Source of these images please ?
------------------------------
Source of these images please ?
Whoaa!!
View attachment 14122
I guess that Bangalore based private firm Centcom Electronics also had developed an AESA Radar. Any update over that?
Don't cancel anything, imported AESA are coming to ensure MK.1A is not delayed,Uttam won't be ready before 2019 (when Mk.1A is to be in production). Surely later batches of the Mk.1A can/will have the Uttam though, it is a pretty simple plug and play option.We should immediately cancel the order for Israeli AESA and we should choose our own indigenous Uttam on Tejas Mk 1-A. Even though uttam is heavier than its counterpart we should choose it as our indigenous capabilities would improve and most of all we would get bragging rights.
From IdrwDon't cancel anything, imported AESA are coming to ensure MK.1A is not delayed,Uttam won't be ready before 2019 (when Mk.1A is to be in production). Surely later batches of the Mk.1A can/will have the Uttam though, it is a pretty simple plug and play option.
From Idrw
It said that Uttam aesa is ready.
It's ready for FLIGHT TESTING, not ready to be operational on frontline fighters. 2-3 years of flight testing (providing testing doesn't expose fundamental design issues) is required at least.From Idrw
It said that Uttam aesa is ready.
Irdw is not an authentic source.From Idrw
It said that Uttam aesa is ready.
Tell that to the OP.Irdw is not an authentic source.
They are some defense enthusiasts like us
As I had mentioned earlier, updates from LCA-Tejas FB page:
With 3rd line coming, expect production rate 16+ for sure.
IAF has ordered 123 LCAs only....Just forgive my ignorance if this was asked before .. But don t you think 8 ACs are year is not way to low for a country which is trying to project itself as one of the super powers and also trying to indigenous its Aircrafts ..How much can HAL outsource to private players to speed up the production or delivery rate .. What will be the challenges to produce lets say 40 Tejas an year ???? Just wanted to know from someone who has more enlightenment about the Tejas program ..
16 - (5+3+8)By the time of FOC, production facilities will come online and they'll be able to produce 19 (8+8+3) LCAs a year.
IAF has ordered 123 LCAs only....
Production depends on the no of aircrafts on order......
Same HAL produces over 30 Dhruvs/ yr(increased to 36 but not sure)... Do you know the reason.... Over 600 Dhruvs(all variants) on order and 231 built as of Feb 2017...
A quick qn....
Let's say HAL decides to produce 40 LCA a year...In 3 yrs order is fulfilled... Then what!!??
Close the factory.....
When HAL start production and delivering AC...
IAF also starts training pilots at the same pace...
When you ask for 40 LCA/yr...How do you plan to get 40 pilots... Don't think of retiring MiG's it is more complicated than you can understand...
It is not that HAL produces ACs and they rust in the IAF bunkers...
HAL production, IAF upgrading infra and pilot training goes hand in hand...
Few folks come up with stupid logics that why can't we simply throw all the MIGs and use its resources on LCA..
It is not as simple as someone thinks...
Sure LCA might use same weapons and might be able to use same hangers...But there it ends ....
What about stocking up spares...
What about training technicians
What about pilot transition (it is not as easy of changing your bikes "Hero Passion" to "Bajaj Pulsar")
Things are going as per plan WRT to LCA production, setting up Training facilities and FOC(not sure of FOC part, but hope it goes as per plan)
By the time of FOC, production facilities will come online and they'll be able to produce 19 (8+8+3) LCAs a year.
By the way my brother in law used to work with our so called On time delivery HVF in Arjun MBT I production and later part he worked with another project too in the Defence manufacturing..he expressed the same feeling .. drag the job as long as you want and don t push much into unknown territories save your job and get retired ..
All i wanted to know was what will be our maximum production level for Tejas with HAL .. i didnt criticise the product neither i am blaming the production .. All i wanted to know was are we having a vision and then does our current mission is in line with that vision..
Tejas FOC points on the verge of completion: ADA Chief
Bengaluru: Cmde Cadaba Devnath Balaji (Retd), the Director of Aeronautical Development Agency (ADA), who is all set to hang up his boots on March 31 said that all pending test points towards achieving Final Operational Clearance (FOC) of Tejas were on the verge of completion.
Speaking to Mathrubhumi, Cmde Balaji (Retd) said the aircraft build standard to FOC configuration is available and Hindustan Aeronautics Limited (HAL) will proceed to build the next 20, after completing first Series Production platforms (20).
“The flight testing of Tejas with air-to-air-refuelling probe is in progress. The performance evaluation of radar has been encouraging. The air-to-ground weapon work has been largely completed. Accuracy improvements in terms of software update is currently on,” Cmde Balaji (Retd) said.
He said the firing of Beyond Visual Range (BVR) missile with radar is being planned shortly, while the gun firing is now fixed for the second quarter of 2017. He added that the aircraft envelope clearance for Squadron service has been progressively released, even for first set of 20 aircraft.
Giving an update on Tejas Mk2, Cmde Balaji (Retd) the aircraft will be configured for a higher thrust engine, AESA Radar, internal EW suite, OBOGS, larger internal fuel capacity, larger payload capability and better performance.
Navy rejecting NLCA hurtful
On LCA Navy Mk2, he said the concept design for an optimised deck-based aircraft, has been completed and detail design is in progress.
ALSO READ: ADA Chief to teach underprivileged kids, bat for unsung heroes after retirement
When asked about any regrets he had as he prepares to hand over the baton of ADA, Cmde Balaji (Retd) said: “While significant lead up activities towards arrested recovery has been done (NLCA), the actual arrested recovery is yet to take place. I would have liked to have seen it happen in my tenure, but got delayed due to a few failures of aggregates. Further, the apparent rejection by the Indian Navy is hurtful.”
He said while the Navy has operated carrier borne aircraft for decades, it is the first time to develop our own aircraft.
SBTF an asset to watch for the future
“From personal experience I can confidently say that operating a carrier borne aircraft gives one level of knowledge, but developing it from scratch is an entirely different ball game. LCA Navy Mk1 has provided a stepping stone for developing an optimised version specifically designed for Deck based operation in terms of LCA Navy Mk2. This will provide a design and capability that the Navy may be able to consider favourably for exploitation. In addition, this will provide the necessary skills and capabilities for the development of twin-engined, 5th generation deck-based aircraft,” he elaborated.
ALSO READ: Hunt on for next ADA boss with Tejas FOC at striking distance
Cmde Balaji (Retd) said the Shore Based Test Facility (SBTF) at Goa will be an asset to watch for the future.
“This facility has been built keeping the requirements of a medium weight category aircraft to operate. Navy has been using this facility extensively for pilot training of MiG 29K, prior to operating on INS Vikramaditya,” he added.
http://english.mathrubhumi.com/news...aji-aeronautical-development-agency-1.1832969
Thread starter | Similar threads | Forum | Replies | Date |
---|---|---|---|---|
AERO INDIA 2021 | Science and Technology | 308 | ||
ADA Tejas Mark-II/Medium Weight Fighter | Knowledge Repository | 6 | ||
ADA Tejas Mark-II/Medium Weight Fighter | Indian Air Force | 8939 | ||
P | ADA DRDO and HAL Delays a threat to National Security | Internal Security | 20 |