Project P15B Visakhapatnam class destroyer

AVERAGE INDIAN

EXORCIST
Senior Member
Joined
Sep 22, 2012
Messages
3,326
Likes
5,408
Country flag
The Project 15B vessel will retain the hull form of Kolkata class destroyers and most of its systems, there will be some significant upgrades. For example, some structural changes in the superstructure will improve stealth and include better sound and infrared suppression. The Project 15B will also differ from the Project 15A through employing a fully flush deck. This will improves stealth because of the smoothness of the overall deck with far fewer angles and corners. The displacement of each Project 15B will be approximately 7,000 tons, a 200 ton addition over the Project 15A Kolkatas.

. Project 15B will also be armed with the new Nirbhay land attack cruise missile (1,000 km range), the hypersonic Brahmos-II anti-ship cruise missile (300 km range) and an Extended Range Surface to Air Missile (ER-SAM) (100 km range).
 
Last edited:

shuvo@y2k10

Senior Member
Joined
Apr 4, 2010
Messages
2,653
Likes
6,709
Country flag
hope they plan in advance for a project 15c-desi version of aegis class destroyers.anyways when are the p-15b going to be inducted?
 

AVERAGE INDIAN

EXORCIST
Senior Member
Joined
Sep 22, 2012
Messages
3,326
Likes
5,408
Country flag
hope they plan in advance for a project 15c-desi version of aegis class destroyers.anyways when are the p-15b going to be inducted?
MDL believes that, since Project 15-B is a follow on of the 15-A, the design and planning period will be less than 1½ years. Once the design is finalised, the navy wants the first destroyer to roll out within four years, with the others completed at one-year intervals. By that ambitious timeline, if the order is placed on MDL by end-2009, the first 15-B destroyer would be commissioned in mid-2015.

i believe it will be in 2017
 

Phantom

Regular Member
Joined
Dec 24, 2013
Messages
184
Likes
121
What will be the Project 15B class named as? Read somewhere that it will be christened the Bangalore class. Is this a confirmed news?
 

ladder

Senior Member
Joined
Mar 28, 2013
Messages
7,255
Likes
12,207
Country flag
MDL believes that, since Project 15-B is a follow on of the 15-A, the design and planning period will be less than 1½ years. Once the design is finalised, the navy wants the first destroyer to roll out within four years, with the others completed at one-year intervals. By that ambitious timeline, if the order is placed on MDL by end-2009, the first 15-B destroyer would be commissioned in mid-2015.

i believe it will be in 2017
2018,2020,2022,2024 are the respective delivery years.

Read it in a article for the delivery of shafts from Russia.

Would try to dig it up and link it here.
 

rohit b3

Regular Member
Joined
Oct 25, 2012
Messages
817
Likes
1,402
Country flag
Are they using modular constuction? Can we expect them to be commissioned quicker?
 

ladder

Senior Member
Joined
Mar 28, 2013
Messages
7,255
Likes
12,207
Country flag
MDL believes that, since Project 15-B is a follow on of the 15-A, the design and planning period will be less than 1½ years. Once the design is finalised, the navy wants the first destroyer to roll out within four years, with the others completed at one-year intervals. By that ambitious timeline, if the order is placed on MDL by end-2009, the first 15-B destroyer would be commissioned in mid-2015.

i believe it will be in 2017
2018,2020,2022,2024 are the respective delivery years.

Read it in a article for the delivery of shafts from Russia.

Would try to dig it up and link it here.

