Search results

  1. sherkhan

    Complete information and Analysis on "Sindhu" class Submarine

    The glow of the explosion on the submarine Sindhurakshak pr.877EKM Indian Navy at the pier in the port of Mumbai, 14.8.2013, the (http://kuleshovoleg.livejournal.com/ ). The first photographs of the sunken submarine Sindhurakshak pr.877EKM Indian Navy at the pier in the port of Mumbai, August...
  2. sherkhan

    Complete information and Analysis on "Sindhu" class Submarine

    - 2002 - 3 pieces pr.877EKM + 3 + 2 pcs pr.08773 items improved to Improved KILO pr.877EKM, PL Sindhuratna put the Indian Navy after modernization at the shipyard "Star" to the level of pr.08773. - 2003-2004, - 3 pieces + 4 pieces pr.877EKM pr.08773 + 2 pcs Upgrade to Improved KILO pr.877EKM...
  3. sherkhan

    Complete information and Analysis on "Sindhu" class Submarine

    The project is based on a special submarine pr.877 - in 2002 on the advertising leaflet CDB "Ruby" is a side cutting projections on the basis of a special submarine pr.877 probably designed to work on laying pipelines on the seabed. Perhaps after such equipment can be used for submarine wide...
  4. sherkhan

    Complete information and Analysis on "Sindhu" class Submarine

    Modifications: pr.877 / 08770, pr.877E, pr.877EKM (except submarines 2) pryu877LPMB (B-800) pr.877V (B-871) pr.877M / 08772 (?) / 636 / 636M pr.877EKM / 08,773 (repair with modernizaiey) pr.06363 NATO KILO KILO KILO / "KILO-III" Improved KILO Improved KILO Improved KILO-II Housing...
  5. sherkhan

    Complete information and Analysis on "Sindhu" class Submarine

    PL pr.636 / 636M with 7-blade propeller ("Military Parade", archive photo Gogs, http://forums.airbase.ru ). Submarine B-871 "Alrosa" pr.877V KILO and water jets exploded. Sevastopol, floating dock PD-30, regular upkeep, January 12, 2006 (photo - Dmitry Stogniy, http://forums.airbase.ru )...
  6. sherkhan

    Complete information and Analysis on "Sindhu" class Submarine

    Most diesel-electric submarine (type "B"). Development of the project started on the tactical and technical assignment approved by the Soviet Navy in 1974. Design was conducted CDB "Ruby" (CDB-18) together with the Research Institute. Academician Krylov, the chief designer of the project -...
Top