  1. sob

    HAL developing new varaint LCA-1P

    In January the previous Chairman Mr.tyagi had confirmed that 6 aircraft would be made in 2016 and the balance would be supplied till 2018. Looking realistically I would say 2019. And this corresponds to the information I have directly from HAL.
  2. sob

    HAL developing new varaint LCA-1P

    So HAL plans to take around 6 years to produce 40 aircraft and they want IAF to show interest. The maths does not add up. Is there any recent source for these figures.
  3. sob

    HAL developing new varaint LCA-1P

    HAL will take till 2019 to clear the order for 40 aircraft, and if the timetable for MK 2 is 2020 then there is no time lag.
  4. sob

    HAL developing new varaint LCA-1P

    The time frame of the new engines GE 414 need to be expedited. With the active backing of the new RM this spells good news for the LCA Project. Now we need at least one squadron in the IAF as soon as possible. MK 2 will have to develop out of the trials and regular sorties that IAF will do with...