Actually, When India conducted these tests, Russian said that India shall conduct atleast 3 test in each of 3 category. Actually 4 test were required but as per them, India was very strong in simulation so they can do with 3 test in Subkilo ton, Normal nuclear test and Thermonuclear tests...