Ofcouse when you tell too many lies too fast you end up contradicting yourself,
"
http://trishul-trident.blogspot.in/2013/10/clearing-mist-on-airborne-ew-suites.html"
"The integrated EW suite (shown below) for the Tejas Mk1 MRCA as envisaged by the DRDO’s Aeronautical Development Agency (ADA) and designed by the DRDO’s Defence Avionics Research Establishment (DARE).
This suite, however, remains unproven, although it has been flight-tested on an HS-748 Avro flying testbed by the DRDO’s Centre for Airborne Systems (CABS) since 2007.
To certify this EW suite on the Tejas Mk1 MRCA, at least 40 additional test-flights on a PV-1 flying testbed will be required, which in turn will further delay the Tejas Mk1’s operational flight certification by at least 18 months.
Making matters further complicated is the sub-optimal performance of the DARE-developed RWR-118 radar warning receiver (see below)—a fact which forced the Indian Air Force (IAF) to reject it for the MiG-29UPG upgrade programme."
Here he clearly says that 40 additional test flights are needed to certify this "integrated EW suit on tejas mk1" PV-1 needs to fly 40 additional test flights , which is presently being done!!!
http://trishul-trident.blogspot.in/2015/06/aero-india-2015-show-report-1.html
""To SPANKY’s BLOG: LoLz! All it takes is 1 TV anchor to become a sucker & treat a PTI news-report as sacrosanct & then all the subsequent disinformation goes viral! As for the Tejas Mk1, its design was frozen the day metal-cutting began for the first SP-series aircraft. Therefore, none of the 40 Tejas Mk1s can accommodate any internal modifications or enhancements. What is therefore happening is that ADA & HAL are using only one PV-series prototype to flight-test various integrated avionics suites that are destined for installation on the Tejas Mk2. These include the navigation-and-attack system suite & the integrated EW/self-protection suite."
On OCtober 22, 2013 this clown has posted that the internal EW suit tested on PV1 will delay the FOC of tejas mk1 by 18 months!!!
On JUne 4 2015 ,he says that internal ew suit being tested on PV-1 is meant for tejas mk2!!!
But in this pearls of wisdom for one of his buffoons(thats what he calls people of india) he says that internal EW suit is being tested only for tejas mk2 and not mk1!!!!
So please educate all of us buffoons about which of the buffoonery you are posting is true Mr Guptha?
Also enlighten us all whether ADA has provided enough space and cooling requirements for this internal EW suit developed for Tejas mk1(as per your own words) when metal was cut for 40 tejas mk1 SP versions!!!
"The IAF’s MiG-29UPGs, in fact, have the IAF’s most advanced internally-mounted integrated EW suite, which includes Elettronica of Italy’s ELT-568 AESA-based jamming system (see below), which will also go on board the yet-to-be-upgraded Su-30MKIs."
ALso please enlighten us all whether Russians provided bulk head redesign provisions and cooling requirements for the "Elettronica of Italy’s ELT-568 AESA-based jamming system" Mig-29 upgrade when they cut the metal for them a couple of decades back?
Any buffoon will say they certainly could not have anticipated them in the 1980s when we bought them.
So how did IAF which upgraded these mig-29s with all the itallian stuff can no upgrade 40 tejas mk1s with DARE produced internal Ew suits that were exactly meant for them from day one?
"Only after this does the production run for SP-series gets underway at an accelerated pace. In case of Tejas Mk1, elementary common-sense has taken flight from the decision-makers of ADA & that’s why one is witnessing the shameful spectacle of only LSP-7 & LSP-8 being equipped with operational-standard avionics, instruments & accessories—"
If everything should have been built on PVs themselves then what is the purpose of LSPs? Whose common sense has taken a flight?
No wonder most of Indians who read such absurd stuff will end up as retarded buffoons , which you yourself has certified.
then we can only have buffoons for bloging about this fact and other buffoons as leaders!!!
Who is a buffoon Mr guptha?
ANd why are you lying so vehemently about tejas mk1?
What is your motivation?