India's biggest military project with Israel under scrutiny

arnabmit

Homo Communis Indus
Senior Member
Joined
Dec 25, 2012
Messages
6,242
Likes
7,522
Country flag
India's biggest military project with Israel under scrutiny | idrw.org

The government is seriously worried about a high profile Indo-Israel joint development programme for surface-to-air missiles for the Navy and the IAF at an estimated cost of Rs 13,000 crore.

The project (Navy calls it the long-range SAM and the IAF calls it the medium-range SAM) is now under intense scrutiny at various levels. In the wake of the ongoing examination, the defence ministry is believed to have put on hold all further orders for the missile, estimated to total another Rs 50,000 crore.

The joint development of LRSAM between the DRDO and the Israel Aerospace Industries (IAI) for the Navy was signed in 2006, while theMRSAM project for the IAF was signed in 2009.

The project has been delayed by almost four years, and the latest trials did not meet the operational requirements projected by the IAF and the Navy, sources said. A private company floated by the Tata group and IAI, Nova Integrated Systems, was to be the final integrator of the project, but that is no more the case.

Sources said with Nova being out of the picture, there is no clarity about who will be involved in the final integration. DRDO is believed to have suggested that it will set up the assembly line for integration in Hyderabad. However, given its role as the military research agency, the government may not agree to DRDO ending up running an assembly line.

A senior official said it was surprising that defence PSUs such as BDL (Bharat Dynamics Limited) and BEL ( Bharat Electronics Ltd) were not consulted when the project was conceptualized. A few months ago, IAI, BEL and BDL had entered into an MoU to work out a final contract for the integration of the system, sources said.

The entire project was pushed forward on the argument that an open global tender for the purchase of the missile would hugely delay its induction given the massive gaps in India's air defence, which is dependent on ageing Russian Pechora systems. However, the joint development project itself is now about four years behind schedule, sources said.

The LRSAM for the Navy was to be ready by 2010. Sources said the latest trials a few weeks ago did not meet the requirements of both Navy and IAF.

As the government takes a closer look at the project, it is clear that none of the crucial technologies of the system, such as seeker, fuses, radar, tracking system, electronic control systems etc, are coming to India, nor are they being developed by DRDO. DRDO is developing only the propellant, actuators and similar stuff. The rocket motors being developed by DRDO has also failed to meet requirements, sources said.

A source argued that the entire programme was signed only as a work share contract, not as a joint development programme. If it was a joint development programme, the intellectual property rights (IPR) of all technology developed for the project would be held jointly by India and Israel. In this case, despite India funding the entire development, it won't have IPR access to the technologies being developed in Israel.

==============================================

:fp:
 

sayareakd

Mod
Joined
Feb 17, 2009
Messages
17,734
Likes
18,952
Country flag
Looks like BDL is making only the this part of the missile




rest of the parts are being made by Israel.
 

hit&run

United States of Hindu Empire
Mod
Joined
May 29, 2009
Messages
14,104
Likes
63,370
India spends Israel learn and then they sell it to China etc.

So how we are going to get our money back and who is going to do accountability of DRDO on this.

Last time I heard many naval ships are delayed; waiting for these LR/MR SAMs.

Whole Indian weapon procurement process has become epitome of failure.

Next time when such news like JV flash on media portals one must take it with bout of sea salt and assume it is new scam in making.

People I know who build roads in Punjab do not trust others even for purchase of a paint brush. Here caches of taxpayers cash is consumed for something which is now a turning out to be a big Zero.
 

Armand2REP

CHINI EXPERT
Senior Member
Joined
Dec 17, 2009
Messages
13,811
Likes
6,734
Country flag
They would have been better off going with MBDA.
 

p2prada

Senior Member
Joined
May 25, 2009
Messages
10,234
Likes
4,015
Sensationalist reporting.

The govt knew exactly what was signed. Heck even I knew there is no IPR in the contract. Only a buy, assemble, operate setup with DRDO providing the rocket motors.

They did the Brahmos and FGFA contracts correctly, with equal sharing of IPR. But the Israeli JV was never about IPR.

The technical problems are a whole different ballgame and should be fixed quickly or else we will end up buying Russian again.
 
  • Like
Reactions: sob

Known_Unknown

Devil's Advocate
Senior Member
Joined
Apr 21, 2009
Messages
2,626
Likes
1,670
It's becoming really hard to be "nationalist" these days. Every news item is either about a scam, a rape, incompetence of some sort or a failure. Gets rather depressing after a while....now I know how Pakis must feel all the time. :(
 

sob

Mod
Joined
May 4, 2009
Messages
6,425
Likes
3,805
Country flag
So guess who is meddling once again in this case

DRDO is believed to have suggested that it will set up the assembly line for integration in Hyderabad.
This is a new slant by the Defence PSUs to go after joint ventures with Private Companies as they feel that their future is threatened.

For the Artillery he Govt. has tried to open the doors to Indian Companies in the Private Sector but all attempts will be made to ensure that they do not get any contract.
 

Latest Replies

Global Defence

New threads

Articles

Top