Search results

  1. C

    Govt looking at 100,000 MW solar power by 2022

    30ccccccccccccccccccccc
  2. C

    Govt looking at 100,000 MW solar power by 2022

    Well anyone who thinks solar power is not feasible source, those days are gone. India till now only tried Photovoltaic (PV) panels for power generation but I think the most feasible system for solar power generation is Concentrated Solar Power (CSP). CSP Explained...
Top