HAL HJT-36 Sitara Stage-2 Jet Trainer.

Discussion in 'Indian Air Force' started by Tshering22, Jan 20, 2011.

  1. Tshering22

    Tshering22 Sikkimese Saber Senior Member

    Joined:
    Aug 20, 2010
    Messages:
    4,404
    Likes Received:
    2,783
    Location:
    Gangtok, Sikkim, India
    People, it has been 3 years since we all have been hearing about HAL's IJT-36 Sitara that is going to replace the Kiran now and then. However one thing I don't understand:

    When will it get into IAF and IN?

    [​IMG]

    The design is complete, the Russian AL-55 engines are doing good and proven, the aircraft has even performed once or twice, then what is stopping IAF from taking it? Earlier there was engine and hydraulics problem but now they say it is solved.

    So why the delay in IOC? It is not going to play the role of Tejas to go to serious weaponization tests except a few types of dumb bombs or MRLs. Anyone has any information on Sitara?

    Thanks.
     
  2.  
  3. Welcome

    Welcome Regular Member

    Joined:
    Jul 22, 2010
    Messages:
    188
    Likes Received:
    54
    Location:
    Gorakhpur (U.P.)
    i think IAF officers are waiting for commission. if HAL they failed to give it than IAF will again find more problem in it and at last they will buy some more British trainer after meeting in a luxury room of 5 star hotel with lot of euros and some pretty girls. not need for trial or some thing. And after some time HAL will dumped it's Sitara projects and will ask billion dollar for new projects. Again HAL and DRDO will buy all equipment of aircraft from different countries and they will manufactured it in india after 30 years of research and 5000% hike in budget, at last they will paint MADE IN INDIA on it. and you know what next. My Dear friend it's a prescribed chain which you can't break.
     
    janme likes this.
  4. SATISH

    SATISH DFI Technocrat Stars and Ambassadors

    Joined:
    Mar 7, 2009
    Messages:
    2,006
    Likes Received:
    228
    Something went wrong in the spin tests..so the delay.
     
  5. ppgj

    ppgj Senior Member Senior Member

    Joined:
    Aug 13, 2009
    Messages:
    2,029
    Likes Received:
    156
    Tshering : IOC for IJT Sitara is june 2011. it was told by HAL chief mr. ashok nayak at LCA IOC function. it was in one of the Tarmak article IIRC.

    satish, i guess initially they did face some spin issues which they overcame by adding 'strakes'. this was before the russian engine was mated and since being tested IMO. you can see the strakes here -

    [​IMG]

    just forward of the IAF roundel.
     
    nitesh, Kunal Biswas and A.V. like this.
  6. Tshering22

    Tshering22 Sikkimese Saber Senior Member

    Joined:
    Aug 20, 2010
    Messages:
    4,404
    Likes Received:
    2,783
    Location:
    Gangtok, Sikkim, India
    ^^ Thanks for the info man. Really appreciate it. But hopefully the induction to start this year because there's simply no need for going as deep as a second-stage FOC for this. They already tested limited weapons that it can carry (total 5 hardpoints), the flight tests had some issues and now solved. SO there's absolutely no reason to make it another Tejas issue.

    Kiran needs to be replaced by Sitara ASAP. The Sagar Pawan team of IN already has seen a crash in that Hyderabad air show and not to mention the multiple crashes of Kirans sometime ago.
     
    nitesh likes this.
  7. debasree

    debasree Regular Member

    Joined:
    Feb 7, 2011
    Messages:
    811
    Likes Received:
    82
    Location:
    Calcutta, India, India
    why dont they use it like a-10 tank busters.
     
  8. venkat

    venkat Regular Member

    Joined:
    Apr 6, 2009
    Messages:
    904
    Likes Received:
    195
    Aircraft crashes during routine test flight; pilots safe
    Bangalore/Chennai, Apr 28, (PTI):

    An Intermediate Jet Trainer (IJT) prototype aircraft crashed during routine flight test in Tamil Nadu's Krishnagiri district today, but both test pilots ejected to safety, police said.


    The IJT S-3466, which was earlier reported as an Advanced Jet Trainer, was on routine flight testing when the mishap occurred in the afternoon, Hindustan Aeronautics Limited said in Bangalore.

    The aircraft crashed in a sparsely populated area at Lakshmipuram, preventing any collateral casualties, police said. An IAF helicopter flew the pilots back to Bangalore, they said.
    A court of enquiry has been constituted into the crash, HAL said.


    http://www.deccanherald.com/content/157367/hal-plane-bangalore-based-pilots.html
     
  9. JBH22

    JBH22 Senior Member Senior Member

    Joined:
    Jul 29, 2010
    Messages:
    3,620
    Likes Received:
    2,390
    India's Intermediate Jet Trainer [IJT] HJT-36, Sitara

     
    Last edited by a moderator: May 10, 2015
    Zebra, Tshering22 and A.V. like this.
  10. Tshering22

    Tshering22 Sikkimese Saber Senior Member

    Joined:
    Aug 20, 2010
    Messages:
    4,404
    Likes Received:
    2,783
    Location:
    Gangtok, Sikkim, India
    ^^ I really hope that it comes next year.
     
