Chongqing Innercity Rail Route No.1 Da-Sha section Opens Dec 20, 2012

ShabiKB

Tihar Jail
Banned
Joined
Nov 25, 2012
Messages
173
Likes
74

From University City to Shapingba, Total lengnth 20.8 KM, started from 2007, cost around 8.1 Billion RMB, some 1.3 Billion US Dollars.





Lots of new technologies were used in this projects, including new U-shaped beam structure, recycled breaking system energy absortion, etc.
 
  • Like
Reactions: nrj

ShabiKB

Tihar Jail
Banned
Joined
Nov 25, 2012
Messages
173
Likes
74
Re: Chongqing Innercity Rail Route No.1 Da-Sha section Opens Dec 20, 2

I still think this is the most convenient technology Inida should induct to its bigger cities, elevated roads greatly reduced the cost of land acquisition, easy to operate and pollutionless. Most important, low cost.
 
Last edited:

ShabiKB

Tihar Jail
Banned
Joined
Nov 25, 2012
Messages
173
Likes
74
Re: Chongqing Innercity Rail Route No.1 Da-Sha section Opens Dec 20, 2

I still think this is the most convenient technology Inida should induct to its bigger cities, elevated roads greatly reduced the cost of land acquisition, easy to operate and pollutionless. Most important, low cost.
See these roads are even integrated with local surface highway, in this case, the cost of land acquisition may be a stunning 0.
 

Latest Replies

Global Defence

New threads

Articles

Top