Search results

  1. S

    Chinese navy 075 LHD

    the 4th 075 LHD was launched...the super block assembly time in the dry dock was around 6 months...
  2. S

    Chinese navy 075 LHD

    the position of first sea trial is normally around yangtze estuary which is not far from the city center...many have spotted her. at the same time ,the first 075 is still in the south for advanced phase of sea trial (normally for the deep water sea trial)
Top