India's Share in Joint Fighter Project With Russia Likely to Grow

RPK

Indyakudimahan
Senior Member
Joined
Jun 29, 2009
Messages
4,970
Likes
229
Country flag
India's Share in Joint Fighter Project With Russia Likely to Grow | Defense | RIA Novosti


MOSCOW, October 25 (RIA Novosti) – India's share in research-and-development work for the joint Fifth Generation Fighter Aircraft (FGFA) project with Russia is currently limited by India's domestic industrial capabilities but will gradually increase with the project's implementation, a Russian military expert said Friday.
India's The Economic Times newspaper reported on October 17 that Indian military officials were concerned over the country's work share in the FGFA project, which is currently only 15 percent even though New Delhi is bearing 50 percent of the cost.
According to the paper, India's defense minister is expected to raise that issue during his visit to Russia beginning November 15.
"The figure cited by the Indian side reflects current capabilities of India's industry, in particular the Hindustan Aeronautics Limited [HAL] corporation," said Igor Korotchenko, head of the Moscow-based Center for Analysis of Global Arms Trade.
"With the progress in the implementation of this project, we expect the Indian engineers and designers to approach the share determined in the [Russian-Indian] agreement: 50 percent," Korotchenko said in an exclusive interview with RIA Novosti.
Russia will certainly provide all necessary knowledge and logistics support to Indian specialists, but developing skills and acquiring experience in design and development of advanced fighter aircraft takes a long time and substantial effort, the expert added.
The FGFA project began following a Russian-Indian agreement on cooperation in the development and production of the perspective multirole fighter, signed on October 18, 2007.
The Indian fighter jet will be based on the Russian single-seat Sukhoi T-50 or PAK-FA fifth-generation fighter, which now has four prototypes flying, but it will be designed to meet about 50 specific requirements by the Indian Air Force (IAF).
In December 2010, Russian state arms exporter Rosoboronexport, India's Hindustan Aeronautics Limited and Russian aircraft maker Sukhoi Company signed a preliminary design development contract worth $295 million for the new aircraft.


Currently the $11 billion final design and research-and-development contract is under negotiation between the two countries. The total program is expected to cost India about $25 billion to 30 billion.
The IAF had initially planned to order 166 single-seat and 48 twin-seat fighters, but India's chief of air staff said in October last year that New Delhi would now go for only 144 single-seat jets, with domestic production slated to begin in 2020.
 

nirranj

Regular Member
Joined
Jun 21, 2013
Messages
939
Likes
827
Country flag
Re: India's Share in Joint Fighter Project With Russia Likely to Gro

We should try to indigenise as nuch components as possible before starting the regular production.
 

rugved

Regular Member
Joined
Oct 24, 2013
Messages
290
Likes
155
Re: India's Share in Joint Fighter Project With Russia Likely to Gro

We should try to indigenise as nuch components as possible before starting the regular production.
Yes but we first need to make a start by getting equally involved in such projects and gaining the expertise needed to produce military equipment on our own.
 

aerokan

Senior Member
Joined
Nov 20, 2011
Messages
1,024
Likes
817
Country flag
Re: India's Share in Joint Fighter Project With Russia Likely to Gro

I am probably talking out of my a** here.. but where is the possibility of putting 50% Indian R&D without degrading the quality of FGFA over PAK-FA?

Air frame redesigning? I doubt it at this point if our guys can handle it in a short time trying to make it more stealthy and at the same time retaining the maneuverability of the existing model.
Radars? Do we have sufficient capability to build the new and highly capable ones especially the X-band radars?
Twin-seater?

I don't see much opportunity here without upsetting the FGFA timeframes badly. Any opinions would be appreciated.
 

EXPERT

Regular Member
Joined
Oct 20, 2012
Messages
503
Likes
329
Re: India's Share in Joint Fighter Project With Russia Likely to Gro

A country whose engineers were not be able to produce a 4th gen aircraft and a single engine for that but they want 50 % work share on R&D . How is this possible ??

They are just wasting our money nothing else , i dont see our FGFA before 2025.
 

astrafan

Regular Member
Joined
Sep 18, 2013
Messages
20
Likes
7
Re: India's Share in Joint Fighter Project With Russia Likely to Gro

A country whose engineers were not be able to produce a 4th gen aircraft and a single engine for that but they want 50 % work share on R&D . How is this possible ??

They are just wasting our money nothing else , i dont see our FGFA before 2025.
R&D is Never a waste of money, by definition.
You must have read the design objectives of the Kaveri engine project, have you also read through the target parameters, i.e. turbine inlet temperature, overall pressure ratio, thrust/weight ratio and stuff?
How many engines out there, now, operating at those parameters, including the latest copies from global 'respected' engine makers?
What if, by the time FGFA is ready to take off, we end up not needing one, by virtue of the ongoing R&D !?
Such things happen all the time.
 

JBH22

Senior Member
Joined
Jul 29, 2010
Messages
6,497
Likes
17,878
Re: India's Share in Joint Fighter Project With Russia Likely to Gro

R&D is a sunk cost so chill guys
 

Latest Replies

Global Defence

New threads

Articles

Top