  11. nitesh

    nitesh Mob Control Manager Stars and Ambassadors

    Joined:
    Feb 12, 2009
    Messages:
    7,541
    Likes Received:
    1,260
    Location:
    Bangalore
    Great info, was not aware of it. Can you share the details of weapons tested with it? Thx in advance
     
  12. Payeng

    Payeng Daku Mongol Singh

    Joined:
    Mar 7, 2009
    Messages:
    2,521
    Likes Received:
    767
    Location:
    Neistan
    Lets collect information about this program.............

    The Sitara is a stage-2 conventional jet trainer with low swept wings design planned for induction in Indian Air Force and the Indian Navy. It is planned for the succesor of HJT-16 Kiran which is currently being operated by by the Indian Air Force and the Naval air wing.

    HAL started design working on it in 1997. In 1999, following reviews by the Indian Air Force, the Government of India awarded HAL a contract for development, testing and certification of two prototype IJT aircraft.

    The first and second prototypes of the HJT-36, labeled PT-1 and PT-2, flew on 7 March 2003 and in March 2004, respectively. The program was then delayed with the Air Force assessing the SNECMA Turbomeca Larzac engine, with 14.1 kN of thrust, as under-powered. In response, in August 2005, HAL reached a deal to replace the SNECMA engine with the NPO Saturn AL-55I with 16.9 kN of thrust. The deal also provided for license-production of the engine in India by HAL.

    Following ground taxiing trials with AL-55I engine, the flight tests with the new engine started on 9 May 2009.

    Incidents:
    PT-1 has suffered some serious damage when the canopy flew open during Feburary 2007 Aero India Show at Yalahanka Air base in Bangalore the aircraft veer to the side of the runway. the incident damaged the starboard wing, the test pilot escaped unharmed, the aircraft was repaired and returned to service later.

    On 4 February 2009, PT-2 landed on its belly after a routine aerobatic sortie. There was structural damage to the undercarriage and one of the wing tips. Pilot error was the cause of the incident.

    On 28 April 2011, a prototype Sitara crashed in Tamil nadu. Both crew ejected safely.
     
    Kunal Biswas likes this.
  13. Payeng

    Payeng Daku Mongol Singh

    Joined:
    Mar 7, 2009
    Messages:
    2,521
    Likes Received:
    767
    Location:
    Neistan
    [​IMG]
    [​IMG]
    [​IMG]
    [​IMG]
     
    Last edited: Jan 13, 2012
    Kunal Biswas likes this.
  14. Payeng

    Payeng Daku Mongol Singh

    Joined:
    Mar 7, 2009
    Messages:
    2,521
    Likes Received:
    767
    Location:
    Neistan
  15. Payeng

    Payeng Daku Mongol Singh

    Joined:
    Mar 7, 2009
    Messages:
    2,521
    Likes Received:
    767
    Location:
    Neistan
  16. Payeng

    Payeng Daku Mongol Singh

    Joined:
    Mar 7, 2009
    Messages:
    2,521
    Likes Received:
    767
    Location:
    Neistan
    Specifications

    General characteristics
    Crew: 2, student and instructor
    Length: 10.91m (36 ft 1 in)
    Wingspan: 10.00 m (32 ft 10 in)
    Height: 4.13m (14 ft 5 in)
    Max takeoff weight: 4,600 kg (10,000 lb)
    Powerplant: 1 × NPO Saturn AL-55I non-afterburning turbofan, 16.9kN (4,500 lbf)
    Performance
    Maximum speed: Mach 0.80 /1,000 kilometres per hour/620 mph
    Range: 1,000 kilometres (620 mi)
    Service ceiling: 9,000 metres (30,000 ft)
    Endurance: 3 hours
    Maximum Dive Speed: 950 km/h
    Maximum Load Factor: +7.0/-2.5 g
    Armament
    5 x hardpoints with up to 1,000 kg (2,200 lb)
    1 × 23 mm cannon (optional)

    About a quarter of the aircraft's line replaceable units are common between it and the HAL Tejas trainer variant
     
    Last edited: Jan 13, 2012
    Kunal Biswas likes this.
  17. Shaitan

    Shaitan Zandu balm all day Senior Member

    Joined:
    Aug 3, 2010
    Messages:
    3,400
    Likes Received:
    3,406
    Location:
    Judica
     
    Last edited by a moderator: May 10, 2015
    Tomcat and Payeng like this.
  18. bhramos

    bhramos Elite Member Elite Member

    Joined:
    Mar 21, 2009
    Messages:
    13,207
    Likes Received:
    6,638
    Location:
    Telangana/India/Bharat
    all this pics are old pics......
    the pics you posted in IAF colours are current one..... which have fins near the cockpit... similar to this one
    [​IMG]

    RIP to that Pilot
     
  19. Payeng

    Payeng Daku Mongol Singh

    Joined:
    Mar 7, 2009
    Messages:
    2,521
    Likes Received:
    767
    Location:
    Neistan
    ^^ yeah I am just describing the history of development in short, is there any difference in between the design, any modification?
     