The ships are due to be built sequentially in June 2018, 2020, 2022, and 2024.
Russia to help India build 4 guided-missile destroyers | Russia & India Report
 

ninja85

Regular Member
Joined
Oct 17, 2013
Messages
830
Likes
353
MDL believes that, since Project 15-B is a follow on of the 15-A, the design and planning period will be less than 1½ years. Once the design is finalised, the navy wants the first destroyer to roll out within four years, with the others completed at one-year intervals. By that ambitious timeline, if the order is placed on MDL by end-2009, the first 15-B destroyer would be commissioned in mid-2015.

i believe it will be in 2017
-------------------Laid down -------------Launched
INS Kolkata----27 September 2003--30 March 2006
INS Kochi------25 October 2005------18 September 2009
INS Chennai---21 February 2006-----1 April 2010

cost of each ship escalated to 1.9Bn$ each (11662 crore each) still no sea trials , commissioning ,
sat saal se chat rahe hai kya???
 
Last edited:

AVERAGE INDIAN

EXORCIST
Senior Member
Joined
Sep 22, 2012
Messages
3,326
Likes
5,408
Country flag
-------------------Laid down -------------Launched
INS Kolkata----27 September 2003--30 March 2006
INS Kochi------25 October 2005------18 September 2009
INS Chennai---21 February 2006-----1 April 2010

cost of each ship escalated to 1.9Bn$ each (11662 crore each) still no sea trials , commissioning ,
sat saal se chat rahe hai kya???
easy on the caps dude and i am not the one building the ships i am just another tax payer like you
 

Illusive

Senior Member
Joined
Jun 20, 2010
Messages
3,674
Likes
7,312
Country flag
After P15b do you guys think we should move towards bigger destroyers like a 15000 ton displacement DDG like the Zumwalt or stick to the same size and improve it.
 

Sea Eagle

Senior Member
Joined
Feb 16, 2014
Messages
1,673
Likes
683
:hmm: Drdo or any other Private Firm should try to build a universal Vls capable of launching AShMs, LACMs, SAMs... In this way we can accomodate more missiles on a single ship and probably can keep the same tonnage and design that we have now.
 

Eastman

Regular Member
Joined
Sep 25, 2013
Messages
405
Likes
233
Country flag
:hmm: Drdo or any other Private Firm should try to build a universal Vls capable of launching AShMs, LACMs, SAMs... In this way we can accomodate more missiles on a single ship and probably can keep the same tonnage and design that we have now.
L&T make universal missile launchers :truestory:
</title> <link href="../Common/includes/lnt_product.css" rel="stylesheet" type="text/css" /> <link href="../Common/includes/lnt_style.css" type="text/css" rel="stylesheet" /> <script src="../Common/SpryAssets/SpryTabbedPanels.js" type="text/javascrip
</title> <link href="../Common/includes/lnt_product.css" rel="stylesheet" type="text/css" /> <link href="../Common/includes/lnt_style.css" type="text/css" rel="stylesheet" /> <script src="../Common/SpryAssets/SpryTabbedPanels.js" type="text/javascrip
Some of the launcher in L&T's range of products are:
Universal Missile Launcher : a multi-mode launcher
Multi Barrel Rocket Launcher: a high-positioning-accuracy platform with programmable option for Single / Salvo firing
Anti-Tank Guided-Missile Carrier
Quick Reaction Surface-to-Air Missile Launcher
 

Warhawk

Regular Member
Joined
Jun 3, 2014
Messages
71
Likes
112
The Gas Turbine engines are coming from Ukraine..

SE "Zorya"- "Mashproject" signed the contract with Indian customer for delivery of gas turbine power plants for ships that will be built at Mumbai shipyard. The contract is concluded with the parties following the results of the tender of 2012. Under the terms of the contract the enterprise will equip four new ships (Project 15B) during the period of 2016 to 2019.
The enterprise already equips the third series of such ships. In 1993-1995 the power units were delivered to India for three ships of the Project 15 (Delhi type) and in 2005-2006 for three ships of the Project 15A (Kolkata type).
The enterprise will produce an updated gas turbine power unit with microprocessor control system.

Their dates seem to conflict the one in the report by Indrus. If the last unit will be delivered by 2019 it won't take MDL 6 years to deliver the final destroyer :)
 

Global Defence