Search results

  1. Kunal Biswas

    Further Upgraded Indian T-72

    I always wanted to post this photo, Its a real pain in the rear to remove and re-fitted a new gun on these tanks, It takes no less than 3-4 or even more hours in controlled environment to remove and install a new gun on a T-72M1, The auto-loader has to be disengaged and turret has to be opened...
  2. Kunal Biswas

    Further Upgraded Indian T-72

    Korzina autoloader which is installed on T-80 and T-64 tanks holds horizontal space, because the ring of ammunition is installed within the diameter of the turret ring, it holds a remarkable 28 rounds of ammo, more than the 22 rounds carried on the T-72, The average loading speed of the...
  3. Kunal Biswas

    Further Upgraded Indian T-72

    Some interesting research papers and experiment done by Czech Republic R&D effort to increase T-72`s accuracy with 2A46 gun, By modifying turret mechanism .. This may not be related to India but Indian R&D can implement same techniques to improve T-72m1`s horrible accuracy, Further it would be...
  4. Kunal Biswas

    Further Upgraded Indian T-72

    Because, the existing engine has too many issues , One of the problem which came under limelight is posted above .. ================= Their are no 1500hp engine operational in combat ready T-72 around the globe, Only India ( Bharat pack ) and Ukraine ( 6TD-3 ) working on 1400hp-1500hp engine...
  5. Kunal Biswas

    Further Upgraded Indian T-72

    This can be done, but i doubt the Russian will allow such modifications .. The auto-loader has to be modified to accept single piece ammunition, Such an auto-loader based on current design can be made via DRDO but this is a theory at best .. ======= Present autoloader system ..
  6. Kunal Biswas

    Further Upgraded Indian T-72

    The engine is licensed made and up-rated via DRDO .. Details ..
  7. Kunal Biswas

    Further Upgraded Indian T-72

    They should replace existing T-90 engine with this uprated version ..
  8. Kunal Biswas

    Further Upgraded Indian T-72

    You should read Arjun threads as these topics are already been covered in many times before .. We don`t want to derail other threads for sake of repeating same topics over again and again ..
  9. Kunal Biswas

    Further Upgraded Indian T-72

    You should read the book call 'patton wreckers', you would know about centurions preform-ace first hand by the crews who manned these machines, The terrain and tactics everything .. The argument about bridges is a flawed because it only mention Arjun MK2 but not T-72M1 and T-90 Bhishmas, Those...
  10. Kunal Biswas

    Further Upgraded Indian T-72

    DRDO engine is actually the size of present Russian engines but produce more power, It means it can be fitted to Russian tanks also with permission .. The engine you see is a 1400hp engine from MTU in DRDO facility ..
  11. Kunal Biswas

    Further Upgraded Indian T-72

    Upgrades done by BEL to T-72M1 ..
  12. Kunal Biswas

    Further Upgraded Indian T-72

    ==================== We can safely assume that the recent upgrade consist of earlier upgrade too ..
  13. Kunal Biswas

    Further Upgraded Indian T-72

    DRDO should be given freehand to upgrade T-72M1s rather piecemeal upgrades which are directed by user ..
  14. Kunal Biswas

    Further Upgraded Indian T-72

    Its the other way around, Make better lighter tanks ..
  15. Kunal Biswas

    Further Upgraded Indian T-72

    Shared by @Bornubus
  16. Kunal Biswas

    Further Upgraded Indian T-72

    That`s a nice upgrade, I see MK1 era over top of the turret .. We need more hires photos of this upgrade ..
  17. Kunal Biswas

    Further Upgraded Indian T-72

    Their is no point posting these imported gizmos, When we are using our own gun coz their was no ToT so does Armour was shared.. Gud thing that we are forced to develop our own and set up our industry and now we are self reliant, Not just PSU is massively involved but as well as Pvt industry...
  18. Kunal Biswas

    Further Upgraded Indian T-72

    2050 as it seems, 50 tonne tank was only a requirement set by Army for DRDO .. Those bridges have to handle BM-30 and other vehicles as well which are more than 55 tons ..
  19. Kunal Biswas

    Further Upgraded Indian T-72

    Upgraded Ajaya MBT by DRDO ..
  20. Kunal Biswas

    Further Upgraded Indian T-72

    This is actually a 2000hp engine and will be tuned up for 1500hp for better and longer life as explained by @ BrutusMarcus.. The link to the source of this news is at post no #9, On this very page ..
Top