  20. Zebra

    Zebra Senior Member Senior Member

    Joined:
    Mar 18, 2011
    Messages:
    6,009
    Likes Received:
    2,251
    After Basic, Intermediate Trainer Crisis Looms For IAF
    Monday, May 07, 2012

    [​IMG]
    HAL HJT-36 Sitara | Photo Courtesy Vayu Aerospace

    Just about the time the Indian Air Force has begun to feel a little reassured that it will be able to conclude a contract for desperately needed basic propeller trainers, another equally daunting challenge has popped up. By early 2014, the IAF's 81 HJT-16 Kiran Mk.1 & Mk.2 intermediate jet trainers will stop flying, reaching the end of their total technical life. Now the Kiran's replacement, the HJT-36 Sitara, was supposed to have begun deliveries in June this year. The programme hasn't even achieved initial operational clearance (IOC), originally scheduled for July 2011, a milestone indefinitely put off after a prototype crash three months before it.

    Now here's the thing: the IAF had hoped the induction of the HJT-36 and the phase out of the Kiran would overlap, allowing for a small period of time when both aircraft would be operational together. This, now, almost certainly won't be the case, say sources, considering the substantial proving work the HJT-36 still has ahead of it before it is ready for final operational clearance. And under no circumstances can the Kirans be pushed beyond early 2014. Therefore, the prospect (hopefully) of having a small number of new propeller trainers, a full fleet of advanced jet trainers and no Stage-2 aircraft is becoming increasingly real. In fact, the IAF is already accounting for such a scenario. The IAF has no plans to buy intermediate trainers from abroad. But remember, that's precisely what they once said about basic trainers as well.

    The IAF signed a contract with HAL for 12 Limited Series Production (LSP) HJT-36 aircraft in March 2006 and 73 fully certified aircraft in March 2010 with deliveries scheduled from June 2012. As the IAF said to a recent Parliamentary committee, "The project is running behind schedule."

    Livefist
     
    Kunal Biswas likes this.
  21. Ganesh2691

    Ganesh2691 Regular Member

    Joined:
    Mar 4, 2012
    Messages:
    216
    Likes Received:
    297
    HAL’s HJT-36 Sitara Project Struggling

    lack of news on HJT-36 and its current status , prompted idrw.org to do some digging with its reliable sources to get the current status of the project , in what ever we have put together till now , we can only say Project is struggling with many technical difficulties .

    Next year HJT-36 will complete 10 years of it first flight ( 2003 ) but its unlikely that engineers in HAL will plan a big celebration or even if they do they will keep it low key event . speed at which the project was sanctioned and same speed was shown in development of the first PT-1 aircraft in next 18 months of sanction but after that the project has seen downhill in development and testing front .

    In 2007 and 2009 both PT-1 and PT-2 suffered minor crashes which lead to serious delays in the program , but change in the engine requirement by Indian air force meant that Program was stalled in flight tests since many of tests had to be re validated with the new engine , First two aircraft were initially powered by a SNECMA Turbomeca Larzac 04-H-20 non-afterburning turbofan developing 14.12 kN of thrust. but change of ASR by IAF in mid 2005 meant a new engine had to be found and selected.

    NPO Saturn AL-55I was selected which is a scaled-down version of the AL-31FP engine that flies the Su-30 MKI combat aircraft. but it was a non-existing engine then , and whole development of his engine had to be funded by India and flight worthy certification and manufacturing saw two years of delays before it was integrated with IJT .

    Sources informed us that IJT ( S-3466) which had serious crash On 28 April 2011, where both the pilots were able to eject safely but suffered serious spinal injuries and fractures was actually powered by NPO supplied Saturn AL-55I engine and the aircraft was totally destroyed . sources inform us that engine suffered technical problems resulting into crash , even LSP-1/2 IJT which had been integrated with AL-55I engines were grounded , due to which whole program suffered major set back .

    Another sources have told us that due to engine change wing had to be re-aligned along with some minor changes to the fuselage and aircraft also suffered set backs in flight test since many flight characters had to be re-tested with new engines , the aircraft also suffered in spin tests as per sources .

    Another Sources have told idrw.org had IJT-36 will be able to hit Production line only in early 2015 and Indian air force will be forced to use Kiran Mk-II aircraft even further then planned before it was due for retirement . Indian air force has been monitoring its flight tests closely now . But even HAL and IAF doesn’t want to set any time frame before aircraft gets its IOC or FOC .

    IAF currently plans to purchase 60 more Bae Ajt Hawks on top of 20 Bae Ajt Hawks for Surya kirans anticipating delays in IJT project .

    HAL’s HJT-36 Sitara Project Struggling | idrw.org
     