Workers walk on the construction site of the Jiaxing-Shaoxing Sea-Crossing Bridge despite cold weather in Haining, east China's Zhejiang Province, Jan. 2, 2013. The Jiaxing-Shaoxing Sea-Crossing Bridge, which will be the second sea-crossing bridge of Zhejiang Province, is expected to halve the driving time from Shaoxing to Shanghai to 1.5 hours in east China after putting into use in June of 2013. (Xinhua/Xu Yu)
the bridge is 36 KM in length and six lane, with a designed speed of 100 km/h on the bridge. It cost 11.8 billion RMB some 117 Billion rupees.
Workers keep on working on the construction site of the Jiaxing-Shaoxing Sea-Crossing Bridge despite cold weather in Haining,
Map: the dash-line in yellow is the location of this bridge.