to know.LA-5006 (sp-6) is almost ready to take flight while LA-5005 (sp-5) is about 10-12 days behind sp-6.
One of my friend working on Tejas Production line as an Electronics integrator.Good to know.
What is the source of this information ?
40% by value(approx) and 25% of components(by number) are imported.Not much different from Su-30 MKI,except that we hold IP for Tejas unlike Su-30 MKI
What about Gun integration and a2a Fuel probe tests? Any chance you got that info?One of my friend working on Tejas Production line as an Electronics integrator.
Gsh-23 cannon integration done and tested.What about Gun integration and a2a Fuel probe tests? Any chance you got that info?
Thread starter | Similar threads | Forum | Replies | Date |
---|---|---|---|---|
AERO INDIA 2021 | Science and Technology | 308 | ||
ADA Tejas Mark-II/Medium Weight Fighter | Knowledge Repository | 6 | ||
ADA Tejas Mark-II/Medium Weight Fighter | Indian Air Force | 8939 | ||
P | ADA DRDO and HAL Delays a threat to National Security | Internal Security | 20 |