Search results

  1. vampyrbladez

    P-18/Next Generation Destroyer class (NGD)

    At least 10,000 - 12,000 tons at the very least. I can see the LR MFR sensor radar's silhouette. with 128 VLS (UVLS (?)) as a distinct possibility.
  2. vampyrbladez

    P-18/Next Generation Destroyer class (NGD)

    BHEL and GE ink MoU for development of Integrated Electric Propulsion System for the Indian Navy The MoU was signed in the presence of Jeremy Quin MP, UK Minister of Defence Procurement, Alex Ellis, British High Commissioner to India, Anurag Bajpai, Joint Secretary Defence Industrial Promotion...
  3. vampyrbladez

    P-18/Next Generation Destroyer class (NGD)

    Some interesting tidbits I found on the P-18 / NGD : https://mazagondock.in/images/pdf/Mazagon-Dock-Business-Update-Call-13112021-Transcript-181121.pdf No mention of the NGD in the February, 2022 MDL Earnings Call https://mazagondock.in/images/pdf/transcript-investor-update-call-14022022.pdf...
  4. vampyrbladez

    P-18/Next Generation Destroyer class (NGD)

    My thinking indicates there will be P 18A and P 18B of 5-6 ships each with the NGF-A and NGF-B (10-12 each) being marginally smaller and having fewer VLS equipped as compared to the P 18 class. The Indian Navy likes to order in Tranches and Blocks if you follow their acquisition of large...
  5. vampyrbladez

    P-18/Next Generation Destroyer class (NGD)

    5 NGD and 10 NGF as per the Indian Navy force doctrine released in 2018.
  6. vampyrbladez

    P-18/Next Generation Destroyer class (NGD)

    After doing some number crunching, all I can think of is : 2025 - Last 2 P17A are delivered from MDL and GRSE. Late 2025 to early 2026 - RFP released Mid 2027 - Contract signed 2029 - Keel of 1st ship laid Assuming construction of 1st ship taking 6-7 years since P17A at MDL took 5 years...
  7. vampyrbladez

    P-18/Next Generation Destroyer class (NGD)

    When do you think we will get our first NGD? What will the yards do from 2026-2030. Any ideas?
  8. vampyrbladez

    P-18/Next Generation Destroyer class (NGD)

    After 2026 when the last P17A will be delivered until 2029-30-ish when the first NGD is laid down, GRSE and MDL yards will remain vacant. To assuage the yards, 1 (MDL) + 1 (GRSE) P 17A may be ordered but there is no official confirmation or news report regarding this.
  9. vampyrbladez

    P-18/Next Generation Destroyer class (NGD)

    My guess is 2027-28 contract, 2030-ish keel laying and 2036-37 commissioning. Up to 6 of these NGD may be built AFAIK. Construction will take 6-7 years for the first ship with the next iteration taking around 5-6 years. BTW INS Kolkata was commissioned in 2014 so it will be around 22 years old...
Top